90-XX OPERATIONS RESEARCH, MATHEMATICAL PROGRAMMING
Refine
Year of publication
Document Type
- ZIB-Report (175)
- Master's Thesis (17)
- Bachelor's Thesis (9)
- Doctoral Thesis (6)
- Article (2)
- In Proceedings (1)
Keywords
Institute
- Mathematical Optimization (156)
- Mathematical Optimization Methods (34)
- Network Optimization (29)
- Applied Algorithmic Intelligence Methods (14)
- AI in Society, Science, and Technology (9)
- Mathematics of Telecommunication (7)
- Mathematics of Transportation and Logistics (6)
- Mathematical Algorithmic Intelligence (4)
- Numerical Mathematics (4)
- ZIB Allgemein (4)
In dieser Arbeit wird die Platzierung von Ladestationen für Elektrobusse untersucht. Dabei soll für eine Menge an gegebenen Linien eine Menge an Ladestationen gefunden werden, sodass jede Linie mit Nutzung der Ladestationen befahren werden kann und gleichzeitig die Kosten minimal sind. Zunächst wird der Fall betrachtet, dass die Batterie an jeder Station komplett vollgeladen werden könnte. Dieses Problem stellt sich als NP-schwer heraus. Für einige einfachere Fällewerden zudem Algorithmen entwickelt und untersucht. Anschließend wird der Fall einer unbegrenzt großen Batterie betrachtet, wobei an jeder Station derselbe Wert geladen werden kann. Auch dieses Problem ist NP-schwer. Erneut werden Algorithmen zur Lösung vereinfachter Problemstellungen gegeben und analysiert. Wird zudem angenommen, an jeder Station würde ein individueller Wert geladen, so ist das Problem schon für nur eine einzige Linie NP-schwer. Dennoch werden zwei exakte und ein approximierender Algorithmus entwickelt. Schließlich wird eine Batteriekapazität hinzugefügt und die zuvor entwickelten Algorithmen
werden entsprechend angepasst. Für die abschließende Problemdefinition werden verschiedene Batteriegrößen betrachtet und es werden zwei gemischt-ganzzahlige Programme aufgestellt. Anhand von existierenden Buslinien aus Berlin werden diese untersucht. Dabei stellt sich heraus, dass die Batteriekosten einen deutlich größeren Teil der Kosten ausmachen als die Ladestationen. Zudem sollten kleinere Batterien statt größerer und mehr Ladestationen genutzt werden.
In this paper we introduce a technique to produce tighter cutting planes for mixed-integer non-linear programs. Usually, a cutting plane is generated to cut off a specific infeasible point. The underlying idea is to use the infeasible point to restrict the feasible region in order to obtain a tighter domain. To ensure validity, we require that every valid cut separating the infeasible point from the restricted feasible region is still valid for the original feasible region. We translate this requirement in terms of the separation problem and the reverse polar. In particular, if the reverse polar of the restricted feasible region is the same as the reverse polar of the feasible region, then any cut valid for the restricted feasible region that \emph{separates} the infeasible point, is valid for the feasible region. We show that the reverse polar of the \emph{visible points} of the feasible region from the infeasible point coincides with the reverse polar of the feasible region. In the special where the feasible region is described by a single non-convex constraint intersected with a convex set we provide a characterization of the visible points. Furthermore, when the non-convex constraint is quadratic the characterization is particularly simple. We also provide an extended formulation for a relaxation of the visible points when the non-convex constraint is a general polynomial. Finally, we give some conditions under which for a given set there is an inclusion-wise smallest set, in some predefined family of sets, whose reverse polars coincide.
The covering of a graph with (possibly disjoint) connected subgraphs is a fundamental problem in graph theory. In this paper, we study a version to cover a graph's vertices by connected subgraphs subject to lower and upper weight bounds, and propose a column generation approach to dynamically generate feasible and promising subgraphs. Our focus is on the solution of the pricing problem which turns out to be a variant of the NP-hard Maximum Weight Connected Subgraph Problem. We compare different formulations to handle connectivity, and find that a single-commodity flow formulation performs best. This is notable since the respective literature seems to have dismissed this formulation. We improve it to a new coarse-to-fine flow formulation that is theoretically and computationally superior, especially for large instances with many vertices of degree 2 like highway networks, where it provides a speed-up factor of 10 over the non-flow-based formulations. We also propose a preprocessing method that exploits a median property of weight constrained subgraphs, a primal heuristic, and a local search heuristic. In an extensive computational study we evaluate the presented connectivity formulations on different classes of instances, and demonstrate the effectiveness of the proposed enhancements. Their speed-ups essentially multiply to an overall factor of 20. Overall, our approach allows the reliabe solution of instances with several hundreds of nodes in a few minutes. These findings are further corroborated in a comparison to existing districting models on a set of test instances from the literature.
Software for mixed-integer linear programming can return incorrect results for a number of reasons, one being the use of inexact floating-point arithmetic. Even solvers that employ exact arithmetic may suffer from programming or algorithmic errors, motivating the desire for a way to produce independently verifiable certificates of claimed results. Due to the complex nature of state-of-the-art MILP solution algorithms, the ideal form of such a certificate is not entirely clear. This paper proposes such a certificate format, illustrating its capabilities and structure through examples. The certificate format is designed with simplicity in mind and is composed of a list of statements that can be sequentially verified using a limited number of simple yet powerful inference rules. We present a supplementary verification tool for compressing and checking these certificates independently of how they were created. We report computational results on a selection of mixed-integer linear programming instances from the literature. To this end, we have extended the exact rational version of the MIP solver SCIP to produce such certificates.
One of the most fundamental ingredients in mixed-integer nonlinear programming solvers is the well- known McCormick relaxation for a product of two variables x and y over a box-constrained domain. The starting point of this paper is the fact that the convex hull of the graph of xy can be much tighter when computed over a strict, non-rectangular subset of the box. In order to exploit this in practice, we propose to compute valid linear inequalities for the projection of the feasible region onto the x-y-space by solving a sequence of linear programs akin to optimization-based bound tightening. These valid inequalities allow us to employ results from the literature to strengthen the classical McCormick relaxation. As a consequence, we obtain a stronger convexification procedure that exploits problem structure and can benefit from supplementary information obtained during the branch-and bound algorithm such as an objective cutoff. We complement this by a new bound tightening procedure that efficiently computes the best possible bounds for x, y, and xy over the available projections. Our computational evaluation using the academic solver SCIP exhibit that the proposed methods are applicable to a large portion of the public test library MINLPLib and help to improve performance significantly.
In the context of gas transmission in decoupled entry-exit systems, many approaches to determine the network capacity are based on the evaluation of realistic and severe transport situations. In this paper, we review the Reference Point Method, which is an algorithm used in practice to generate a set of scenarios using the so-called transport moment as a measure for severity. We introduce a new algorithm for finding severe transport situations that considers an actual routing of the flow through the network and is designed to handle issues arising from cyclic structures in a more dynamical manner. Further, in order to better approximate the physics of gas, an alternative, potential based flow formulation is proposed. The report concludes with a case study based on data from the benchmark library GasLib.
Air freight is usually shipped in standardized unit load devices (ULDs).
The planning process for the consolidation of transit cargo from inbound flights or locally emerging shipments into ULDs for outbound flights is called build-up scheduling.
More specifically, outbound ULDs must be assigned a time and a workstation subject to both workstation capacity constraints and the availability of shipments which in turn depends on break-down decisions for incoming ULDs.
ULDs scheduled for the same outbound flight should be built up in temporal and spatial proximity.
This serves both to minimize overhead in transportation times and to allow workers to move freight between ULDs.
We propose to address this requirement by processing ULDs for the same outbound flight in batches.
For the above build-up scheduling problem, we introduce a multi-commodity network design model.
Outbound flights are modeled as commodities; transit cargo is represented by cargo flow volume and unpack and batch decisions are represented as design variables.
The model is solved with standard MIP solvers on a set of benchmark data.
For instances with a limited number of resource conflicts, near-optimal solutions are found in under two hours for a whole week of operations.
We present two algorithms to solve a 3-objective optimization problem arising in telecommunications access network planning, the k-Architecture Connected Facility Location Problem. The methods can also be used to solve any 3-objective integer linear programming model and can be extended to the multiobjective case. We give some exemplary computations using small and medium-sized instances for our problem.
In graphical representations of public transportation networks, there is often some degree of uncertainty in the arc values, due to delays or transfer times. This uncertainty can be expressed as a parameterized weight on the transfer arcs. Classical shortest path algorithms often have difficulty handling parameterized arc weights and a tropical geometry approach has been shown as a possible solution. The connection between the classical shortest path problem and tropical geometry is well establish: Tropically multiplying the n × n adjacency matrix of a graph with itself n − 1 times results in the so-called Kleene star, and is a matrix-form solution to the all-pairs shortest path problem. Michael Joswig and Benjamin Schröter showed in their paper The Tropical Geometry of Shortest Paths that the same method can be used to find the solution to the all-pairs shortest path problem even in the case of variable arc weights and they proposed an algorithm to solve the single-target shortest path problem in such a case. The solution takes the form of a polyhedral subdivision of the parameter space. As the number of variable arc weights grows, the time needed to execute an implementation of this algorithm grows exponentially. As the size of a public transportation network grows, the number of variable arc weights grows exponentially as well. However, it has been observed that in public transportation networks, there are usually only a few possible shortest routes. Geometrically, this means that there should be few polyhedra in the polyhedral subdivision. This algorithm is used on an example of a real-world public transportation network and an analysis of the polyhedral subdivision is made. Then a geometrical approach is used to analyze the impact of limiting the number of transfers, and thereby limiting the number of parameterized arcs used, as an estimation of the solution to the all-pairs shortest path problem
In this paper we study the cost-optimal deployment of optical access networks considering variants of the problem such as fiber to the home (FTTH), fiber to the building (FTTB), fiber to the curb (FTTC), or fiber to the neighborhood (FTTN). We identify the combinatorial structures of the most important sub-problems arising in this area and model these, e.g., as capacitated facility location, concentrator location, or Steiner tree problems. We discuss modeling alternatives as well. We finally construct a “unified” integer programming model that combines all sub-models and provides a global view of all these FTTx problems. We also summarize computational studies of various special cases.