Refine
Year of publication
Document Type
- In Proceedings (38)
- Article (31)
- ZIB-Report (21)
- Book chapter (5)
- Other (4)
- Book (2)
- Habilitation (1)
- Master's Thesis (1)
Language
- English (103)
Is part of the Bibliography
- no (103)
Keywords
Institute
This book promotes the use of mathematical optimization and operations research methods in rail transportation. The editors assembled thirteen contributions from leading scholars to present a unified voice, standardize terminology, and assess the state-of-the-art.
There are three main clusters of articles, corresponding to the classical stages of the planning process: strategic, tactical, and operational. These three clusters are further subdivided into five parts which correspond to the main phases of the railway network planning process: network assessment, capacity planning, timetabling, resource planning, and operational planning. Individual chapters cover:
Simulation
Capacity Assessment
Network Design
Train Routing
Robust Timetabling
Event Scheduling
Track Allocation
Blocking
Shunting
Rolling Stock
Crew Scheduling
Dispatching
Delay Propagation
We present a new strategy for the direct optimization of the values of policy functions. This approach is particularly well suited to model actors with a global perspective on the system and relies heavily on modern mathematical white-box optimization methods. We demonstrate our strategy on two classical models: market growth and World2. Each model is first transformed into an optimization problem by defining how the actor can influence the models' dynamics and by choosing objective functions to measure improvements. To improve comparability between different runs, we also introduce a comparison measure for possible interventions. We solve the optimization problems, discuss the resulting policies and compare them to the existing results from the literature. In particular, we present a run of the World2 model which significantly improves the published “towards a global equilibrium” run with equal cost of intervention.
We consider the following freight train routing problem (FTRP).
Given is a transportation network with fixed routes for passenger
trains and a set of freight trains (requests), each defined by an
origin and destination station pair. The objective is to
calculate a feasible route for each freight train such that the
sum of all expected delays and all running times is minimal.
Previous research concentrated on microscopic train routings for
junctions or inside major stations. Only recently approaches were
developed to tackle larger corridors or even networks. We
investigate the routing problem from a strategic perspective,
calculating the routes in a macroscopic transportation network of
Deutsche Bahn AG. In this context, macroscopic refers to an
aggregation of complex and large real-world structures into fewer
network elements. Moreover, the departure and arrival times of
freight trains are approximated. The problem has a strategic
character since it asks only for a coarse routing through the
network without the precise timings. We provide a mixed-integer
nonlinear programming (MINLP) formulation for the FTRP, which is
a multicommodity flow model on a time-expanded graph with
additional routing constraints. The model’s nonlinearities
originate from an algebraic approximation of the delays of the
trains on the arcs of the network by capacity restraint
functions. The MINLP is reduced to a mixed-integer linear
model (MILP) by piecewise linear approximation. The latter is
solved by a state-of-the art MILP solver for various real-world
test instances.
One quarter of Europe's energy demand is provided by natural gas distributed through a vast pipeline network covering the whole of Europe. At a cost of 1 million Euro per km extending the European pipeline network is already a multi-billion Euro business. Therefore, automatic planning tools that support the decision process are desired. Unfortunately, current mathematical methods are not capable of solving the arising network design problems due to their size and complexity. In this article, we will show how to apply optimization methods that can converge to a proven global optimal solution. By introducing a new class of valid inequalities that improve the relaxation of our mixed-integer nonlinear programming model, we are able to speed up the necessary computations substantially.
System Dynamic models describe physical, technical, economical, or social systems using differential and algebraic equations. In their purest form, these models are intended to describe the evolution of a system from a given initial state. In many applications, it is possible to intervene with the system in order to obtain a desired dynamic or a certain outcome in the end. On the mathematical side, this leads to control problems, where aside from the simulation one has to find optimal intervention functions over time that maximize a specific objective function. Using a dynamical model for the utilization of a natural nonrenewable resource of Behrens as a demonstrator example, we present two main mathematical solution strategies. They are distinguished by the quality certificate on their respective solution: one leads to proven local optimal solution, and the other technique yields proven global optimal solutions. We present implementational and numerical issues, and a comparison of both methods.
We propose an approach to solve the validation of nominations problem using mixed-integer nonlinear programming (MINLP) methods. Our approach handles both the discrete settings and the nonlinear aspects of gas physics. Our main contribution is an innovative coupling of mixed-integer (linear) programming (MILP) methods with nonlinear programming (NLP) that exploits the special structure of a suitable approximation of gas physics, resulting in a global optimization method for this type of problem.
We present a novel heuristic to identify feasible solutions of a mixed-integer nonlinear programming problem arising in natural gas transportation: the selection of new pipelines to enhance the network's capacity to a desired level in a cost-efficient way. We solve this problem in a linear programming based branch-and-cut approach, where we deal with the nonlinearities by linear outer approximation and spatial branching. At certain nodes of the branching tree, we compute a KKT point of a nonlinear relaxation. Based on the information from the KKT point we alter some of the binary variables in a locally promising way exploiting our problem-specific structure. On a test set of real-world instances, we are able to increase the chance of identifying feasible solutions by some order of magnitude compared to standard MINLP heuristics that are already built in the general-purpose MINLP solver SCIP.
We consider a nonlinear nonconvex network design problem that arises, for example, in natural gas or water transmission networks. Given is such a network with active and passive components, that is, valves, compressors, control valves (active) and pipelines (passive), and a desired amount of flow at certain specified entry and exit nodes in the network. The active elements are associated with costs when used. Besides flow conservation constraints in the nodes, the flow must fulfill nonlinear nonconvex pressure loss constraints on the arcs subject to potential values (i.e., pressure levels) in both end nodes of each arc. The problem is to compute a cost minimal setting of the active components and numerical values for the flow and node potentials. We examine different (convex) relaxations for a subproblem of the design problem and benefit from them within a branch-and-bound approach. We compare different approaches based on nonlinear optimization numerically on a set of test instances.
We consider problems concerning the scheduling of a set of trains on a single track. For every pair of trains there is a minimum headway, which every train must wait before it enters the track after another train. The speed of each train is also given. Hence for every schedule - a sequence of trains - we may compute the time that is at least needed for all trains to travel along the track in the given order. We give the solution to three problems: the fastest schedule, the average schedule, and the problem of quantile schedules. The last problem is a question about the smallest upper bound on the time of a given fraction of all possible schedules. We show how these problems are related to the travelling salesman problem. We prove NP-completeness of the fastest schedule problem, NP-hardness of quantile of schedules problem, and polynomiality of the average schedule problem. We also describe some algorithms for all three problems. In the solution of the quantile problem we give an algorithm, based on a reverse search method, generating with polynomial delay all Eulerian multigraphs with the given degree sequence and a bound on the number of such multigraphs. A better bound is left as an open question.