68-XX COMPUTER SCIENCE (For papers involving machine computations and programs in a specific mathematical area, see Section -04 in that area)
Filtern
Dokumenttyp
- ZIB-Report (19) (entfernen)
Sprache
- Englisch (19)
Volltext vorhanden
- ja (19)
Gehört zur Bibliographie
- nein (19) (entfernen)
Schlagworte
Institut
- Mathematical Optimization (19) (entfernen)
Mixed integer linear programming (MIP) is a general form to model combinatorial optimization problems and has many industrial applications. The performance of MIP solvers has improved tremendously in the last two decades and these solvers have been used to solve many real-word problems. However, against the backdrop of modern computer technology, parallelization is of pivotal importance. In this way, ParaSCIP is the most successful parallel MIP solver in terms of solving previously unsolvable instances from the well-known benchmark instance set MIPLIB by using supercomputers. It solved two instances from MIPLIB2003 and 12 from MIPLIB2010 for the first time to optimality by using up to 80,000 cores on supercomputers. ParaSCIP has been developed by using the Ubiquity Generator (UG) framework, which is a general software package to parallelize any state-of-the-art branch-and-bound based solver. This paper discusses 7 years of progress in parallelizing branch-and-bound solvers with UG.
This paper proposes a new method for probabilistic analysis of online algorithms. It is based on the notion of stochastic dominance. We develop the method for
the online bin coloring problem introduced by Krumke et al (2008). Using methods for the stochastic
comparison of Markov chains we establish the result that the performance of the online algorithm GreedyFit is stochastically better than the performance of the algorithm OneBin for any number of items processed. This result gives a more realistic
picture than competitive analysis and explains the behavior observed in simulations.
This paper describes how we solved 12 previously unsolved mixed-integer program-
ming (MIP) instances from the MIPLIB benchmark sets. To achieve these results we
used an enhanced version of ParaSCIP, setting a new record for the largest scale MIP
computation: up to 80,000 cores in parallel on the Titan supercomputer. In this paper
we describe the basic parallelization mechanism of ParaSCIP, improvements of the
dynamic load balancing and novel techniques to exploit the power of parallelization
for MIP solving. We give a detailed overview of computing times and statistics for
solving open MIPLIB instances.
The rapid technological evolution of telecommunication networks demands service providers to regularly update their technology, with the aim of remaining competitive in the marketplace. However, upgrading the technology in a network is not a trivial task. New hardware components need to be installed in the network and during the installation network connectivity may be temporarily compromised. The Wavelength Division Multiplexing (WDM) technology, whose upgrade is considered in here, shares fiber links among several optical connections and tearing down a single link may disrupt several optical connections at once. When the upgrades involve large parts of a network, typically not all links can be upgraded in parallel, which may lead to an unavoidable longer disruption of some connections. A bad scheduling of the overall endeavor, however, can dramatically increase the disconnection time of parts of the networks, causing extended service disruption. In this contribution, we study the problem of finding a schedule of the fiber link upgrades that minimizes the total service disruption time. To the best of our knowledge, this problem has not yet been formalized and investigated. The aim of our work is to close this gap by presenting a mathematical optimization model for the problem and an innovative solution algorithm that tackles the intrinsic difficulties of the problem. Computational experience on realistic instances completes our study. Our original investigations have been driven by real needs of DFN, operator of the German National Research and Education Network and our partner in the BMBF research project ROBUKOM (http://www.robukom.de/).
In the last 20 years competitive analysis has become the main tool for
analyzing the quality of online algorithms. Despite of this,
competitive analysis has also been criticized: It sometimes cannot
discriminate between algorithms that exhibit significantly different
empirical behavior, or it even favors an algorithm that is worse from
an empirical point of view. Therefore, there have been several
approaches to circumvent these drawbacks. In this survey, we discuss
probabilistic alternatives for competitive analysis.
It is shown how piecewise differentiable functions \(F: R^n → R^m\) that are defined by evaluation programs can be approximated locally by a piecewise linear model based on a pair of sample points x̌ and x̂. We show that the discrepancy between function and model at any point x is of the bilinear order O(||x − x̌|| ||x − x̂||). This is a little surprising since x ∈ R^n may vary over the whole Euclidean space, and we utilize only two function samples F̌ = F(x̌) and F̂ = F(x̂), as well as the intermediates computed during their evaluation. As an application of the piecewise linearization procedure we devise a generalized Newton’s method based on successive piecewise linearization and prove for it sufficient conditions for convergence and convergence rates equaling those of semismooth Newton. We conclude with the derivation of formulas for the numerically stable implementation of the aforedeveloped piecewise linearization methods.
Public transportation networks are typically operated with a periodic timetable. The Periodic Event Scheduling Problem (PESP) is the standard mathematical modelling tool for periodic timetabling. Since PESP can be solved in linear time on trees, it is a natural question to ask whether there are polynomial-time algorithms for input networks of bounded treewidth. We show that deciding the feasibility of a PESP instance is NP-hard even when the treewidth is 2, the branchwidth is 2, or the carvingwidth is 3. Analogous results hold for the optimization of reduced PESP instances, where the feasibility problem is trivial. To complete the picture, we present two pseudo-polynomial-time dynamic programming algorithms solving PESP on input networks with bounded tree- or branchwidth. We further analyze the parameterized complexity of PESP with bounded cyclomatic number, diameter, or vertex cover number. For event-activity networks with a special -- but standard -- structure, we give explicit and sharp bounds on the branchwidth in terms of the maximum degree and the carvingwidth of an underlying line network. Finally, we investigate several parameters on the smallest instance of the benchmarking library PESPlib.
PIPS-SBB is a distributed-memory parallel solver with a scalable data distribution paradigm. It is designed to solve MIPs with a dual-block angular structure, which is characteristic of deterministic-equivalent Stochastic Mixed-Integer Programs (SMIPs). In this paper, we present two different parallelizations of Branch & Bound (B&B), implementing both as extensions of PIPS-SBB, thus adding an additional layer of parallelism. In the first of the proposed frameworks, PIPS-PSBB, the coordination and load-balancing of the different optimization workers is done in a decentralized fashion. This new framework is designed to ensure all available cores are processing the most promising parts of the B&B tree. The second, ug[PIPS-SBB,MPI], is a parallel implementation using the Ubiquity Generator (UG), a universal framework for parallelizing B&B tree search that has been successfully applied to other MIP solvers. We show the effects of leveraging multiple levels of parallelism in potentially improving scaling performance beyond thousands of cores.
The planning of a communication network is inevitably depending on the quality of both the planning tool and the demand forecast used. In this article, we show exemplarily how the emerging area of Robust Optimization can advance the network planning by a more accurate mathematical description of the demand uncertainty. After a general introduction of the concept and its application to a basic network design problem, we present two applications: multi-layer and mixed-line-rate network design. We conclude with a discussion of extensions of the robustness concept to increase the accuracy of handling uncertainties.
A central assumption in classical optimization is that all the input data of a
problem are exact. However, in many real-world problems, the input data are subject
to uncertainty. In such situations, neglecting uncertainty may lead to nominally optimal
solutions that are actually suboptimal or even infeasible. Robust optimization
offers a remedy for optimization under uncertainty by considering only the subset of
solutions protected against the data deviations. In this paper, we provide an overview
of the main theoretical results of multiband robustness, a new robust optimization
model that extends and refines the classical theory introduced by Bertsimas and Sim.
After introducing some new results for the special case of pure binary programs, we
focus on the harvest scheduling problem and show how multiband robustness can
be adopted to tackle the uncertainty affecting the volume of produced timber and
grant a reduction in the price of robustness.