Enhancement of the BAM Fire Test Stand for Testing a Large Transport Package for Radioactive Materials

  • Packages for the transport of spent nuclear fuel are designed to endure severe accidents. To obtain approval, these transport packages must adhere to the specification-based criteria of the international transport regulations SSR-6 of the International Atomic Energy Agency (IAEA). To ensure compliance with these requirements, specific mechanical and thermal tests need to be addressed with respect to the package type. Typically, SSR-6 prescribes a mechanical test followed by a thermal fire test as part of different testing scenarios. To approve the latter test of the sequence, BAM performs calorimeter tests in advance with so-called fire reference packages for characterizing the actual fire and its impact on the package to be tested. Packages are designed with different geometry sizes depending on their purpose. For previous tests, the implemented test setups in the fire test stand were sufficiently dimensioned and could cover all requirements in this respect. However, to coverPackages for the transport of spent nuclear fuel are designed to endure severe accidents. To obtain approval, these transport packages must adhere to the specification-based criteria of the international transport regulations SSR-6 of the International Atomic Energy Agency (IAEA). To ensure compliance with these requirements, specific mechanical and thermal tests need to be addressed with respect to the package type. Typically, SSR-6 prescribes a mechanical test followed by a thermal fire test as part of different testing scenarios. To approve the latter test of the sequence, BAM performs calorimeter tests in advance with so-called fire reference packages for characterizing the actual fire and its impact on the package to be tested. Packages are designed with different geometry sizes depending on their purpose. For previous tests, the implemented test setups in the fire test stand were sufficiently dimensioned and could cover all requirements in this respect. However, to cover additional testing needs in the future, BAM is expanding the test setup for the purpose of testing significantly larger packages. In previous test setups one ring burner for propane surrounding the test specimen was sufficient. The limiting size in this configuration was the design height of the transport package to be tested. According to the thermal test of the IAEA-Regulations [1], a 30-minute fully engulfing 800°C pool fire or an equally severe fire, e.g., propane gas fire, must be applied to the transport package. Possible adjustments such as nozzle cross-section and propane mass flow can be adjusted to a certain extent. Further modifications, to cover significantly higher and larger packages all-around with a fully engulfing fire, must be accomplished with an additional, second burner ring. Both burner rings had the same dimensions and were mounted on top of each other at different heights to create a significantly larger volume of fire that completely engulfs the package including its impact limiter. To meet the IAEA regulatory boundary conditions, the enhanced fire test stand with the second burner ring is tested with a large fire reference package and will then be used for real-size transport packages after all parameters are successfully met. This fire reference package represents the external geometry of a generic transport cask for radioactive material and is equipped with numerous temperature sensors to record temperature curves at the interior wall surfaces.zeige mehrzeige weniger

Volltext Dateien herunterladen

  • RAMTrans_2024_Enhancement of BAM fire test stand.pdf
    eng

Metadaten exportieren

Weitere Dienste

Teilen auf Twitter Suche bei Google Scholar Anzahl der Zugriffe auf dieses Dokument
Metadaten
Autor*innen:Thomas Quercetti, Martin Feldkamp, Tobias Gleim, Andre Musolff, Jan Werner, Frank Wille
Dokumenttyp:Beitrag zu einem Tagungsband
Veröffentlichungsform:Graue Literatur
Sprache:Englisch
Titel des übergeordneten Werkes (Englisch):Proceedings of RAMTrans 2024
Jahr der Erstveröffentlichung:2024
Organisationseinheit der BAM:3 Gefahrgutumschließungen; Energiespeicher
3 Gefahrgutumschließungen; Energiespeicher / 3.3 Sicherheit von Transportbehältern
Herausgeber (Institution):Nuclear Institute
Erste Seite:1
Letzte Seite:7
DDC-Klassifikation:Technik, Medizin, angewandte Wissenschaften / Ingenieurwissenschaften / Angewandte Physik
Freie Schlagwörter:Fire testing; Transport package
Full-scale
Themenfelder/Aktivitätsfelder der BAM:Energie
Energie / Kerntechnische Entsorgung
Veranstaltung:RAMTrans 2024
Veranstaltungsort:London, United Kingdom
Beginndatum der Veranstaltung:14.05.2024
Enddatum der Veranstaltung:17.05.2024
Verfügbarkeit des Dokuments:Datei im Netzwerk der BAM verfügbar ("Closed Access")
Datum der Freischaltung:18.06.2024
Referierte Publikation:Nein
Einverstanden
Diese Webseite verwendet technisch erforderliche Session-Cookies. Durch die weitere Nutzung der Webseite stimmen Sie diesem zu. Unsere Datenschutzerklärung finden Sie hier.