90C20 Quadratic programming
Refine
Document Type
- ZIB-Report (2)
Language
- English (2)
Has Fulltext
- yes (2)
Is part of the Bibliography
- no (2)
Keywords
- bisection (1)
- downside risk (1)
- equicut (1)
- max-cut (1)
- mean-variance analysis (1)
- multi-period model (1)
- quadratic 0-1 programming (1)
- semidefinite programming (1)
- spectral bundle method (1)
- subgradient method (1)
Institute
- ZIB Allgemein (2) (remove)
The recent spectral bundle method allows to compute, within reasonable time, approximate dual solutions of large scale semidefinite quadratic 0-1 programming relaxations. We show that it also generates a sequence of primal approximations that converge to a primal optimal solution. Separating with respect to these approximations gives rise to a cutting plane algorithm that converges to the optimal solution under reasonable assumptions on the separation oracle and the feasible set. We have implemented a practical variant of the cutting plane algorithm for improving semidefinite relaxations of constrained quadratic 0-1 programming problems by odd-cycle inequalities. We also consider separating odd-cycle inequalities with respect to a larger support than given by the cost matrix and present a heuristic for selecting this support. Our preliminary computational results for max-cut instances on toroidal grid graphs and balanced bisection instances indicate that warm start is highly efficient and that enlarging the support may sometimes improve the quality of relaxations considerably.
Mean-variance portfolio analysis provided the first quantitative treatment of the tradeoff between profit and risk. We investigate in detail the interplay between objective and constraints in a number of single-period variants, including semi-variance models. Particular emphasis is laid on avoiding the penalization of overperformance. The results are then used as building blocks in the development and theoretical analysis of multi-period models based on scenario trees. A key property is the possibility to remove surplus money in future decisions, yielding approximate downside risk minimization.