90C27 Combinatorial optimization
Refine
Year of publication
- 2010 (3) (remove)
Document Type
- ZIB-Report (3)
Has Fulltext
- yes (3)
Is part of the Bibliography
- no (3)
Keywords
- Bundle Method (1)
- Fallstudie (1)
- Ganzzahlige Programmierung (1)
- Linienplanung (1)
- Netzwerkaggregation (1)
- Optimierung (1)
- Optimization (1)
- Proximale Bündelmethode (1)
- Railway Track Allocation (1)
- Rapid Branching (1)
Institute
The track allocation problem, also known as train routing problem or train timetabling problem, is to find a conflict-free set of train routes of maximum value in a railway network. Although it can be modeled as a standard path packing problem, instances of sizes relevant for real-world railway applications could not be solved up to now. We propose a rapid branching column generation approach that integrates the solution of the LP relaxation of a path coupling formulation of the problem with a special rounding heuristic. The approach is based on and exploits special properties of the bundle method for the approximate solution of convex piecewise linear functions. Computational results for difficult instances of the benchmark library TTPLIB are reported.
This paper presents a case study on a railway timetable optimization for the very dense Simplon corridor, a major railway connection in the Alps between Switzerland and Italy. Starting from a detailed microscopic network as it is used in railway simulation, the data is transformed by an automatic procedure to a less detailed macroscopic network, that is sufficient for the purpose of capacity planning and amenable to state-of-the-art integer programming optimization methods. In this way, the macroscopic railway network is saturated with trains. Finally, the corresponding timetable is re-transformed to the microscopic level in such a way that it can be operated without any conflicts among the slots. Using this integer programming based micro-macro aggregation-disaggregation approach, it becomes for the first time possible to generate a profit maximal and conflict free timetable for the complete Simplon corridor over an entire day by a simultaneous optimization of all trains requests. This also allows to to undertake a sensitivity analysis of various problem parameters.
Wir stellen in dieser Arbeit ein mathematisches Optimierungsmodell zur Bestimmung eines optimalen Linienplans vor, das sowohl die Fahrzeiten und die Anzahl der Umstiege berücksichtigt als auch die Kosten des Liniennetzes. Dieses Modell deckt wichtige praktische Anforderungen ab, die in einem gemeinsamen Projekt mit den Verkehrsbetrieben in Potsdam (ViP) formuliert wurden. In diesem Projekt wurde der Linienplan 2010 für Potsdam entwickelt. Unsere Berechnungen zeigen, dass die mathematische Optimierung in nichts einer "Handplanung" des Liniennetzes nachsteht. Im Gegenteil, mit Hilfe des Optimierungsprogramms ist es möglich, durch Veränderung der Parameter mehrere verschiedene Szenarien zu berechnen, miteinander zu vergleichen und Aussagen über minimale Kosten und Fahrzeiten zu machen.