In this article we investigate methods to solve a fundamental task in gas transportation, namely the validation of nomination problem: Given a gas transmission network consisting of passive pipelines and active, controllable elements and given an amount of gas at every entry and exit point of the network, find operational settings for all active elements such that there exists a network state meeting all physical, technical, and legal constraints.
We describe a two-stage approach to solve the resulting complex and numerically difficult feasibility problem. The first phase consists of four distinct algorithms applying linear, and methods for complementarity constraints to compute possible settings for the discrete decisions. The second phase employs a precise continuous programming model of the gas network. Using this setup, we are able to compute high quality solutions to real-world industrial instances that are significantly larger than networks that have appeared in the mathematical programming literature before.
The recently imposed new gas market liberalization rules in Germany lead to a change of business of gas network operators. While previously network operator and gas vendor were united, they were forced to split up into independent companies. The network has to be open to any other gas trader at the same conditions, and free network capacities have to be identified and publicly offered in a non-discriminatory way. We discuss how these changing paradigms lead to new and challenging mathematical optimization problems. This includes the validation of nominations, that asks for the decision if the network’s capacity is sufficient to transport a specific amount of flow, the verification of booked capacities and the detection of available freely allocable capacities, and the topological extension of the network with new pipelines or compressors in order to increase its capacity. In order to solve each of these problems and to provide meaningful results for the practice, a mixture of different mathematical aspects have to be addressed, such as combinatorics, stochasticity, uncertainty, and nonlinearity. Currently, no numerical solver is available that can deal with such blended problems out-of-the-box. The main goal of our research is to develop such a solver, that moreover is able to solve instances of realistic size. In this article, we describe the main ingredients of our prototypical software implementations.
We consider the following freight train routing problem (FTRP).
Given is a transportation network with fixed routes for passenger
trains and a set of freight trains (requests), each defined by an
origin and destination station pair. The objective is to
calculate a feasible route for each freight train such that the
sum of all expected delays and all running times is minimal.
Previous research concentrated on microscopic train routings for
junctions or inside major stations. Only recently approaches were
developed to tackle larger corridors or even networks. We
investigate the routing problem from a strategic perspective,
calculating the routes in a macroscopic transportation network of
Deutsche Bahn AG. In this context, macroscopic refers to an
aggregation of complex and large real-world structures into fewer
network elements. Moreover, the departure and arrival times of
freight trains are approximated. The problem has a strategic
character since it asks only for a coarse routing through the
network without the precise timings. We provide a mixed-integer
nonlinear programming (MINLP) formulation for the FTRP, which is
a multicommodity flow model on a time-expanded graph with
additional routing constraints. The model’s nonlinearities
originate from an algebraic approximation of the delays of the
trains on the arcs of the network by capacity restraint
functions. The MINLP is reduced to a mixed-integer linear
model (MILP) by piecewise linear approximation. The latter is
solved by a state-of-the art MILP solver for various real-world
test instances.
The Scenario Technique is a strategic planning method that aims to describe and analyze potential developments of a considered system in the future. Its application consists of several steps, from an initial problem analysis over an influence analysis to projections of key factors and a definition of the scenarios to a final interpretation of the results. The technique itself combines qualitative and quantitative methods and is an enhancement of the standard Scenario Technique. We use the numerical values gathered during the influence analysis, and embed them in a System Dynamics framework. This yields a mathematically rigorous way to achieve predictions of the system‘s future behavior from an initial impulse and the feedback structure of the factors. The outcome of our new method is a further way of projecting the present into the future, which enables the user of the Scenario Technique to obtain a validation of the results achieved by the standard method.
Identification of trade-offs for sustainable manufacturing of a Bamboo Bike by System Dynamics
(2013)
We develop a generic System Dynamic model to simulate the production, machines, employees, waste, and capital flows of a manufacturing company. In a second step, this model is specialised by defining suit-able input data to represent a bicycle manufacturing company in a developing country. We monitor a set of sustainability indicators to understand the social, environmental and economic impact of the company, and to estimate managerial decisions to be taken in order to improve on these criteria. We show that the social and environmental situation can be improved over time without sacrificing the economic success of the company's business.
We consider a production planning problem where two competing companies are selling their items on a common market. Moreover, the raw material used in the production is a limited non-renewable resource. The revenue per item sold depends on the total amount of items produced by both players. If they collaborate they could apply a production strategy that leads to the highest combined revenue. Usually the formation of such syndicates is prohibited by law; hence we assume that one company does not know how much the other company will produce. We formulate the problem for company A to find an optimal production plan without information on the strategy of company B as a nonlinear mathematical optimization problem. In its naive formulation the model is too large, making its solution practically impossible. After a reformulation we find a much smaller model, which we solve by spatial branch-and-cut methods and linear programming. We discuss the practical implications of our solutions.
The System Dynamics (SD) methodology is a framework for modeling and simulating the dynamic behavior of socioeconomic systems. Characteristic for the description of such systems is the occurrence of feedback loops together with stocks and flows. The mathematical equations that describe the system are usually nonlinear. Therefore seemingly simple systems can show a nonintuitive, nonpredictable behavior over time. Controlling a dynamical system means to define a desired final state in which the system should be, and to specify potential interventions from outside that should keep the system on the right track. The central question is how to compute such globally optimal control for a given SD model. We propose a branch-and-bound approach that is based on a bound propagation method, primal heuristics, and spatial branching. We apply our new SD-control method to a small System Dynamics model, that describes the evolution of a social-economic system over time. We examine the problem of steering this system on a sustainable consumption path.
Gas distribution networks are complex structures that consist of passive pipes, and active, controllable elements such as valves and compressors. Controlling such network means to find a suitable setting for all active components such that a nominated amount of gas can be transmitted from entries to exits through the network, without violating physical or operational constraints. The control of a large-scale gas network is a challenging task from a practical point of view. In most companies the actual controlling process is supported by means of computer software that is able to simulate the flow of the gas. However, the active settings have to be set manually within such simulation software. The solution quality thus depends on the experience of a human planner. When the gas network is insufficient for the transport then topology extensions come into play. Here a set of new pipes or active elements is determined such that the extended network admits a feasible control again. The question again is how to select these extensions and where to place them such that the total extension costs are minimal. Industrial practice is again to use the same simulation software, determine extensions by experience, add them to the virtual network, and then try to find a feasible control of the active elements. The validity of this approach now depends even more on the human planner. Another weakness of this manual simulation-based approach is that it cannot establish infeasibility of a certain gas nomination, unless all settings of the active elements are tried. Moreover, it is impossible to find a cost-optimal network extension in this way. In order to overcome these shortcomings of the manual planning approach we present a new approach, rigorously based on mathematical optimization. Hereto we describe a model for finding feasible controls and then extend this model such that topology extensions can additionally and simultaneously be covered. Numerical results for real-world instances are presented and discussed.