Refine
Document Type
- Article (2)
Language
- English (2)
Has Fulltext
- no (2)
Is part of the Bibliography
- no (2) (remove)
Keywords
- existing structures (2) (remove)
Institute
Begutachtungsstatus
- peer-reviewed (1)
Specifying the target reliability levels is one of the key issues in the assessment of existing structures. For a majority of existing buildings and infrastructures, the design life has been reached or will be reached in the near future. These structures need to be reassessed in order to verify their safety. Eurocodes provide a general basis primarily intended for the design of new structures, but the basic principles can be used for assessing existing buildings, too. Reliability levels are generally based on both economic optimization and criteria for human safety. In this study, both methods are elaborated for existing structures. It appears that the requirement for the same target reliability for existing and new structures is uneconomical. Further, cost optimization seems to yield rather low reliability levels and human safety criteria often become the critical factor. The study concludes with practical guidelines for establishing reliability indices for existing structures linked to Eurocode principles.
Specification of target reliability levels is one of the key issues of the assessment of existing structures. ISO 13822:2010 and ISO 2394:2015 indicate procedures for specification of target reliability levels by optimisation of the total cost related to an assumed remaining working life of a structure. These approaches are critically compared with human safety criteria, with target levels based on a marginal life-saving costs principle, and with recommendations of present standards. Optimal target reliability levels are then derived in the representative case study for an existing structural member. It appears that the requirement to reach the same target reliability levels for existing and new structures is uneconomical. Decisions made in the assessment can result in the acceptance of the actual state or in the upgrade of an existing structure. Two reliability levels are thus needed - the minimum level below which the structure is unreliable and should be upgraded, and the target level indicating an optimum upgrade strategy. It is recommended that these levels be established using economic optimisation and the marginal life-saving costs principle, as both the approaches take into account the costs of safety measures and the failure consequences.