Filtern
Dokumenttyp
- Artikel (4) (entfernen)
Sprache
- Englisch (4)
Volltext vorhanden
- nein (4)
Gehört zur Bibliographie
- nein (4)
Rolling stock, i.e., the set of railway vehicles, is among the most
expensive and limited assets of a railway company and must be used
efficiently. We consider in this paper the re-optimization
problem to recover from unforeseen disruptions. We propose a
template concept that allows to recover cost minimal rolling
stock rotations from reference rotations under a large variety of
operational requirements. To this end, connection templates as
well as rotation templates are introduced and their
application within a rolling stock rotation planning model is
discussed. We present an implementation within the rolling stock rotation
optimization framework rotor and computational results for
scenarios provided by DB Fernverkehr AG, one of the
leading railway operators in Europe.
A railway operator creates (rolling stock) rotations in order to have a precise master plan for the operation of a timetable by railway vehicles. A rotation is considered as a cycle that multiply traverses a set of operational days while covering trips of the timetable. As it is well known, the proper creation of rolling stock rotations by, e.g., optimization algorithms is challenging and still a topical research subject. Nevertheless, we study a completely different but strongly related question in this paper, i.e.: How to visualize a rotation? For this purpose, we introduce a basic handout concept, which directly leads to the visualization, i.e., handout of a rotation. In our industrial application at DB Fernverkehr AG, the handout is exactly as important as the rotation itself. Moreover, it turns out that also other European railway operators use exactly the same methodology (but not terminology). Since a rotation can have many handouts of different quality, we show how to compute optimal ones through an integer program (IP) by standard software. In addition, a construction as well as an improvement heuristic are presented. Our computational results show that the heuristics are a very reliable standalone approach to quickly find near-optimal and even optimal handouts. The efficiency of the heuristics is shown via a computational comparison to the IP approach.
A major step in the planning process of passenger railway operators is the assignment of rolling stock, i.e., train units, to the trips of the timetable. A wide variety of mathematical optimization models have been proposed to support this task, which we discuss and argue to be justified in order to deal with operational differences between railway operators, and hence different planning requirements, in the best possible way. Our investigation focuses on two commonly used models, the Composition model and the Hypergraph model, that were developed for Netherlands Railways (NS) and DB Fernverkehr AG (DB), respectively. We compare these models in a rolling stock scheduling setting similar to that of NS, which we show to be strongly NP-hard, and propose different variants of the Hypergraph model to tune the model to the NS setting. We prove that, in this setting, the linear programming bounds of both models are equally strong as long as a Hypergraph model variant is chosen that is sufficiently expressive. However, through a numerical evaluation on NS instances, we show that the Composition model is generally more compact in practice and can find optimal solutions in the shortest running time.
We study the solution of the rolling stock rotation problem with predictive maintenance (RSRP-PdM) by an iterative refinement approach that is based on a state-expanded event-graph. In this graph, the states are parameters of a failure distribution, and paths correspond to vehicle rotations with associated health state approximations. An optimal set of paths including maintenance can be computed by solving an integer linear program. Afterwards, the graph is refined and the procedure repeated. An associated linear program gives rise to a lower bound that can be used to determine the solution quality. Computational results for six instances derived from real-world timetables of a German railway company are presented. The results show the effectiveness of the approach and the quality of the solutions.