90B30 Production models
Refine
Document Type
- ZIB-Report (3)
- Master's Thesis (1)
Language
- English (4)
Has Fulltext
- yes (4)
Is part of the Bibliography
- no (4)
Keywords
- ATSP (1)
- Multi-Criteria Optimisation (1)
- Sustainability Indicator (1)
- System Dynamics (1)
- Value Creation Process (1)
- nonidentical machines (1)
- polyhedral relaxations (1)
- scheduling (1)
Institute
In this paper we investigate the performance of several out-of-the box solvers for mixed-integer quadratically constrained programmes (MIQCPs) on an open pit mine production scheduling problem with mixing constraints. We compare the solvers BARON, Couenne, SBB, and SCIP to a problem-specific algorithm on two different MIQCP formulations. The computational results presented show that general-purpose solvers with no particular knowledge of problem structure are able to nearly match the performance of a hand-crafted algorithm.
It is clear that a transformation to sustainable value creation is needed, because business as usual is not an option for preserving competitive advantages of leading industries. What does that mean? This contribution proposes possible approaches for a shift in existing manufacturing paradigms. In a first step, sustainability aspects from the German Sustainability Strategy and from the tools of life cycle sustainability assessment are chosen to match areas of a value creation process. Within these aspects are indicators, which can be measured within a manufacturing process. Once these data are obtained they can be used to set up a mathematical linear pulse model of manufacturing in order to analyse the evolution of the system over time, that is the transition process, by using a system dynamics approach. An increase of technology development by a factor of 2 leads to an increase of manufacturing but also to an increase of climate change. Compensation measures need to be taken. This can be done by e.g. taking money from the GDP (as an indicator of the aspect ``macroeconomic performance''). The value of the arc from that building block towards climate change must then be increased by a factor of 10. The choice of independent and representative indicators or aspects shall be validated and double-checked for their significance with the help of multi-criteria mixed-integer programming optimisation methods.
Since the initial application of mathematical optimisation methods to mine planning in 1965, the Lerchs-Grossmann algorithm for computing the ultimate pit limit, operations researchers have worked on a variety of challenging problems in the area of open pit mining. This thesis focuses on the open pit mining production scheduling problem: Given the discretisation of an orebody as a block model, determine the sequence in which the blocks should be removed from the pit, over the lifespan of the mine, such that the net present value of the mining operation is maximised. In practise, when some material has been removed from the pit, it must be processed further in order to extract the valuable elements contained therein. If the concentration of valuable elements is not sufficiently high, the material is discarded as waste or stockpiled. Realistically-sized block models can contain hundreds of thousands of blocks. A common approach to render these problem instances computationally tractable is the aggregation of blocks to larger scheduling units. The thrust of this thesis is the investigation of a new mixed-integer programming formulation for the open pit mining production scheduling problem, which allows for processing decisions to be made at block level, while the actual mining schedule is still computed at aggregate level. A drawback of this model in its full form is the large number of additional variables needed to model the processing decisions. One main result of this thesis shows how these processing variables can be aggregated efficiently to reduce the problem size significantly, while practically incurring no loss in net present value. The second focus is on the application of lagrangean relaxation to the resource constraints. Using a result of Möhring et al. (2003) for project scheduling, the lagrangean relaxation can be solved efficiently via minimum cut computations in a weighted digraph. Experiments with a bundle algorithm implementation by Helmberg showed how the lagrangean dual can be solved within a small fraction of the time required by standard linear programming algorithms, while yielding practically the same dual bound. Finally, several problem-specific heuristics are presented together with computational results: two greedy sub-MIP start heuristics and a large neighbourhood search heuristic. A combination of a lagrangean-based start heuristic followed by a large neighbourhood search proved to be effective in generating solutions with objective values within a 0.05% gap of the optimum.
The m-Cost ATSP
(1999)
Although the m-ATSP (or multi traveling salesman problem) is well known for its importance in scheduling and vehicle routing, it has, to the best of our knowledge, never been studied polyhedraly, i.e., it has always been transformed to the standard ATSP. This transformation is valid only if the cost of an arc from node $i$ to node $j$ is the same for all machines. In many practical applications this is not the case, machines produce with different speeds and require different (usually sequence dependent) setup times. We present first results of a polyhedral analysis of the m-ATSP in full generality. For this we exploit the tight relation between the subproblem for one machine and the prize collecting traveling salesman problem. We show that, for $m\ge 3$ machines, all facets of the one machine subproblem also define facets of the m-ATSP polytope. In particular the inequalities corresponding to the subtour elimination constraints in the one machine subproblems are facet defining for m-ATSP for $m\ge 2$ and can be separated in polynomial time. Furthermore, they imply the subtour elimination constraints for the ATSP-problem obtained via the standard transformation for identical machines. In addition, we identify a new class of facet defining inequalities of the one machine subproblem, that are also facet defining for m-ATSP for $m\ge 2$. To illustrate the efficacy of the approach we present numerical results for a scheduling problem with non-identical machines, arising in the production of gift wrap at Herlitz PBS AG.