ZIB-Report
Refine
Year of publication
Document Type
- ZIB-Report (425)
- Habilitation (4)
Keywords
- mixed integer programming (25)
- integer programming (21)
- constraint integer programming (13)
- branch-and-bound (11)
- mixed-integer programming (11)
- Mixed Integer Programming (9)
- Optimierung (9)
- MINLP (8)
- combinatorial optimization (8)
- line planning (8)
Institute
- Mathematical Optimization (429) (remove)
SC-95-15
{\begin{footnotesize} This thesis is concerned with structural properties and the stability behaviour of two-stage stochastic programs. Chapter~1 gives an introduction into stochastic programming and a summary of the main results of the thesis. In Chapter~2 we present easily verifiable sufficient conditions for the strong convexity of the expected-recourse function in a stochastic program with linear complete recourse. Different levels of randomness in the data are considered. We start with models where only the right-hand side of the constraints is random and extend these results to the situation where also the technology matrix contains random entries. The statements on strong convexity imply new stability estimates for sets of optimal solutions when perturbing the underlying probability measure. We work out Hölder estimates (in terms of the $\mbox{L}_1$-Wasserstein distance) for optimal solution sets to linear recourse models with random technology matrix. In Chapter~3 ({\it joint work with Werner Römisch, Berlin}) we are aiming at the Lipschitz stability of optimal solution sets to linear recourse models with random right-hand side. To this end , we first adapt the distance notion for the underlying probability measures to the structure of the model and derive a Lipschitz estimate for optimal solutions based on that distance. Here, the strong convexity established in Chapter~2 turns out as an essential assumption. For applications, however, a Lipschitz estimate with respect to a more accesssible probability distance is desirable. Structural properties of the expected-recourse function finally permit such an estimate in terms of the Kolmogorov-Smirnov distance of linear transforms of the underlying measures. The general analysis is specified to estimation via empirical measures. We obtain a law of iterated logarithm, a large deviation estimate and an estimate for the asymptotic distribution of optimal solution sets. Chapters~4 and~5 deal with two-stage linear stochastic programs where integrality constraints occur in the second stage. In Chapter~4 we study basic continuity properties of the expected-recourse function for models with random right-hand side and random technology matrix. The joint continuity with respect to the decision variable and the underlying probability measure leads to qualitative statements on the stability of local optimal values and local optimal solutions. In Chapter~5 we demonstrate that a variational distance of probability measures based on a suitable Vapnik-\v{C}ervonenkis class of Borel sets leads to convergence rates of the Hölder type for the expected recourse as a function of the underlying probability measure. The rates carry over to the convergence of local optimal values. As an application we again consider estimation via empirical measures. Beside qualitative asymptotic results for optimal values and optimal solutions we obtain a law of iterated logarithm for optimal values. \end{footnotesize}}
TR-93-03
"`Telebus"' ist der soziale Behindertenfahrdienst im Land Berlin. Das Telebus-Forschungsprojekt des Konrad-Zuse-Zentrums für Informationstechnik (ZIB) hat das Ziel, den Fahrdienst (insbesondere die Disposition der Telebusse) zu verbessern, d.h. kundenfreundlicher zu gestalten und gleichzeitig billiger zu machen. In diesem Bericht werden die bisherigen Ergebnisse dargestellt und weitere Möglichkeiten zur Verbesserung des Service und zur Reduzierung der Kosten skizziert. \originalTeX
16-39
In this paper, we present a new, optimization-based method to exhibit cyclic behavior in non-reversible stochastic processes. While our method is general, it is strongly motivated by discrete simulations of ordinary differential equations representing non-reversible biological processes, in particular molecular simulations. Here, the discrete time steps of the simulation are often very small compared to the time scale of interest, i.e., of the whole process. In this setting, the detection of a global cyclic behavior of the process becomes difficult because transitions between individual states may appear almost reversible on the small time scale of the simulation. We address this difficulty using a mixed-integer programming model that allows us to compute a cycle of clusters with maximum net flow, i.e., large forward and small backward probability. For a synthetic genetic regulatory network consisting of a ring-oscillator with three genes, we show that this approach can detect the most productive overall cycle, outperforming classical spectral analysis methods. Our method applies to general non-equilibrium steady state systems such as catalytic reactions, for which the objective value computes the effectiveness of the catalyst.
13-61
We provide an overview of our main results about studying Linear Programming Problems whose coefficient matrix is subject to uncertainty and the uncertainty is modeled through a multi-band set. Such an uncertainty set generalizes the classical one proposed by Bertsimas and Sim and is particularly suitable in the common case of arbitrary non-symmetric distributions of the parameters. Our investigations were inspired by practical needs of our industrial partner in ongoing projects with focus on the design of robust telecommunications networks.
13-62
The rapid technological evolution of telecommunication networks demands service providers to regularly update their technology, with the aim of remaining competitive in the marketplace. However, upgrading the technology in a network is not a trivial task. New hardware components need to be installed in the network and during the installation network connectivity may be temporarily compromised. The Wavelength Division Multiplexing (WDM) technology, whose upgrade is considered in here, shares fiber links among several optical connections and tearing down a single link may disrupt several optical connections at once. When the upgrades involve large parts of a network, typically not all links can be upgraded in parallel, which may lead to an unavoidable longer disruption of some connections. A bad scheduling of the overall endeavor, however, can dramatically increase the disconnection time of parts of the networks, causing extended service disruption. In this contribution, we study the problem of finding a schedule of the fiber link upgrades that minimizes the total service disruption time. To the best of our knowledge, this problem has not yet been formalized and investigated. The aim of our work is to close this gap by presenting a mathematical optimization model for the problem and an innovative solution algorithm that tackles the intrinsic difficulties of the problem. Computational experience on realistic instances completes our study. Our original investigations have been driven by real needs of DFN, operator of the German National Research and Education Network and our partner in the BMBF research project ROBUKOM (http://www.robukom.de/).
13-63
We propose a novel optimization model for resource assignment in heterogeneous wireless network. The model adopts two objective functions maximizing the number of served users and the minimum granted utility at once. A distinctive feature of our new model is to consider two consecutive time slots, in order to include handover as an additional decision dimension.
Furthermore, the solution algorithm that we propose refines a heuristic solution approach recently proposed in literature, by considering a real joint optimization of the considered resources. The simulation study shows that the new model leads to a significant reduction in handover frequency, when compared to a traditional scheme based on maximum SNR.
13-65
A common technique in the solution of large or complex optimization problems is the use of micro-macro transformations. In this paper, we carry out a theoretical analysis of such transformations for the track allocation problem in railway networks. We prove that the cumulative rounding technique of Schlechte et al. satisfies two of three natural optimality criteria and that this performance cannot be improved. We also show that under extreme circumstances, this technique can perform inconvieniently by underestimating the global optimal value.
13-57
Steiner trees are constructed to connect a set of terminal nodes in a graph. This basic version of the Steiner tree problem is idealized, but it can effectively guide the search for successful approaches to many relevant variants, from both a theoretical and a computational point of view. This article illustrates the theoretical and algorithmic progress on Steiner tree type problems on two examples, the Steiner connectivity and the Steiner tree packing problem.
13-59
The planning of a communication network is inevitably depending on the quality of both the planning tool and the demand forecast used. In this article, we show exemplarily how the emerging area of Robust Optimization can advance the network planning by a more accurate mathematical description of the demand uncertainty. After a general introduction of the concept and its application to a basic network design problem, we present two applications: multi-layer and mixed-line-rate network design. We conclude with a discussion of extensions of the robustness concept to increase the accuracy of handling uncertainties.
13-60
The Rolling Stock Rotation Problem is to schedule rail vehicles in order to cover timetabled trips by a cost optimal set of vehicle rotations. The problem integrates several facets of railway optimization, i.e., vehicle composition, maintenance constraints, and regularity aspects.
In industrial applications existing schedules often have to be re-optimized to integrate timetable changes or construction sites.
We present an integrated modeling and algorithmic approach for this task as well as computational results for industrial problem instances of DB Fernverkehr AG.