Refine
Document Type
- Article (2)
- In Proceedings (2)
Language
- English (4)
Has Fulltext
- no (4)
Is part of the Bibliography
- no (4) (remove)
To attain the highest performance of energy supply systems, it is necessary to rationally determine design specifications in consideration of operational strategies corresponding to energy demands. Mixed-integer linear programming (MILP) approaches have been applied widely to such optimal design problems. A MILP method utilizing the hierarchical relationship between design and operation variables have been proposed to solve them efficiently. However, it cannot necessarily be effective to multi-objective optimal design problems because of the existence of a large number of competing design candidates. In this paper, the hierarchical MILP method is revised from the viewpoint of computation efficiency so that it can be applied practically to multi-objective optimal design problems. At the lower level, the order of the optimal operation problems to be solved is changed based on incumbents obtained previously to increase a lower bound for the optimal value of the combined objective function and reduce the number of the optimal operation problems to be solved. At the upper level, a lower bound for the optimal value of the combined objective function is incorporated into the solution method to reduce the number of the design candidates to be generated. This revised hierarchical MILP method is applied to a multiobjective optimal design of a gas turbine cogeneration plant, and its validity and effectiveness are clarified.
In designing energy supply systems, designers are requested to rationally determine equipment types, capacities, and numbers in consideration of equipment operational strategies corresponding to seasonal and hourly variations in energy demands. However, energy demands have some uncertainty at the design stage, and the energy demands which become certain at the operation stage may differ from those estimated at the design stage. Therefore, designers should consider that energy demands have some uncertainty, evaluate the performance robustness against the uncertainty, and design the systems to heighten the robustness. Especially, this issue is important for cogeneration plants, because their performances depend significantly on both heat and power demands. Although robust optimal design methods of energy supply systems under uncertain energy demands were developed, all of them are based on linear models for energy supply systems. However, it is still a hard challenge to develop a robust optimal design method even based on a mixed-integer linear model. At the first step for this challenge, in this paper, a method of evaluating the performance robustness of energy supply systems under uncertain energy demands is proposed based on a mixed-integer linear model. This problem is formulated as a bilevel mixed-integer linear programming one, and a sequential solution method is applied to solve it approximately by discretizing uncertain energy demands within their intervals. In addition, a hierarchical optimization method in consideration of the hierarchical relationship between design and operation variables is applied to solve large scale problems efficiently. Through a case study on a gas turbine cogeneration plant for district energy supply, the validity and effectiveness of the proposed method and features of the performance robustness of the plant are clarified.
Mixed-integer linear programming (MILP) methods have been applied widely to optimal design of en- ergy supply systems in consideration of multi-period operation. A hierarchical MILP method has been proposed to solve such optimal design problems efficiently. An original problem has been solved by dividing it into a relaxed optimal design problem at the upper level and optimal operation problems which are independent of one another at the lower level. In addition, some strategies have been pro- posed to enhance the computation efficiency furthermore. In this paper, a method of reducing model by time aggregation is proposed as a novel strategy to search design candidates efficiently in the relaxed optimal design problem at the upper level. In addition, the previous strategies are modified in accor- dance with the novel strategy. This method is realized only by clustering periods and averaging energy demands for clustered periods, while it guarantees to derive the optimal solution. Thus, it may decrease the computation time at the upper level. Through a case study on the optimal design of a gas turbine cogeneration system, it is clarified how the model reduction is effective to enhance the computation efficiency in comparison and combination with the modified previous strategies.
The mixed-integer linear programming (MILP) method has been applied widely to optimal design of energy supply systems. A hierarchical MILP method has been proposed to solve such optimal design problems efficiently. In addition, a method of reducing model by time aggregation has been proposed to search design candidates accurately and efficiently at the upper level. In this paper, the hierarchical MILP method and model reduction by time aggregation are applied to the multiobjective optimal design. The methods of clustering periods by the order of time series, by the k-medoids method, and based on an operational strategy are applied for the model reduction. As a case study, the multiobjective optimal design of a gas turbine cogeneration system is investigated by adopting the annual total cost and primary energy consumption as the objective functions, and the clustering methods are compared with one another in terms of the computation efficiency. It turns out that the model reduction by any clustering method is effective to enhance the computation efficiency when importance is given to minimizing the first objective function, but that the model reduction only by the k-medoids method is effective very limitedly when importance is given to minimizing the second objective function.