OWEC repowering from a structural engineering and research perspective
- A significant number of new wind farms has to be installed and, at the same time, existing wind farms reaching the end of their planned life need to be reused efficiently to ensure that the ambitous goals for deploying offshore wind are met. Some relevant reuse alternatives for offshore wind farms are lifetime extension, repowering utilizing existing substructures and full replacement. In this presentation - starting from experience gained from extending the lifetime of the of the U1 metro viaduct in Berlin - we discuss end-of-life decision making in offshore wind. We focus particularly on issues concerning substructures and highlight existing challenges and opprtunities in research and development.
Autor*innen: | Matthias BaeßlerORCiD |
---|---|
Koautor*innen: | Ronald SchneiderORCiD |
Dokumenttyp: | Vortrag |
Veröffentlichungsform: | Präsentation |
Sprache: | Englisch |
Jahr der Erstveröffentlichung: | 2023 |
Organisationseinheit der BAM: | 7 Bauwerkssicherheit |
7 Bauwerkssicherheit / 7.2 Ingenieurbau | |
DDC-Klassifikation: | Technik, Medizin, angewandte Wissenschaften / Ingenieurwissenschaften / Angewandte Physik |
Freie Schlagwörter: | End-of-life decision making; Offshore wind; Repowering; Substructures |
Themenfelder/Aktivitätsfelder der BAM: | Energie |
Veranstaltung: | RWE RePowering Event |
Veranstaltungsort: | Wilhelmshaven, Germany |
Beginndatum der Veranstaltung: | 10.10.2023 |
Enddatum der Veranstaltung: | 12.10.2023 |
Verfügbarkeit des Dokuments: | Datei im Netzwerk der BAM verfügbar ("Closed Access") |
Datum der Freischaltung: | 24.10.2023 |
Referierte Publikation: | Nein |
Eingeladener Vortrag: | Nein |