Extending interim storage of spent nuclear fuel: what are the needs and consequences?
- This presentation addresses the current German policy in nuclear waste management and illustrates significant changes throughout the last decades. With the reset of the high level waste repository siting process in 2013 the need for extending interim storage beyond initial license periods will become a future challenge. For that purpose knowledge needs to be enhanced and data gaps need to be closed timely. In addition, international collaboration in R&D and regulatory improvements are explained.
Autor*innen: | Holger Völzke |
---|---|
Dokumenttyp: | Vortrag |
Veröffentlichungsform: | Präsentation |
Sprache: | Englisch |
Jahr der Erstveröffentlichung: | 2016 |
DDC-Klassifikation: | Technik, Medizin, angewandte Wissenschaften / Ingenieurwissenschaften / Angewandte Physik |
Freie Schlagwörter: | Diposal; Extended storage; Nuclear waste management; Safety; Storage cask |
Veranstaltung: | NDC2016 7th Annual Nuclear Decommissioning Conference |
Veranstaltungsort: | Manchester, UK |
Beginndatum der Veranstaltung: | 31.05.2016 |
Enddatum der Veranstaltung: | 01.06.2016 |
Verfügbarkeit des Dokuments: | Datei im Netzwerk der BAM verfügbar ("Closed Access") |
Datum der Freischaltung: | 06.06.2016 |
Referierte Publikation: | Nein |
Eingeladener Vortrag: | Nein |