68W40 Analysis of algorithms [See also 68Q25]
Refine
Document Type
- ZIB-Report (2)
Language
- English (2)
Has Fulltext
- yes (2)
Is part of the Bibliography
- no (2)
Keywords
Institute
We consider a multicommodity routing problem, where demands are released \emph{online} and have to be routed in a network during specified time windows. The objective is to minimize a time and load dependent convex cost function of the aggregate arc flow. First, we study the fractional routing variant. We present two online algorithms, called Seq and Seq$^2$. Our first main result states that, for cost functions defined by polynomial price functions with nonnegative coefficients and maximum degree~$d$, the competitive ratio of Seq and Seq$^2$ is at most $(d+1)^{d+1}$, which is tight. We also present lower bounds of $(0.265\,(d+1))^{d+1}$ for any online algorithm. In the case of a network with two nodes and parallel arcs, we prove a lower bound of $(2-\frac{1}{2} \sqrt{3})$ on the competitive ratio for Seq and Seq$^2$, even for affine linear price functions. Furthermore, we study resource augmentation, where the online algorithm has to route less demand than the offline adversary. Second, we consider unsplittable routings. For this setting, we present two online algorithms, called U-Seq and U-Seq$^2$. We prove that for polynomial price functions with nonnegative coefficients and maximum degree~$d$, the competitive ratio of U-Seq and U-Seq$^2$ is bounded by $O{1.77^d\,d^{d+1}}$. We present lower bounds of $(0.5307\,(d+1))^{d+1}$ for any online algorithm and $(d+1)^{d+1}$ for our algorithms. Third, we consider a special case of our framework: online load balancing in the $\ell_p$-norm. For the fractional and unsplittable variant of this problem, we show that our online algorithms are $p$ and $O{p}$ competitive, respectively. Such results where previously known only for scheduling jobs on restricted (un)related parallel machines.
Many online problems encountered in real-life involve a two-stage decision process: upon arrival of a new request, an irrevocable first-stage decision (the assignment of a specific resource to the request) must be made immediately, while in a second stage process, certain ``subinstances'' (that is, the instances of all requests assigned to a particular resource) can be solved to optimality (offline) later. We introduce the novel concept of an \emph{Online Target Date Assignment Problem} (\textsc{OnlineTDAP}) as a general framework for online problems with this nature. Requests for the \textsc{OnlineTDAP} become known at certain dates. An online algorithm has to assign a target date to each request, specifying on which date the request should be processed (e.\,g., an appointment with a customer for a washing machine repair). The cost at a target date is given by the \emph{downstream cost}, the optimal cost of processing all requests at that date w.\,r.\,t.\ some fixed downstream offline optimization problem (e.\,g., the cost of an optimal dispatch for service technicians). We provide general competitive algorithms for the \textsc{OnlineTDAP} independently of the particular downstream problem, when the overall objective is to minimize either the sum or the maximum of all downstream costs. As the first basic examples, we analyze the competitive ratios of our algorithms for the par ticular academic downstream problems of bin-packing, nonpreemptive scheduling on identical parallel machines, and routing a traveling salesman.