Refine
Document Type
- Article (2)
- In Proceedings (2)
- ZIB-Report (1)
Language
- English (5)
Is part of the Bibliography
- no (5)
Keywords
- Moving Block (1)
- Railway Timetabling (1)
- Railway Track Allocation (1)
- Train Routing (1)
Institute
- Network Optimization (5) (remove)
Deutsche Bahn (DB) operates a large fleet of rolling stock (locomotives, wagons, and train sets) that must be combined into trains to perform rolling stock rotations. This train composition is a special characteristic of railway operations that distinguishes rolling stock rotation planning from the vehicle scheduling problems prevalent in other industries. DB models train compositions using hyperarcs. The resulting hypergraph models are ad-dressed using a novel coarse-to-fine method that implements a hierarchical column genera-tion over three levels of detail. This algorithm is the mathematical core of DB’s fleet em-ployment optimization (FEO) system for rolling stock rotation planning. FEO’s impact within DB’s planning departments has been revolutionary. DB has used it to support the company’s procurements of its newest high-speed passenger train fleet and its intermodal cargo locomotive fleet for cross-border operations. FEO is the key to successful tendering in regional transport and to construction site management in daily operations. DB’s plan-ning departments appreciate FEO’s high-quality results, ability to reoptimize (quickly), and ease of use. Both employees and customers benefit from the increased regularity of operations. DB attributes annual savings of 74 million euro, an annual reduction of 34,000 tons of CO2 emissions, and the elimination of 600 coupling operations in cross-border operations to the implementation of FEO.
We present a heuristic based on linear programming (LP) for the
integrated tour and crew roster planning of toll enforcement inspectors. Their
task is to enforce the proper paying of a distance-based toll on German motorways. This leads to an integrated tour planning and duty rostering problem; it
is called Toll Enforcement Problem (TEP). We tackle the TEP by a standard
multi-commodity flow model with some extensions in order to incorporate the
control tours.
The heuristic consists of two variants. The first, called Price & Branch, is
a column generation approach to solve the model’s LP relaxation by pricing
tour and roster arc variables. Then, we compute an integer feasible solution
by restricting to all variables that were priced. The second is a coarse-to-fine approach. Its basic idea is projecting variables to an aggregated variable
space, which is much smaller. The aim is to spend as much algorithmic effort
in this coarse model as possible. For both heuristic procedures we will show
that feasible solutions of high quality can be computed even for large scale industrial instances.
We present an optimization model which is capable of routing and ordering trains on a microscopic level under a moving block regime. Based on a general timetabling definition (GTTP) that allows the plug in of arbitrarily detailed methods to compute running and headway times, we describe a layered graph approach using velocity expansion, and develop a mixed integer linear programming formulation. Finally, we present promising results for a German corridor scenario with mixed traffic, indicating that applying branch-and-cut to our model is able to solve reasonably sized instances with up to hundred trains to optimality.
We present an optimization model which is capable of routing and ordering trains on a microscopic level under a moving block regime. Based on a general timetabling definition (GTTP) that allows the plug in of arbitrarily detailed methods to compute running and headway times, we describe a layered graph approach using velocity expansion, and develop a mixed integer linear programming formulation. Finally, we present promising results for a German corridor scenario with mixed traffic, indicating that applying branch-and-cut to our model is able to solve reasonably sized instances with up to hundred trains to optimality.
Timetabling is a classical and complex task for public transport operators as well as for railway undertakings. The general question is: Which vehicle is taking which route through the transportation network in which order? In this paper, we consider the special setting to find optimal timetables for railway systems under a moving block regime. We directly set up on our work of [8 ], i.e., we consider the same model formulation and real-world instances of a moving block headway system. In this paper, we present a repair heuristic and a lazy-constraint approach utilizing the callback features of Gurobi, see [3]. We provide an experimental study of the different algorithmic approaches for a railway network with 100 and up to 300 train requests. The computational results show that the lazy-constraint approach together with the repair heuristic significantly improves our previous approaches.