Refine
Document Type
- ZIB-Report (12)
Has Fulltext
- yes (12) (remove)
Is part of the Bibliography
- no (12)
Keywords
- integer programming (2)
- telecommunications (2)
- Biobjective Optimization (1)
- Branch and Bound (1)
- Bundesliga (1)
- Connected Facility Location (1)
- Connected Facility Location, Branch-and-Cut, FTTx Deployment (1)
- Dynamic Traffic (1)
- FTTx, FTTH, FTTB, FTTC, FTTN, telecommunications, access networks, passive optical networks, network design, routing, energy efficiency (1)
- Hypervolume (1)
Institute
We present two algorithms to solve a 3-objective optimization problem arising in telecommunications access network planning, the k-Architecture Connected Facility Location Problem. The methods can also be used to solve any 3-objective integer linear programming model and can be extended to the multiobjective case. We give some exemplary computations using small and medium-sized instances for our problem.
In this paper we study the cost-optimal deployment of optical access networks considering variants of the problem such as fiber to the home (FTTH), fiber to the building (FTTB), fiber to the curb (FTTC), or fiber to the neighborhood (FTTN). We identify the combinatorial structures of the most important sub-problems arising in this area and model these, e.g., as capacitated facility location, concentrator location, or Steiner tree problems. We discuss modeling alternatives as well. We finally construct a “unified” integer programming model that combines all sub-models and provides a global view of all these FTTx problems. We also summarize computational studies of various special cases.
Das vom BMBF geförderte Projekt FTTX-PLAN entwickelt mathematische Modelle und Optimierungsverfahren, um automatisiert kostenoptimierte FTTx-Netze berechnen zu können. Wir zeigen anhand einer Praxisstudie in Zusammenarbeit mit der Regensburger R-KOM, wie ein Planer von diesen Verfahren profitieren kann, um die Auswirkungen bestimmter Entscheidungen auf die Netzstruktur und -kosten zu untersuchen. Wir illustrieren dies am Beispiel eines FTTB/FTTH-Vergleichs, der Variation von Kundenanbindungsraten und der gezielten Ausnutzung existierender Leerrohre, um Tiefbau zu vermeiden.
Energy storages can be of great value when added to power grids. They introduce the possibility to store and release energy whenever this is favorable. This is particularly relevant, for example, if power supply is volatile (as is the case with renewable energy) and the network is small (so that there are few other nodes that might balance fluctuations in consumption or production). We present models and methods from mathematical optimization for computing an optimized storage schedule for this purpose. We look at alternative optimization objectives, such as smallest possible peak load, low energy costs, or the close approximation of a prescribed load curve. The optimization needs to respect general operational and economic constraints as well as limitations in the use of storage, which are imposed by the chosen storage technology. We therefore introduce alternative approaches for modeling the non-linear properties of energy storages and study their impact on the efficiency of the optimization process. Finally, we present a computational study with batteries as storage devices. We use this to highlight the trade-off between solution quality and computational tractability. A version of the model for the purpose of leveling peaks and instabilities has been implemented into a control system for an office-building smart grid scenario.
We introduce a new variant of the connected facility location problem that allows for modeling mixed deployment strategies (FTTC/FTTB/FTTH) in the design of local access telecommunication networks. Several mixed integer programming models and valid inequalities are presented. Computational studies on realistic instances from three towns in Germany are provided.
Sports rankings are obtained by applying a system of rules to evaluate the
performance of the participants in a competition.
We consider rankings that result from assigning an ordinal rank to each
competitor according to their performance.
We develop an integer programming model for rankings that allows us
to calculate the number of points needed to guarantee
a team the ith position, as well as the minimum number of points
that could yield the ith place.
The model is very general and can thus be applied to many types of sports.
We discuss examples coming from football (soccer), ice hockey, and
Formula~1. We answer various questions and debunk a few myths along the way.
Are 40 points enough to avoid relegation in the Bundesliga?
Do 95 points guarantee the participation of a team in the NHL playoffs?
Moreover, in the season restructuration currently under consideration in the NHL,
will it be easier or harder to access the playoffs?
Is it possible to win the Formula~1 World Championship without winning at least one race
or without even climbing once on the podium?
Finally, we observe that the optimal solutions of the aforementioned model
are associated to extreme situations which are unlikely to happen. Thus,
to get closer to realistic scenarios, we enhance the model by adding some
constraints inferred from the results of the previous years.
In this paper we assess to which extent trenching costs of an FTTx network are unavoidable, even if technical side constraints are neglected. For that purpose we present an extended Steiner tree model. Using a variety of realistic problem instances we demonstrate that the total trenching cost can only be reduced by about 5 percent in realistic scenarios. This work has been funded by BMBF (German Federal Ministry of Education and Research) within the program "KMU-innovativ".
Energy-efficient operation of large telecommunication networks is an important issue today and in the near future. Given that the energy consumption rises with the ever increasing demand for capacity and network speed, there is a growing interest in strategies for a sustainable network management. It is a well-known fact that traffic demands vary significantly over time, most notably in day/night- and in weekly cycles. This provides the main potential for energy-saving strategies. We study the question of how much power is necessary to operate a network with state-of-the-art hardware during peak or low-traffic times. The study respects realistic side constraints, such as protection requirements and routing schemes, and takes the special structure of an extensive nation-wide optical network, including backbone and regional sections, into account. We formulate mixed integer programming models for the corresponding optimization problems using predictions for traffic matrices, as well as state-of-the-art hardware and power models. We address questions as the following: How much energy is spent in the core and in metro regions of the network and how big are the savings in low-demand scenarios if we always assume the system power-minimum in these situations? What is the influence of different hardware on the overall energy consumption? How much do different routing schemes or protection scenarios restrict potential energy savings?
As a basis for meaningful simulation and optimization efforts with regard to traffic engineering or energy consumption in telecommunication networks, suitable models are indispensable. This concerns not only realistic network topologies, but also models for the geographical distribution and the temporal dynamics of traffic, as well as the assumptions on network components and technology. This paper derives such a model from the practice of a large national carrier.
Applying the network and traffic model, we demonstrate its use by presenting various optimization cases related to energy-efficient telecommunication. Here, we focus on load-adaptivity by employing sleep modes to the network hardware, where several constraints on the reconfigurability of the network over time are considered.