Filtern
Dokumenttyp
Sprache
- Englisch (9) (entfernen)
Referierte Publikation
- nein (9) (entfernen)
Schlagworte
- Integrated monitoring system (3)
- Offshore wind turbines (3)
- Data management (2)
- Limit values (2)
- Rotor blades (2)
- Structural assessment (2)
- Assessment (1)
- Damage Identification (1)
- Damage detection (1)
- Damage identification (1)
Inspections are an efficient means of enhancing the reliability of redundant structural Systems subjected to fatigue. To investigate the effect of such inspections, we represent the deterioration state of a Daniels System by means of a probabilistic fatigue crack growth model of all elements, which considers stochastic dependence among element fatigue behavior. We include inspection results in the calculation of the System collapse probability through Bayesian updating of the System deterioration state. Based on this approach, we calculate the collapse probability of a deteriorating Daniels System conditional on different inspection strategies in terms of inspection coverage and inspection times. The acceptability of an inspection strategy is verified by comparing the calculated collapse probabilities with maximum acceptable System failure probabilities. This study is a Step towards identifying optimal inspection strategies for redundant structural Systems subjected to fatigue.
Prototypes of wind turbines of the megawatt dass are to be built and tested until 2008 within a German offshore wind energy test field in the North Sea (ALPHA VENTUS). To ensure a high operational reliability of offshore wind turbines with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring Systems will be an essential part of such concepts. Because of the fact, that during Operation there will be static and dynamic interaction between the components ‘structure’, ‘machinery’ and ‘blades’ it is necessary to develop the monitoring techniques in an overall concept. These monitoring Systems are supposed to be applied for the design and testing as well as for the Operation and maintenance phases. In the paper the developed approaches for the measurement of actions and the condition monitoring of all components of an offshore wind energy plant will be shown.
To ensure a high operational reliability of future generations of offshore wind conversion systems (OWEC) with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring systems will be an essential part of such concepts. Because of the fact, that during operation there will be static and dynamic interaction between the components 'structure', 'machinery' and 'blades' it is necessary to develop the monitoring techniques in an overall concept. These monitoring systems are supposed to be applied for the design and testing as well as for the operation and maintenance phases. The used methods are focused on the design requirements for the structure, which are stated in the respective standards and certification guidelines. For the validation of the design, methods are specified which would be also applicable for SHM in the operating condition, e.g. for the evaluation of the structural conditon possibly after the occurrence of damages or changes. The further task consists in the realization of condition monitoring for all components, aiming at early damage detection and the observation of the damage development and its evaluation. Here the task consists of determining with assessment procedures the optimum time for maintenance actions to be carried out.
The concept and technical details of the implementation of the developed integrated monitoring system within the IMO-WIND project are presented. The tasks of the components of the system and its requirements are described. Selected results from the continuous monitoring during operation of the plant M5000_2 regarding the task design verification and dynamic structural analysis are given.
This paper describes a structural reliability analysis utilizing monitoring data in the ultimate limit state with consideration of the uncertainties of the monitoring procedure. For this purpose the uncertainties of the monitoring data are modeled utilizing a new framework for the determination of measurement uncertainties. The approach is based on a process equation and Statistical models of observations for the derivation of a posterior measurement uncertainty by Bayesian updating. This facilitates the quantification of a measurement uncertainty using all available data of the measurement process. For the reliability analysis in the ultimate limit state, monitoring data can be utilized as a loading model Information and as proof loading, i.e. resistance model Information. Both approaches are discussed with generic examples and it is shown that the modeling of monitoring data in a reliability analysis can result in a reduction of uncertainties and as a consequence in the reduction of the probability of failure. Furthermore, the proof loading concept is developed further to account for the uncertain characteristic of proof loading due to the measurement uncertainties which is consistent with the framework for the determination of measurement uncertainties. These approaches and findings can be utilized for the assessment of structures for life cycle extension and the design of monitoring Systems.
To ensure a high operational reliability of offshore wind turbines (OWEC) with economically acceptable repair and maintenance efforts, comprehensive diagnosis and supervision concepts are required. Automatic monitoring Systems will be an essential part of such concepts. Because of the fact, that during Operation there will be static and dynamic interaction between the components ‘structure’, ‘machinery’ and ‘blades’ it is necessary to develop the monitoring techniques in an overall concept. These monitoring Systems are supposed to be applied for the design and testing as well as for the Operation and maintenance phases. The knowledge of the dynamic behavior of wind turbines is important both for the design and for a safe Operation. The available monitoring data from a period of three years, allow first conclusions on the long-term Operation of such Systems in terms of quality requirements to the instrumentation to the structure and the rotor blades