Refine
Document Type
- ZIB-Report (2)
- In Proceedings (1)
- Master's Thesis (1)
Is part of the Bibliography
- no (4)
Keywords
Institute
The Rolling Stock Rotation Problem is to schedule rail vehicles in order to cover timetabled trips by a cost optimal set of vehicle rotations. The problem integrates several facets of railway optimization, such as vehicle composition, maintenance constraints, and regularity aspects. In industrial applications existing vehicle rotations often have to be re-optimized to deal with timetable changes or construction sites. We present an integrated modeling and algorithmic approach to this task as well as computational results for industrial problem instances of DB Fernverkehr AG.
The Rolling Stock Rotation Problem is to schedule rail vehicles in order to cover timetabled trips by a cost optimal set of vehicle rotations. The problem integrates several facets of railway optimization, i.e., vehicle composition, maintenance constraints, and regularity aspects.
In industrial applications existing schedules often have to be re-optimized to integrate timetable changes or construction sites.
We present an integrated modeling and algorithmic approach for this task as well as computational results for industrial problem instances of DB Fernverkehr AG.
The Cycle Embedding Problem
(2014)
Given two hypergraphs, representing a fine and a coarse "layer", and a cycle cover of the nodes of the coarse layer, the cycle embedding problem (CEP) asks for an embedding of the coarse cycles into the fine layer. The CEP is NP-hard for general hypergraphs, but it can be solved in polynomial time for graphs. We propose an integer rogramming formulation for the CEP that provides a complete escription of the CEP polytope for the graphical case. The CEP comes up in railway vehicle rotation scheduling. We present computational results for problem instances of DB Fernverkehr AG that justify a sequential coarse-first-fine-second planning approach.