90B06 Transportation, logistics
Filtern
Erscheinungsjahr
- 2006 (1)
Dokumenttyp
- ZIB-Report (1)
Sprache
- Englisch (1)
Volltext vorhanden
- ja (1)
Gehört zur Bibliographie
- nein (1) (entfernen)
Schlagworte
Institut
- ZIB Allgemein (1) (entfernen)
This paper concerns the problem of operating a landside container exchange area that is serviced by multiple semi-automated rail mounted gantry cranes (RMGs) that are moving on a single bi-directional traveling lane. Such a facility is being built by Patrick Corporation at the Port Botany terminal in Sydney. The gantry cranes are a scarce resource and handle the bulk of container movements. Thus, they require a sophisticated analysis to achieve near optimal utilization. We present a three stage algorithm to manage the container exchange facility, including the scheduling of cranes, the control of associated short-term container stacking, and the allocation of delivery locations for trucks and other container transporters. The key components of our approach are a time scale decomposition, whereby an integer program controls decisions across a long time horizon to produce a balanced plan that is fed to a series of short time scale online subproblems, and a highly efficient space-time divisioning of short term storage areas. A computational evaluation shows that our heuristic can find effective solutions for the planning problem; on real-world data it yields a solution at most~8\% above a lower bound on optimal RMG utilization.