Refine
Year of publication
- 2012 (10) (remove)
Document Type
- Article (4)
- ZIB-Report (4)
- In Proceedings (1)
- Doctoral Thesis (1)
Language
- English (10)
Is part of the Bibliography
- no (10)
Keywords
Rapid Branching
(2012)
We propose rapid branching (RB) as a general branch-and-bound heuristic
for solving large scale optimization problems in traffic and transport.
The key idea is to combine a special branching rule and a greedy node selection
strategy in order to produce solutions of controlled quality rapidly
and efficiently. We report on three successful applications of the method
for integrated vehicle and crew scheduling, railway track allocation, and
railway vehicle rotation planning.
This paper provides a generic formulation for rolling stock planning
problems in the context of intercity passenger traffic. The main contributions
are a graph theoretical model and a Mixed-Integer-Programming
formulation that integrate all main requirements of the considered
Vehicle-Rotation-Planning problem (VRPP). We show that it is
possible to solve this model for real-world instances provided by our
industrial partner DB Fernverkehr AG using modern algorithms and
computers.
The steel mill slab design problem from the CSPLIB is a combinatorial optimization problem motivated by an application of the steel industry. It has been widely studied in the constraint programming community. Several methods were proposed to solve this problem. A steel mill slab library was created which contains 380 instances. A closely related binpacking problem called the multiple knapsack problem with color constraints, originated from the same industrial problem, was discussed in the integer programming community. In particular, a simple integer program for this problem has been given by Forrest et al. (INFORMS J Comput 18:129–134, 2006). The aim of this paper is to bring these different studies together. Moreover, we adapt the model of Forrest et al. (INFORMS J Comput 18:129–134, 2006) for the steel mill slab design problem. Using this model and a state-of-the-art integer program solver all instances of the steel mill slab library can be solved efficiently to optimality. We improved, thereby, the solution values of 76 instances compared to previous results (Schaus et al., Constraints 16:125–147, 2010). Finally, we consider a recently introduced variant of the steel mill slab design problem, where within all solutions which minimize the leftover one is interested in a solution which requires a minimum number of slabs. For that variant we introduce two approaches and solve all instances of the steel mill slab library with this slightly changed objective function to optimality.
Today the railway timetabling process and the track allocation is one of the most challenging problems to solve by a railway company. Especially due to the deregulation of the transport market in the recent years several suppliers of railway traffic have entered the market in Europe. This leads to more potential conflicts between trains caused by an increasing demand of train paths. Planning and operating railway transportation systems is extremely hard due to the combinatorial complexity of the underlying discrete optimization problems, the technical intricacies, and the immense size of the problem instances. In order to make best use of the infrastructure and to ensure economic operation, efficient planning of the railway operation is indispensable. Mathematical optimization models and algorithms can help to automatize and tackle these challenges. Our contribution in this paper is to present a renewed planning process due to the liberalization in Europe and an associated concept for track allocation, that consists of three important parts, simulation, aggregation, and optimization. Furthermore, we present results of our general framework for real world data.
This paper provides a generic formulation for rolling stock planning problems in the context of intercity passenger traffic. The main contributions are a graph theoretical model and a Mixed-Integer-Programming formulation that integrate all main requirements of the considered Vehicle-Rotation-Planning problem (VRPP). We show that it is possible to solve this model for real-world instances provided by our industrial partner DB Fernverkehr AG using modern algorithms and computers.
Railway Track Allocation
(2012)
This paper provides a highly integrated solution approach for rolling stock
planning problems in the context of intercity passenger traffic. The main
contributions are a generic hypergraph based mixed integer programming
model and an integrated algorithm for the considered rolling stock rotation
planning problem. The new developed approach is able to handle a very large
set of industrial railway requirements, such as vehicle composition,
maintenance constraints, infrastructure capacity, and regularity aspects.
By the integration of this large bundle of technical railway aspects, we show
that our approach has the power to produce implementable rolling stock
rotations for our industrial cooperation partner DB Fernverkehr.
This is the first time that the rolling stock rotations at DB Fernverkehr
could be optimized by an automated system utilizing advanced mathematical
programming techniques.
This thesis is about mathematical optimization for the efficient use of railway infrastructure. We address the
optimal allocation of the available railway track capacity - the track allocation problem.
This track allocation problem is a major challenge for a railway company, independent of
whether a free market, a private monopoly, or a public monopoly is given.
Planning and operating railway transportation systems is extremely hard due
to the combinatorial complexity of the underlying discrete optimization problems,
the technical intricacies, and the immense sizes of the problem instances. Mathematical models and optimization
techniques can result in huge gains for both railway customers and operators, e.g.,
in terms of cost reductions or service quality improvements.
We tackle this challenge by developing novel mathematical models and associated innovative algorithmic
solution methods for large scale instances. This allows us to produce for the first time reliable
solutions for a real world instance, i.e., the Simplon corridor in Switzerland.
The opening chapter gives a comprehensive overview on railway planning problems.
This provides insights into the regulatory and technical framework,
it discusses the interaction of several planning steps, and identifies optimization potentials in
railway transportation. The remainder of the thesis is comprised of two major parts.
The first part is concerned with modeling railway systems to allow for resource and capacity analysis.
Railway capacity has basically two dimensions, a space dimension which are the physical
infrastructure elements as well as a time dimension that refers to the train movements, i.e.,
occupation or blocking times, on the physical infrastructure. Railway safety systems operate
on the same principle all over the world. A train has to reserve infrastructure blocks for some time to pass through.
Two trains reserving the same block of the infrastructure within the same point in time is called block conflict.
Therefore, models for railway capacity involve the definition
and calculation of reasonable running and associated reservation and
blocking times to allow for a conflict free allocation.
In the second and main part of the thesis, the optimal track
allocation problem for macroscopic models of the railway system is considered.
The literature for related problems is surveyed.
A graph-theoretic model for the track allocation problem is
developed. In that model optimal track allocations correspond to
conflict-free paths in special time-expanded graphs.
Furthermore, we made considerable progress on solving track allocation problems by two
main features - a novel modeling approach for the macroscopic track
allocation problem and algorithmic improvements based on the
utilization of the bundle method.
Finally, we go back to practice and present in the last chapter several case
studies using the tools netcast and tsopt.
We provide a computational comparison of
our new models and standard packing models used in the literature.
Our computational experience indicates that our approach, i.e.,
``configuration models'', outperforms other models. Moreover, the rapid branching
heuristic and the bundle method enable us to produce high quality solutions for very large scale
instances, which has not been possible before.
In addition, we present results for a theoretical and rather visionary auction framework
for track allocation. We discuss several auction design questions and analyze experiments of
various auction simulations.
The highlights are results for the Simplon corridor in Switzerland.
We optimized the train traffic through this tunnel using our models and
software tools.
To the best knowledge of the author and confirmed by several railway
practitioners this was the first time that fully automatically produced
track allocations on a macroscopic scale fulfill the requirements
of the originating microscopic model, withstand the evaluation in the
microscopic simulation tool OpenTrack, and exploit the infrastructure capacity.
This documents the success of our approach in practice and the usefulness
and applicability of mathematical optimization to railway track allocation.
Railway Track Allocation
(2012)
This article gives an overview of the results of the author's PhD thesis. The thesis deals with the
mathematical optimization for the efficient use of
railway infrastructure. We address the optimal allocation of the available
railway track capacity - the track allocation problem. This track allocation
problem is a major challenge for a railway company, independent of whether
a free market, a private monopoly, or a public monopoly is given. Planning
and operating railway transportation systems is extremely hard due to the
combinatorial complexity of the underlying discrete optimization problems,
the technical intricacies, and the immense sizes of the problem instances.
Mathematical models and optimization techniques can result in huge gains
for both railway customers and operators, e.g., in terms of cost reductions or
service quality improvements. We tackle this challenge by developing novel
mathematical models and associated innovative algorithmic solution methods
for large scale instances. We made considerable progress on solving track
allocation problems by two main features - a novel modeling approach for the
macroscopic track allocation problem and algorithmic improvements based on the
utilization of the bundle method. This allows us to produce for the first time reliable solutions for a real world instance, i.e., the Simplon corridor in Switzerland.