90C90 Applications of mathematical programming
Refine
Keywords
- network design (3)
- integer programming (2)
- Container terminal (1)
- Gemischt-ganzzahlige Optimierung (1)
- Integer Programming (1)
- Integer programming (1)
- Laserschweißen (1)
- MIP (1)
- MIPLIB (1)
- Mixed Integer Programming (1)
We consider the design of a passive optical telecommunication access network, where clients have to be connected to an intermediate level of distribution points (DPs) and further on to some central offices (COs) in a tree-like fashion. Each client demands a given number of fiber connections to its CO. Passive optical splitters installed at the DPs allow k connections to share a single common fiber between the DP and the CO. We consider fixed charge costs for the use of an edge of the underlying street network, of a DP, and of a CO and variable costs for installing fibers along the street edges and for installing splitters at the DPs. We present two Lagrangian decomposition approaches that decompose the problem based on the network structure and on the cost structure, respectively. The subproblems are solved using MIP techniques. We report computational results for realistic instances and compare the efficiency of the Lagrangian approaches to the solutions of an integrated MIP model.
We consider a generalized version of the rooted connected facility location problem which occurs in planning of telecommunication networks with both survivability and hop-length constraints. Given a set of client nodes, a set of potential facility nodes including one predetermined root facility, a set of optional Steiner nodes, and the set of the potential connections among these nodes, that task is to decide which facilities to open, how to assign the clients to the open facilities, and how to interconnect the open facilities in such a way, that the resulting network contains at least edge-disjoint paths, each containing at most H edges, between the root and each open facility and that the total cost for opening facilities and installing connections is minimal. We study two IP models for this problem and present a branch-and-cut algorithm based on Benders decomposition for nding its solution. Finally, we report computational results.
MIPLIB 2010
(2012)
This paper reports on the fifth version of the Mixed Integer Programming Library. The MIPLIB 2010 is the first MIPLIB release that has been assembled by a large group from academia and from industry, all of whom work in integer programming. There was mutual consent that the concept of the library had to be expanded in order to fulfill the needs of the community. The new version comprises 361 instances sorted into several groups. This includes the main benchmark test set of 87 instances, which are all solvable by today's codes, and also the challenge test set with 164 instances, many of which are currently unsolved. For the first time, we include scripts to run automated tests in a predefined way. Further, there is a solution checker to test the accuracy of provided solutions using exact arithmetic.
Affinely-Adjustable Robust Counterparts provide tractable alternatives to (two-stage) robust programs with arbitrary recourse. We apply them to robust network design with polyhedral demand uncertainty, introducing the affine routing principle. We compare the affine routing to the well-studied static and dynamic routing schemes for robust network design. All three schemes are embedded into the general framework of two-stage network design with recourse. It is shown that affine routing can be seen as a generalization of the widely used static routing still being tractable and providing cheaper solutions. We investigate properties on the demand polytope under which affine routings reduce to static routings and also develop conditions on the uncertainty set leading to dynamic routings being affine. We show however that affine routings suffer from the drawback that (even totally) dominated demand vectors are not necessarily supported by affine solutions. Uncertainty sets have to be designed accordingly. Finally, we present computational results on networks from SNDlib. We conclude that for these instances the optimal solutions based on affine routings tend to be as cheap as optimal network designs for dynamic routings. In this respect the affine routing principle can be used to approximate the cost for two-stage solutions with free recourse which are hard to compute.
We estimate potential energy savings in IP-over-WDM networks achieved by switching off router line cards in low-demand hours. We compare three approaches to react on dynamics in the IP traffic over time, FUFL,
DUFL and DUDL. They provide different levels of freedom in adjusting the routing of lightpaths in the WDM layer and the routing of demands in the IP layer. Using MILP models based on realistic network topologies and node architectures as well as realistic demands, power, and cost values, we show that already a simple monitoring of the lightpath utilization in order to deactivate empty line cards (FUFL) brings substantial
benefits. The most significant savings, however, are achieved by rerouting traffic in the IP layer (DUFL), which allows emptying and deactivating lightpaths together with the corresponding line cards. A
sophisticated reoptimization of the virtual topologies and the routing in the optical domain for every demand scenario (DUDL) yields nearly no additional profits in the considered networks.
In this paper we investigate the performance of several out-of-the box solvers for mixed-integer quadratically constrained programmes (MIQCPs) on an open pit mine production scheduling problem with mixing constraints. We compare the solvers BARON, Couenne, SBB, and SCIP to a problem-specific algorithm on two different MIQCP formulations. The computational results presented show that general-purpose solvers with no particular knowledge of problem structure are able to nearly match the performance of a hand-crafted algorithm.
Most data networks nowadays use shortest path protocols to route the traffic. Given administrative routing lengths for the links of the network, all data packets are sent along shortest paths with respect to these lengths from their source to their destination.
In this paper, we present an integer programming algorithm for the minimum congestion unsplittable shortest path routing problem, which arises in the operational planning of such networks. Given a capacitated directed graph and a set of communication demands, the goal is to find routing lengths that define a unique shortest path for each demand and minimize the maximum congestion over all links in the resulting routing. We illustrate the general decomposition approach our algorithm is based on, present the integer and linear programming models used to solve the master and the client problem, and discuss the most important implementational aspects. Finally, we report computational results for various benchmark problems, which demonstrate the efficiency of our algorithm.
Ein gemischt-ganzzahliges lineares Optimierungsmodell für ein Laserschweißproblem im Karosseriebau
(2006)
Wir betrachten das Problem der Betriebsplanung von Laserschweißrobotern im Karosseriebau. Gegeben ist eine Menge von Schweißnähten, die innerhalb einer Fertigungszelle an einem Karosserieteil gefertigt werden müssen. Die Schweißnähte werden durch mehrere parallel betriebene Roboter bearbeitet. Die Aufgabe besteht darin, für jeden Roboter eine Reihenfolge und eine zeitliche Koordinierung seiner Bewegungen zu finden, so dass alle Schweißnähte innerhalb der Taktzeit der Fertigungszelle bearbeitet werden und so wenig Laserquellen wie möglich eingesetzt werden. Dabei müssen einige Nebenbedingungen berücksichtigt werden. Für dieses spezielle Schweißproblem haben wir eine Formulierung als gemischt-ganzzahliges lineares Programm entwickelt, welches sich für die untersuchten praktischen Fälle sehr schnell lösen lässt.
This paper concerns the problem of operating a landside container exchange area that is serviced by multiple semi-automated rail mounted gantry cranes (RMGs) that are moving on a single bi-directional traveling lane. Such a facility is being built by Patrick Corporation at the Port Botany terminal in Sydney. The gantry cranes are a scarce resource and handle the bulk of container
movements. Thus, they require a sophisticated analysis to achieve near optimal utilization. We present a three stage algorithm to manage the container exchange facility, including the scheduling of cranes, the control of associated short-term container stacking, and
the allocation of delivery locations for trucks and other container transporters. The key components of our approach are a time scale decomposition, whereby an integer program controls decisions across a long time horizon to produce a balanced plan that is fed to a series of short time scale online subproblems, and a highly efficient space-time divisioning of short term storage areas.
A computational evaluation shows that our heuristic can find effective solutions for the planning problem; on real-world data it yields a solution at most 8% above a lower bound on optimal RMG utilization.