Filtern
Erscheinungsjahr
- 2019 (2)
Dokumenttyp
Sprache
- Englisch (2)
Referierte Publikation
- nein (2) (entfernen)
Schlagworte
- Facade (2) (entfernen)
Organisationseinheit der BAM
Several attempts have been made in the past to develop a European harmonized testing and assessment method for façades before the European commission decided to publish a call for tender on the topic. A project consortium from five countries (Sweden, UK, France, Germany and Hungary) applied to the call for tender and was contracted to develop a European approach to assess the fire performance of façades. 24 sub-contractors and 14 stakeholder entities were part of the project.
The objective of the European project was to address a request from the Standing Committee of Construction (SCC) to provide EC Member States regulators with a means to regulate the fire performance of façade systems based on a European approach agreed by SCC. In addressing this objective, the project team was asked to consider a number of issues which are presented and discussed.
Recent facade fires worldwide have driven change in regulations for façade fire safety in different parts of the world. The Grenfell Tower fire 2017 in London triggered a thorough investigation of many aspects of the fire. One investigation was about the UK building regulations from Dame Judith Hackett 1,2. This investigation compares the UK with the situation other parts of the world.