90-XX OPERATIONS RESEARCH, MATHEMATICAL PROGRAMMING
Refine
Document Type
- ZIB-Report (5)
Language
- English (5)
Has Fulltext
- yes (5)
Keywords
- Constraint Programming (1)
- Cumulative Scheduling (1)
- Depot Planning (1)
- Heuristic (1)
- Integer Linear Programming (1)
- Lower Bound (1)
- Mixed-Integer Programming (1)
- Predictive Maintenance (1)
- Propagation Algorithm (1)
- Railway Track Assignment (1)
Institute
We study the solution of the rolling stock rotation problem with predictive maintenance (RSRP-PM) by an iterative refinement approach that is based on a state-expanded event-graph. In this graph, the states are parameters of a failure distribution, and paths correspond to vehicle rotations with associated health state approximations. An optimal set of paths including maintenance can be computed by solving an integer linear program. Afterwards, the graph is refined and the procedure repeated. An associated linear program gives rise to a lower bound that can be used to determine the solution quality. Computational results for two instances derived from real world timetables of a German railway company are presented. The results show the effectiveness of the approach and the quality of the solutions.
We consider the Cumulative Scheduling Problem (CuSP) in which a set of $n$ jobs must be scheduled according to release dates, due dates and cumulative resource constraints. In constraint programming, the CuSP is modeled as the cumulative constraint. Among the most common propagation algorithms for the CuSP there is energetic reasoning (Baptiste et al., 1999) with a complexity of O(n^3) and edge-finding (Vilim, 2009) with O(kn log n) where k <= n is the number of different resource demands. We consider the complete versions of the propagators that perform all deductions in one call of the algorithm. In this paper, we introduce the energetic edge-finding rule that is a generalization of both energetic reasoning and edge-finding. Our main result is a complete energetic edge-finding algorithm with a complexity of O(n^2 log n) which improves upon the complexity of energetic reasoning. Moreover, we show that a relaxation of energetic edge-finding with a complexity of O(n^2) subsumes edge-finding while performing stronger propagations from energetic reasoning. A further result shows that energetic edge-finding reaches its fixpoint in strongly polynomial time. Our main insight is that energetic schedules can be interpreted as a single machine scheduling problem from which we deduce a monotonicity property that is exploited in the algorithms. Hence, our algorithms improve upon the strength and the complexity of energetic reasoning and edge-finding whose complexity status seemed widely untouchable for the last decades.
A Polyhedral Study of Event-Based Models for the Resource-Constrained Project Scheduling Problem
(2018)
We consider event-based Mixed-Integer Programming (MIP) models for the Resource-Constrained Project Scheduling Problem (RCPSP) that represent an alternative to the common time-indexed model (DDT) of Pritsker et al. (1969) for the case where the underlying time horizon is large or job processing times are subject to huge variations. In contrast to the time-indexed model, the size of event-based models does not depend on the time horizon. For two event-based formulations OOE and SEE of Koné et al. (2011) we present new valid inequalities that dominate the original formulation. Additionally, we introduce a new event-based model: the Interval Event-Based Model (IEE). We deduce linear transformations between all three models that yield the strict domination order IEE > SEE > OOE for their linear programming (LP) relaxations, meaning that IEE has the strongest linear relaxation among the event-based models. We further show that the popular DDT formulation can be retrieved from IEE by certain polyhedral operations, thus giving a unifying view on a complete branch of MIP formulations for the RCPSP. In addition, we analyze the computational performance of all presented models on test instances of the PSPLIB (Kolisch and Sprecher 1997).
Managing rolling stock with no passengers aboard is a critical component of railway operations. In particular, one problem is to park the rolling stock on a given set of tracks at the end of a day or service. Depending on the parking assignment, shunting may be required in order for a parked train to depart or for an incoming train to park. Given a collection of tracks M and a collection of trains T with fixed arrival-departure timetable, the train assignment problem (TAP) is to determine the maximum number of trains from T that can be parked on M according to the timetable and without the use of shunting. Hence, efficiently solving the TAP allows to quickly compute feasible parking schedules that do not require further shunting adjustments. In this paper, we present two integer programming models for solving the TAP. To our knowledge, this is the first integrated approach that considers track lengths along with the three most common types of parking tracks. We compare these models on a theoretical level. We also prove that a decision version of the TAP is NP-complete, justifying the use of integer programming techniques. Using stochastic and robust modelling techniques, both models produce parking assignments that are optimized and robust according to random train delays. We conclude with computational results for both models, observing that they perform well on real timetables.
The Graduate-Level Research in Industrial Projects (G-RIPS) Program provides an
opportunity for high-achieving graduate-level students to work in teams on a
real-world research project proposed by a sponsor from industry or the public
sector. Each G-RIPS team consists of four international students (two from
the US and two from European universities), an academic mentor, and an industrial sponsor.
This is the report of the Rail-Lab project on the definition and integration of
robustness aspects into optimizing rolling stock schedules. In general, there is
a trade-off for complex systems between robustness and efficiency. The ambitious
goal was to explore this trade-off by implementing numerical simulations and
developing analytic models.
In rolling stock planning a very large set of industrial railway requirements,
such as vehicle composition, maintenance constraints, infrastructure capacity,
and regularity aspects, have to be considered in an integrated model. General
hypergraphs provide the modeling power to tackle those requirements.
Furthermore, integer programming approaches are able to produce high quality
solutions for the deterministic problem.
When stochastic time delays are considered, the mathematical programming problem
is much more complex and presents additional challenges. Thus, we started with a
basic variant of the deterministic case, i.e., we are only considering
hypergraphs representing vehicle composition and regularity.
We transfered solution approaches for robust optimization
from the airline industry to the setting of railways and attained a
reasonable measure of robustness. Finally, we present and discuss different
methods to optimize this robustness measure.