Refine
Year of publication
Document Type
- ZIB-Report (18)
- Doctoral Thesis (1)
Has Fulltext
- yes (19) (remove)
Is part of the Bibliography
- no (19)
Keywords
Institute
We consider the problem of designing a network that employs a non-bifurcated shortest path routing protocol. The network's nodes and the set of potential links are given together with a set of forecasted end-to-end traffic demands. All relevant hardware components installable at links or nodes are considered. The goal is to simultaneously choose the network's topology, to decide which hardware components to install on which links and nodes, and to find appropriate routing weights such that the overall network cost is minimized. In this paper, we present a mathematical optimization model for this problem and an algorithmic solution approach based on a Lagrangian relaxation. Computational results achieved with this approach for several real-world network planning problems are reported.
Most data networks nowadays use shortest path protocols to route the traffic. Given administrative routing lengths for the links of the network, all data packets are sent along shortest paths with respect to these lengths from their source to their destination. In this paper, we present an integer programming algorithm for the minimum congestion unsplittable shortest path routing problem, which arises in the operational planning of such networks. Given a capacitated directed graph and a set of communication demands, the goal is to find routing lengths that define a unique shortest path for each demand and minimize the maximum congestion over all links in the resulting routing. We illustrate the general decomposition approach our algorithm is based on, present the integer and linear programming models used to solve the master and the client problem, and discuss the most important implementational aspects. Finally, we report computational results for various benchmark problems, which demonstrate the efficiency of our algorithm.
In this paper, we discuss the relation of unsplittable shortest path routing (USPR) to other routing schemes and study the approximability of three USPR network planning problems. Given a digraph $D=(V,A)$ and a set $K$ of directed commodities, an USPR is a set of flow paths $\Phi_{(s,t)}$, $(s,t)\in K$, such that there exists a metric $\lambda=(\lambda_a)\in \mathbb{Z}^A_+$ with respect to which each $\Phi_{(s,t)}$ is the unique shortest $(s,t)$-path. In the \textsc{Min-Con-USPR} problem, we seek for an USPR that minimizes the maximum congestion over all arcs. We show that this problem is hard to approximate within a factor of $\mathcal{O}(|V|^{1-\epsilon})$, but easily approximable within min$(|A|,|K|)$ in general and within $\mathcal{O}(1)$ if the underlying graph is an undirected cycle or a bidirected ring. We also construct examples where the minimum congestion that can be obtained by USPR is a factor of $\Omega(|V|^2)$ larger than that achievable by unsplittable flow routing or by shortest multi-path routing, and a factor of $\Omega(|V|)$ larger than by unsplittable source-invariant routing. In the CAP-USPR problem, we seek for a minimum cost installation of integer arc capacities that admit an USPR of the given commodities. We prove that this problem is $\mathcal{NP}$-hard to approximate within $2-\epsilon$ (even in the undirected case), and we devise approximation algorithms for various special cases. The fixed charge network design problem \textsc{Cap-USPR}, where the task is to find a minimum cost subgraph of $D$ whose fixed arc capacities admit an USPR of the commodities, is shown to be $\mathcal{NPO}$-complete. All three problems are of great practical interest in the planning of telecommunication networks that are based on shortest path routing protocols. Our results indicate that they are harder than the corresponding unsplittable flow or shortest multi-path routing problems.
This paper addresses the problem of designing a minimum cost network whose capacities are sufficiently large to allow a feasible routing of a given set of multicast commodities. A multicast commodity consists of a set of two or mo re terminals that need to be connected by a so called broadcast tree, which consumes on all of its edges a capacity as large as the demand value associated with that commodity. We model the network design problem with multicast commodities as the problem of packing capacitated Steiner trees in a graph. In the first part of the paper we present three mixed-integer programming formulations for this problem. The first natural formulation uses only one integer capacity variable for each edge and and one binary tree variable for each commodity-edge pair. Applying well-known techniques from the Steiner tree problem, we then develop a stronger directed and a multicommodity flow based mixed-integer programming formulation. In the second part of the paper we study the associated polyhedra and derive valid and even facet defining inequalities for the natural formulation. Finally, we describe separation algorithms for these inequalities and present computational results that demonstrate the strength of our extended formulations.
In this paper we investigate the performance of several out-of-the box solvers for mixed-integer quadratically constrained programmes (MIQCPs) on an open pit mine production scheduling problem with mixing constraints. We compare the solvers BARON, Couenne, SBB, and SCIP to a problem-specific algorithm on two different MIQCP formulations. The computational results presented show that general-purpose solvers with no particular knowledge of problem structure are able to nearly match the performance of a hand-crafted algorithm.
We investigate the problem of designing survivable broadband virtual private networks that employ the Open Shortest Path First (OSPF) routing protocol to route the packages. The capacities available for the links of the network are a minimal capacity plus multiples of a unit capacity. Given the directed communication demands between all pairs of nodes, we wish to select the capacities in a such way, that even in case of a single node or a single link failure a specified percentage of each demand can be satisfied and the costs for these capacities are minimal. We present a mixed--integer linear programming formulation of this problem and several heuristics for its solution. Furthermore, we report on computational results with real-world data.
This paper describes several experiments to explore the options for solving a class of mixed integer nonlinear programming problems that stem from a real-world mine production planning project. The only type of nonlinear constraints in these problems are bilinear equalities involving continuous variables, which enforce the ratios between elements in mixed material streams. A branch-and-bound algorithm to handle the integer variables has been tried in another project. However, this branch-and-bound algorithm is not effective for handling the nonlinear constraints. Therefore state-of-the-art nonlinear solvers are utilized to solve the resulting nonlinear subproblems in this work. The experiments were carried out using the NEOS server for optimization. After finding that current nonlinear programming solvers seem to lack suitable preprocessing capabilities, we preprocess the instances beforehand and use an heuristic approach to solve the nonlinear subproblems. In the appendix, we explain how to add a polynomial constraint handler that uses IPOPT as embedded nonlinear programming solver for the constraint programming framework SCIP. This is one of the crucial steps for implementing our algorithm in SCIP. We briefly described our approach and give an idea of the work involved.
We study the complexity of two Inverse Shortest Paths (ISP) problems with integer arc lengths and the requirement for uniquely determined shortest paths. Given a collection of paths in a directed graph, the task is to find positive integer arc lengths such that the given paths are uniquely determined shortest paths between their respective terminals. The first problem seeks for arc lengths that minimize the length of the longest of the prescribed paths. In the second problem, the length of the longest arc is to be minimized. We show that it is $np-hard$ to approximate the minimal longest path length within a factor less than $8/7$ or the minimal longest arc length within a factor less than $9/8$. This answers the (previously) open question whether these problems are $np-hard$ or not. We also present a simple algorithm that achieves an $\mathcal{O}(|V|)$-approximation guarantee for both variants. Both ISP problems arise in the planning of telecommunication networks with shortest path routing protocols. Our results imply that it is $\mathcal{NP}$-hard to decide whether a given path set can be realized with a real shortest path routing protocol such as OSPF, IS-IS, or RIP.
In this article we study the problem of designing a nation-wide communication network. Such networks usually consist of an access layer, a backbone layer, and maybe several intermediate layers. The nodes of each layer must be connected to those of the next layer in a tree-like fashion. The backbone layer has to satisfy certain survivability and routing constraints. Given the node locations, the demands between them, the possible connections and hardware configurations, and various other technical and administrational constraints, the goal is to decide, which node is assigned to which network level, how the nodes are connected, what hardware must be installed, and how traffic is routed in the backbone. Mixed integer linear programming models and solution methods are presented for both the access and the backbone network design problem. The focus is on the design of IP-over-SDH networks, but the access network design model and large parts of the backbone network design models are general and also applicable for other types of communication networks. Results obtained with these methods in the planning of the German research network are presented.
Der scharfe Wettbewerb innerhalb der Telekommunikationsbranche zwingt die Netzbetreiber dazu, ihre Investitionen genau zu planen und immer wieder Einsparungsmanahmen durchzuführen. Gleichzeitig ist es jedoch wichtig, die Qualität der angebotenen Dienste zu verbessern, um neue Kunden zu gewinnen und langfristig an sich zu binden. Die mathematische Optimierung bietet sich für viele solcher Aufgabenstellungen als hervorragend geeignetes Planungswerkzeug an. Ziel dieses Artikels ist es, ihre Methodik und ihre Anwendung speziell zur Kosten- und Qualitätsoptimierung in Kommunikationsnetzen vorzustellen. Anhand von vier konkreten Planungsaufgaben aus dem Bereich der Festnetzplanung wird aufgezeigt, wie sich komplexe Zusammenhänge in flexiblen mathematischen Modellen abbilden lassen und welche Verfahren zur automatisierten Bearbeitung der Probleme eingesetzt werden können. Die hier vorgestellten Methoden zeichnen sich insbesondere dadurch aus, dass sie neben hochwertigen Lösungen auch eine Qualittsgarantie liefern, mit der sich die Lsungen fundiert bewerten lassen. Die dokumentierten Ergebnisse aus verschiedenen Industrieprojekten belegen die Eignung und Güte der mathematischen Optimierung für die Praxis.