Refine
Year of publication
Document Type
- ZIB-Report (52)
- In Proceedings (38)
- Article (22)
- Book chapter (3)
- Book (1)
- Doctoral Thesis (1)
- Master's Thesis (1)
- Other (1)
Language
- English (119)
Keywords
- column generation (4)
- integer programming (4)
- network aggregation (4)
- rapid branching (4)
- Railway Track Allocation (3)
- railway track allocation (3)
- Column Generation (2)
- Fahrplanung (2)
- Netzwerkaggregation (2)
- Optimization (2)
Institute
The airline crew scheduling problem deals with the construction of crew rotations in order to cover the flights of a given schedule at minimum cost. The problem involves complex rules for the legality and costs of individual pairings and base constraints for the availability of crews at home bases. A typical instance considers a planning horizon of one month and several thousand flights. We propose a column generation approach for solving airline crew scheduling problems that is based on a set partitioning model. We discuss algorithmic aspects such as the use of bundle techniques for the fast, approximate solution of linear programs, a pairing generator that combines Lagrangean shortest path and callback techniques, and a novel rapid branching'' IP heuristic. Computational results for a number of industrial instances are reported. Our approach has been implemented within the commercial crew scheduling system NetLine/Crew of Lufthansa Systems Berlin GmbH.
We present an approach to implement an auction of railway slots. Railway network, train driving characteristics, and safety requirements are described by a simplified, but still complex macroscopic model. In this environment, slots are modelled as combinations of scheduled track segments. The auction design builds on the iterative combinatorial auction. However, combinatorial bids are restricted to some types of slot bundles that realize positive synergies between slots. We present a bidding language that allows bidding for these slot bundles. An integer programming approach is proposed to solve the winner determination problem of our auction. Computational results for auction simulations in the Hannover-Fulda-Kassel area of the German railway network give evidence that auction approaches can induce a more efficient use of railway capacity.
The steel mill slab design problem from the CSPLib is a binpacking problem that is motivated by an application of the steel industry and that has been widely studied in the constraint programming community. Recently, several people proposed new models and methods to solve this problem. A steel mill slab library was created which contains 380 instances. A closely related binpacking problem called multiple knapsack problem with color constraints, originated from the same industrial problem, were discussed in the integer programming community. In particular, a simple integer programming for this problem has been given by Forrest et al. [3]. The aim of this paper is to bring these different studies together. Moreover, we adopt the model of [3] for the steel mill slab problem. Using a state of the art integer program solver, this model is capable to solve all instances of the steel mill slab library, mostly in less than one second, to optimality. We improved, thereby, the solution value of 76 instances.
We introduce (TTPlib), a data library for train timetabling problems that can be accessed at http://ttplib.zib.de. In version 1.0, the library contains data related to 50 scenarios. Most instances result from the combination of macroscopic railway networks and several train request sets for the German long distance area containing Hannover, Kassel and Fulda, short denoted by Ha-Ka-Fu. In this paper, we introduce the data concepts of TTPlib, describe the scenarios included in the library and provide a free visualization tool TraVis.
Technical restrictions and challenging details let railway traffic become one of the most complex transportation systems. Routing trains in a conflict-free way through a track network is one of the basic scheduling problems for any railway company. This article focuses on a robust extension of this problem, also known as train timetabling problem (TTP), which consists in finding a schedule, a conflict free set of train routes, of maximum value for a given railway network. However, timetables are not only required to be profitable. Railway companies are also interested in reliable and robust solutions. Intuitively, we expect a more robust track allocation to be one where disruptions arising from delays are less likely to be propagated causing delays of subsequent trains. This trade-off between an efficient use of railway infrastructure and the prospects of recovery leads us to a bi-criteria optimization approach. On the one hand we want to maximize the profit of a schedule, that is more or less to maximize the number of feasible routed trains. On the other hand if two trains are scheduled as tight as possible after each other it is clear that a delay of the first one always affects the subsequent train. We present extensions of the integer programming formulation in [BorndoerferSchlechte2007] for solving (TTP). These models can incorporate both aspects, because of the additional track configuration variables. We discuss how these variables can directly be used to measure a certain type of robustness of a timetable. For these models which can be solved by column generation techniques, we propose so-called scalarization techniques, see [Ehrgott2005], to determine efficient solutions. Here, an efficient solution is one which does not allow any improvement in profit and robustness at the same time. We prove that the LP-relaxation of the (TTP) including an additional $\epsilon$-constraint remains solvable in polynomial time. Finally, we present some preliminary results on macroscopic real-world data of a part of the German long distance railway network.
We consider an auction of slots to run trains through a railway network. In contrast to the classical setting for combinatorial auctions, there is not only competition for slots, but slots can mutually exclude each other, such that general conflict constraints on bids arise. This turns the winner determination problem associated with such an auction into a complex combinatorial optimization problem. It also raises a number of auction design questions, in particular, on incentive compatibilty. We propose a single-shot second price auction for railway slots, the Vickrey Track Auction (VTA). We show that this auction is incentive compatible, i.e., rational bidders are always motivated to bid their true valuation, and that it produces efficient allocations, even in the presence of constraints on allocations. These properties are, however, lost when rules on the submission of bids such as, e.g., lowest bids, are imposed. Our results carry over to generalized" Vickrey auctions with combinatorial constraints.
This article is about the optimal track allocation problem (OPTRA) to find, in a given railway network, a conflict free set of train routes of maximum value. We study two types of integer programming formulations: a standard formulation that models block conflicts in terms of packing constraints, and a new extended formulation that is based on additional configuration' variables. We show that the packing constraints in the standard formulation stem from an interval graph, and that they can be separated in polynomial time. It follows that the LP relaxation of a strong version of this model, including all clique inequalities from block conflicts, can be solved in polynomial time. We prove that the extended formulation produces the same LP bound, and that it can also be computed with this model in polynomial time. Albeit the two formulations are in this sense equivalent, the extended formulation has advantages from a computational point of view, because it features a constant number of rows and is therefore amenable to standard column generation techniques. Results of an empirical model comparison on mesoscopic data for the Hannover-Fulda-Kassel region of the German long distance railway network are reported.
The \emph{optimal track allocation problem} (\textsc{OPTRA}), also known as the train routing problem or the train timetabling problem, is to find, in a given railway network, a conflict-free set of train routes of maximum value. We propose a novel integer programming formulation for this problem that is based on additional configuration' variables. Its LP-relaxation can be solved in polynomial time. These results are the theoretical basis for a column generation algorithm to solve large-scale track allocation problems. Computational results for the Hanover-Kassel-Fulda area of the German long distance railway network involving up to 570 trains are reported.
Rapid Branching
(2012)
We propose rapid branching (RB) as a general branch-and-bound heuristic
for solving large scale optimization problems in traffic and transport.
The key idea is to combine a special branching rule and a greedy node selection
strategy in order to produce solutions of controlled quality rapidly
and efficiently. We report on three successful applications of the method
for integrated vehicle and crew scheduling, railway track allocation, and
railway vehicle rotation planning.
This paper provides a generic formulation for rolling stock planning
problems in the context of intercity passenger traffic. The main contributions
are a graph theoretical model and a Mixed-Integer-Programming
formulation that integrate all main requirements of the considered
Vehicle-Rotation-Planning problem (VRPP). We show that it is
possible to solve this model for real-world instances provided by our
industrial partner DB Fernverkehr AG using modern algorithms and
computers.
Railway scheduling is based on the principle of the construction of a conflict-free timetable. This leads to a strict definition of capacity: in contrast with road transportation, it can be said in advance whether a given railway infrastructure can accommodate - at least in theory - a certain set of train requests. Consequently, auctions for railway capacity are modeled as auctions of discrete goods -- the train slots. We present estimates for the efficiency gain that may be generated by slot auctioning in comparison with list price allocation. We introduce a new class of allocation and auction problems, the feasible assignment problem, that is a proper generalization of the well-known combinatorial auction problem. The feasible assignment class was designed to cover the needs for an auction mechanism for railway slot auctions, but is of interest in its own right. As a practical instance to state and solve the railway slot allocation problem, we present an integer programming formulation, briefly the ACP, which turns out to be an instance of the feasible assignment problem and whose dual problem yields prices that can be applied to define a useful activity rule for the linearized version of the Ausubel Milgrom Proxy auction. We perform a simulation aiming to measure the impact on efficiency and convergence rate.
We consider the following freight train routing problem (FTRP). Given is a
transportation network with fixed routes for passenger trains and a
set of freight trains (requests), each defined by an origin and
destination station pair. The objective is to calculate a feasible
route for each freight train such that a sum of all expected delays and
all running times is minimal. Previous research concentrated on
microscopic train routings for junctions or inside major stations. Only
recently approaches were developed to tackle larger corridors or even
networks. We investigate the routing problem from a strategic
perspective, calculating the routes in a macroscopic transportation
network of Deutsche Bahn AG. Here macroscopic refers to an aggregation of
complex real-world structures are into fewer network elements. Moreover, the
departure and arrival times of freight trains are approximated.
The problem has a strategic
character since it asks only for a coarse routing through the network
without the precise timings. We give a mixed-integer nonlinear programming~(MINLP)
formulation for FTRP, which is a multi-commodity flow model on a time-expanded
graph with additional routing constraints. The model's nonlinearities are due to
an algebraic approximation of the delays of the trains on the arcs of
the network
by capacity restraint functions. The MINLP is reduced to a mixed-integer linear model~(MILP)
by piecewise linear approximation. The latter is solved by a state of the art MILP solver for various real-world test instances.
The track allocation problem, also known as train routing problem or train timetabling problem, is to find a conflict-free set of train routes of maximum value in a railway network. Although it can be modeled as a standard path packing problem, instances of sizes relevant for real-world railway applications could not be solved up to now. We propose a rapid branching column generation approach that integrates the solution of the LP relaxation of a path coupling formulation of the problem with a special rounding heuristic. The approach is based on and exploits special properties of the bundle method for the approximate solution of convex piecewise linear functions. Computational results for difficult instances of the benchmark library TTPLIB are reported.
In this paper a bottom-up approach of automatic simplification of a railway network is presented. Starting from a very detailed, microscopic level, as it is used in railway simulation, the network is transformed by an algorithm to a less detailed level (macroscopic network), that is sufficient for long-term planning and optimization. In addition running and headway times are rounded to a pre-chosen time discretization by a special cumulative method, which we will present and analyse in this paper. After the transformation we fill the network with given train requests to compute an optimal slot allocation. Then the optimized schedule is re-transformed into the microscopic level and can be simulated without any conflicts occuring between the slots. The algorithm is used to transform the network of the very dense Simplon corridor between Swiss and Italy. With our aggregation it is possible for the first time to generate a profit maximal and conflict free timetable for the corridor across a day by a simultaneously optimization run.
This paper presents a case study on a railway timetable optimization for the very dense Simplon corridor, a major railway connection in the Alps between Switzerland and Italy. Starting from a detailed microscopic network as it is used in railway simulation, the data is transformed by an automatic procedure to a less detailed macroscopic network, that is sufficient for the purpose of capacity planning and amenable to state-of-the-art integer programming optimization methods. In this way, the macroscopic railway network is saturated with trains. Finally, the corresponding timetable is re-transformed to the microscopic level in such a way that it can be operated without any conflicts among the slots. Using this integer programming based micro-macro aggregation-disaggregation approach, it becomes for the first time possible to generate a profit maximal and conflict free timetable for the complete Simplon corridor over an entire day by a simultaneous optimization of all trains requests. This also allows to to undertake a sensitivity analysis of various problem parameters.
Today the railway timetabling process and the track allocation
is one of the most challenging problems to solve by a railway company.
Especially due to the deregulation of the transport market in the recent years several
suppliers of railway traffic have entered the market in Europe. This leads to more
potential conflicts between trains caused by an increasing demand of train paths.
Planning and operating railway transportation systems is extremely hard due
to the combinatorial complexity of the underlying discrete optimization problems,
the technical intricacies, and the immense size of the problem instances.
In order to make best use of the infrastructure and to ensure economic operation,
efficient planning of the railway operation is indispensable.
Mathematical optimization models and algorithms can help
to automatize and tackle these challenges.
Our contribution in this paper is to present a renewed planning process
due to the liberalization in Europe and an associated concept for track allocation, that consists
of three important parts, simulation, aggregation, and optimization.
Furthermore, we present results of our general framework for real world data.
We propose a model for the integrated optimization of vehicle
rotations and vehicle compositions in long distance railway passenger
transport. The main contribution of the paper is a hypergraph model
that is able to handle the challenging technical requirements as
well as very general stipulations with respect to the ``regularity''
of a schedule. The hypergraph model directly generalizes network
flow models, replacing arcs with hyperarcs. Although NP-hard in
general, the model is computationally well-behaved in practice. High
quality solutions can be produced in reasonable time using high
performance Integer Programming techniques, in particular, column
generation and rapid branching. We show that, in this way,
large-scale real world instances of our cooperation partner DB
Fernverkehr can be solved.
The steel mill slab design problem from the CSPLIB is a combinatorial
optimization problem motivated by an application of the steel industry. It
has been widely studied in the constraint programming community. Several
methods were proposed to solve this problem. A steel mill slab library was
created which contains 380 instances. A closely related binpacking problem
called the multiple knapsack problem with color constraints, originated
from the same industrial problem, was discussed in the integer programming
community. In particular, a simple integer program for this problem has
been given by Forrest et al. The aim of this paper is to bring these
different studies together. Moreover, we adapt the model of Forrest et
al. for the steel mill slab design problem. Using this model and a
state-of-the-art integer program solver all instances of the steel mill
slab library can be solved efficiently to optimality. We improved,
thereby, the solution values of 76 instances compared to previous results.
Finally, we consider a recently introduced variant of the steel mill slab
design problem, where within all solutions which minimize the leftover one
is interested in a solution which requires a minimum number of slabs. For
that variant we introduce two approaches and solve all instances of the
steel mill slab library with this slightly changed objective function to
optimality.
A common technique in the solution of large or complex optimization problems is the use of micro-macro transformations. In this paper, we carry out a theoretical analysis of such transformations for the track allocation problem in railway networks. We prove that the cumulative rounding technique of Schlechte et al. satisfies two of three natural optimality criteria and that this performance cannot be improved. We also show that under extreme circumstances, this technique can perform inconvieniently by underestimating the global optimal value.
A common technique in the solution of large or complex optimization problems is the use of micro–macro transformations. In this paper, we carry out a theoretical analysis of such transformations for the track allocation problem in railway networks. We prove that the cumulative rounding technique of Schlechte et al. satisfies two of three natural optimality criteria and that this performance cannot be improved. We also show that under extreme circumstances, this technique can perform inconveniently by underestimating the global optimal value.
The Rolling Stock Rotation Problem is to schedule rail vehicles in order to cover timetabled trips by a cost optimal set of vehicle rotations. The problem integrates several facets of railway optimization, such as vehicle composition, maintenance constraints, and regularity aspects. In industrial applications existing vehicle rotations often have to be re-optimized to deal with timetable changes or construction sites. We present an integrated modeling and algorithmic approach to this task as well as computational results for industrial problem instances of DB Fernverkehr AG.
The task of the train timetabling problem or track allocation problem is to find conflict free schedules for a set of trains with predefined routes in a railway network. Especially for non-periodic instances models based on time expanded networks are often used. Unfortunately, the linear programming relaxation of these models is often extremely weak because these models do not describe combinatorial relations like overtaking possibilities very well. In this paper we extend the model by so called connected configuration subproblems. These subproblems perfectly describe feasible schedules of a small subset of trains (2-3) on consecutive track segments. In a Lagrangian relaxation approach we solve several of these subproblems together in order to produce solutions which consist of combinatorially compatible schedules along the track segments. The computational results on a mostly single track corridor taken from the INFORMS RAS Problem Solving Competition 2012 data indicate that our new solution approach is rather strong. Indeed, for this instance the solution of the Lagrangian relaxation is already integral.
Real world routing problems, e.g., in the airline industry or in public and rail transit, can feature complex non-linear cost functions. An important case are costs for crossing regions, such as countries or fare zones. We introduce the shortest path problem with crossing costs (SPPCC) to address such situations; it generalizes the classical shortest path problem and variants such as the resource constrained shortest path problem and the minimum label path problem. Motivated by an application in flight trajectory optimization with overflight costs, we focus on the case in which the crossing costs of a region depend only on the nodes used to enter or exit it. We propose an exact Two-Layer-Dijkstra Algorithm as well as a novel cost-projection linearization technique that approximates crossing costs by shadow costs on individual arcs, thus reducing the SPPCC to a standard shortest path problem. We evaluate all algorithms’ performance on real-world flight trajectory optimization instances, obtaining very good à posteriori error bounds.
Bus rapid transit systems in developing and newly industrialized countries are often operated at the limits of passenger capacity. In particular, demand during morning and afternoon peaks is hardly or even not covered with available line plans. In order to develop demand-driven line plans, we use two mathematical models in the form of integer programming problem formulations. While the actual demand data is specified with origin-destination pairs, the arc-based model considers the demand over the arcs derived from the origin-destination demand. In order to test the accuracy of the models in terms of demand satisfaction, we simulate the optimal solutions and compare number of transfers and travel times. We also question the effect of a selfish route choice behavior which in theory results in a Braess-like paradox by increasing the number of transfers when system capacity is increased with additional lines.
The task of the train timetabling problem or track allocation problem is to find conflict free schedules for a set of trains with predefined routes in a railway network. Especially for non-periodic instances models based on time expanded networks are often used. Unfortunately, the linear programming relaxation of these models is often extremely weak because these models do not describe combinatorial relations like overtaking possibilities very well. In this paper we extend the model by so called connected configuration subproblems. These subproblems perfectly describe feasible schedules of a small subset of trains (2-3) on consecutive track segments. In a Lagrangian relaxation approach we solve several of these subproblems together in order to produce solutions which consist of combinatorially compatible schedules along the track segments. The computational results on a mostly single track corridor taken from the INFORMS RAS Problem Solving Competition 2012 data indicate that our new solution approach is rather strong. Indeed, for this instance the solution of the Lagrangian relaxation is already integral.
Real world routing problems, e.g., in the airline industry or in public and rail transit, can feature complex non-linear cost functions. An important case are costs for crossing regions, such as countries or fare zones. We introduce the shortest path problem with crossing costs (SPPCC) to address such situations; it generalizes the classical shortest path problem and variants such as the resource constrained shortest path problem and the minimum label path problem. Motivated by an application in flight trajectory optimization with overflight costs, we focus on the case in which the crossing costs of a region depend only on the nodes used to enter or exit it. We propose an exact Two-Layer-Dijkstra Algorithm as well as a novel cost-projection linearization technique that approximates crossing costs by shadow costs on individual arcs, thus reducing the SPPCC to a standard shortest path problem. We evaluate all algorithms’ performance on real-world flight trajectory optimization instances, obtaining very good à posteriori error bounds.
Bus rapid transit systems in developing and newly industrialized countries often consist of a trunk with a path topology. On this trunk, several overlapping lines are operated
which provide direct connections. The demand varies heavily over the day, with morning and afternoon peaks typically in reverse directions. We propose an integer programming model for this problem, derive a structural property of line plans in the static (or single period) ``unimodal demand'' case, and consider approaches to the solution of the multi-period version that rely on clustering the demand into peak and off-peak service periods. An application to the Metrobüs system of Istanbul is discussed.
We consider the problem of enforcing a toll on a transportation network with limited inspection resources. We formulate a game theoretic model to optimize the allocation of the inspectors, taking the reaction of the network users into account. The model includes several important aspects for practical operation of the control strategy, such as duty types for the inspectors. In contrast to an existing formulation using flows to describe the users' strategies we choose a path formulation and identify dominated user strategies to significantly reduce the problem size. Computational results suggest that our approach is better suited for practical instances.
The Train Dispatching Problem (TDP) is to schedule trains through a network in a cost optimal way. Due to disturbances during operation existing track allocations often have to be re-scheduled and integrated into the timetable. This has to be done in seconds and with minimal timetable changes to guarantee smooth and conflict free operation. We present an integrated modeling approach for the re-optimization task using Mixed Integer Programming. Finally, we provide computational results for scenarios provided by the INFORMS RAS Problem Soling Competition 2012.
The steel mill slab design problem from the CSPLIB is a combinatorial optimization problem motivated by an application of the steel industry. It has been widely studied in the constraint programming community. Several methods were proposed to solve this problem. A steel mill slab library was created which contains 380 instances. A closely related binpacking problem called the multiple knapsack problem with color constraints, originated from the same industrial problem, was discussed in the integer programming community. In particular, a simple integer program for this problem has been given by Forrest et al. (INFORMS J Comput 18:129–134, 2006). The aim of this paper is to bring these different studies together. Moreover, we adapt the model of Forrest et al. (INFORMS J Comput 18:129–134, 2006) for the steel mill slab design problem. Using this model and a state-of-the-art integer program solver all instances of the steel mill slab library can be solved efficiently to optimality. We improved, thereby, the solution values of 76 instances compared to previous results (Schaus et al., Constraints 16:125–147, 2010). Finally, we consider a recently introduced variant of the steel mill slab design problem, where within all solutions which minimize the leftover one is interested in a solution which requires a minimum number of slabs. For that variant we introduce two approaches and solve all instances of the steel mill slab library with this slightly changed objective function to optimality.
Given a directed, acyclic graph, a source and a sink node, and a set of forbidden pairs of arcs, the path avoiding forbidden pairs (PAFP) problem is to find a path that connects the source and sink nodes and contains at most one arc from each forbidden pair. The general version of the problem is NP-hard, but it becomes polynomially solvable for certain topological configurations of the pairs. We present the first polyhedral study of the PAFP problem. We introduce a new family of valid inequalities for the PAFP polytope and show that they are sufficient to provide a complete linear description in the special case where the forbidden pairs satisfy a disjointness property. Furthermore, we show that the number of facets of the PAFP polytope is exponential in the size of the graph, even for the case of a single forbidden pair.
Planning and operating railway transportation systems is an extremely hard task due to the combinatorial complexity of the underlying discrete optimization problems, the technical intricacies, and the immense size of the problem instances. Because of that, however, mathematical models and optimization techniques can result in large gains for both railway cus- tomers and operators, e.g., in terms of cost reductions or service quality improvements. In the last years a large and growing group of researchers in the OR community have devoted their attention to this domain devel- oping mathematical models and optimization approaches to tackle many of the relevant problems in the railway planning process. However, there is still a gap to bridge between theory and practice, with a few notable exceptions. In this paper we address three success stories, namely, long-term freight train routing (part I), mid-term rolling stock rotation planning (part II), and real-time train dispatching (part III). In each case, we describe real-life, successful implementations. We will dis- cuss the individual problem setting, survey the optimization literature, and focus on particular aspects addressed by the mathematical models. We demonstrate on concrete applications how mathematical optimization can support railway planning and operations. This gives proof that math- ematical optimization can support the planning of rolling stock resources. Thus, mathematical models and optimization can lead to a greater effi- ciency of railway operations and will serve as a powerful and innovative tool to meet recent challenges of the railway industry.
Duty rostering problems occur in different application contexts and come in different flavors. They give rise to very large scale integer programs which ypically have lots of solutions and extremely fractional LP relaxations. In such a situation, heuristics can be a viable algorithmic choice. We propose an mprovement method of the Lin-Kernighan type for the solution of duty rostering problems. We illustrate its versatility and solution quality on three different applications in public transit, vehicle routing, and airline rostering with a focus on the management of preferences, fairness, and fatigue, respectively.
Railway transportation and in particular train timetabling is one of the basic and source application areas of combinatorial optimization and integer programming. We will discuss two well established modeling techniques for the train timetabling problem. In this paper we focus on one major ingredient - the bounding by dual relaxations. We compare two classical dual relaxations of large scale time expanded train timetabling problems - the Lagrangean Dual and Lagrangean Decomposition. We discuss the convergence behavior and show limitations of the Lagrangean Decomposition approach for a configuration based model. We introduce a third dualization approach to overcome those limitations. Finally, we present promising preliminary computational experiments that show that our new approach indeed has superior convergence properties.
This paper proposes a highly integrated solution approach for rolling stock planning problems in the context of long distance passenger traffic between cities. The main contributions are a generic hypergraph-based mixed-integer programming model for the considered rolling stock rotation problem and an integrated algorithm for its solution. The newly developed algorithm is able to handle a large spectrum of industrial railway requirements, such as vehicle composition, maintenance constraints, infrastructure capacities, and regularity aspects. We show that our approach has the power to produce rolling stock rotations that can be implemented in practice. In this way, the rolling stock rotations at the largest German long distance operator Deutsche Bahn Fernverkehr AG could be optimized by an automated system utilizing advanced mathematical programming techniques.
Rolling stock, i.e., rail vehicles, are among the most expensive and limited assets of a railway company. They must be used efficiently applying optimization techniques. One important aspect is re-optimization, which is the topic that we consider in this paper. We propose a template concept that allows to compute cost minimal rolling stock rotations under a large variety of re-optimization requirements. Two examples, involving a connection template and a rotation template, are discussed. An implementation within the rolling stock rotation optimizer rotor and computational results for scenarios provided by DB Fernverkehr AG, one of the leading railway operators in Europe, are presented.
We consider the following freight train routing problem (FTRP).
Given is a transportation network with fixed routes for passenger
trains and a set of freight trains (requests), each defined by an
origin and destination station pair. The objective is to
calculate a feasible route for each freight train such that the
sum of all expected delays and all running times is minimal.
Previous research concentrated on microscopic train routings for
junctions or inside major stations. Only recently approaches were
developed to tackle larger corridors or even networks. We
investigate the routing problem from a strategic perspective,
calculating the routes in a macroscopic transportation network of
Deutsche Bahn AG. In this context, macroscopic refers to an
aggregation of complex and large real-world structures into fewer
network elements. Moreover, the departure and arrival times of
freight trains are approximated. The problem has a strategic
character since it asks only for a coarse routing through the
network without the precise timings. We provide a mixed-integer
nonlinear programming (MINLP) formulation for the FTRP, which is
a multicommodity flow model on a time-expanded graph with
additional routing constraints. The model’s nonlinearities
originate from an algebraic approximation of the delays of the
trains on the arcs of the network by capacity restraint
functions. The MINLP is reduced to a mixed-integer linear
model (MILP) by piecewise linear approximation. The latter is
solved by a state-of-the art MILP solver for various real-world
test instances.
We present the problem of planning mobile tours of inspectors on German motorways to enforce the payment of the toll for heavy good trucks. This is a special type of vehicle routing problem with the objective to conduct as good inspections as possible on the complete network. In addition, we developed a personalized crew rostering model, to schedule the crews of the tours. The planning of daily tours and the rostering are combined in a novel integrated approach and formulated as a complex and large scale Integer Program. The main focus of this paper extends our previous publications on how different requirements for the rostering can be modeled in detail. The second focus is on a bi-criteria analysis of the planning problem to find the balance between the control quality and the roster acceptance. Finally, computational results on real-world instances show the practicability of our method and how different input parameters influence the problem complexity.
The Cycle Embedding Problem
(2016)
Given two hypergraphs, representing a fine and a coarse "layer", and a cycle cover of the nodes of the coarse layer, the cycle embedding problem (CEP) asks for an embedding of the coarse cycles into the fine layer. The CEP is NP-hard for general hypergraphs, but it can be solved in polynomial time for graphs. We propose an integer rogramming formulation for the CEP that provides a complete escription of the CEP polytope for the graphical case. The CEP comes up in railway vehicle rotation scheduling. We present computational results for problem instances of DB Fernverkehr AG that justify a sequential coarse-first-fine-second planning approach.
The Train Dispatching Problem (TDP) is to schedule trains through a network in a cost optimal way. Due to disturbances during operation existing track allocations often have to be re-scheduled and integrated into the timetable. This has to be done in seconds and with minimal timetable changes to guarantee smooth and conflict free operation.
We present an integrated modeling approach for the re-optimization task using Mixed Integer Programming. Finally, we provide computational results for scenarios provided by the INFORMS RAS Problem Soling Competition 2012.
We consider the problem of enforcing a toll on a transportation network with limited inspection resources. We formulate a game theoretic model to optimize the allocation of the inspectors, taking the reaction of the network users into account. The model includes several important aspects for practical operation of the control strategy, such as duty types for the inspectors. In contrast to an existing formulation using flows to describe the users' strategies we choose a path formulation and identify dominated user strategies to
significantly reduce the problem size. Computational results suggest that our approach is better suited for practical instances.
Bus rapid transit systems in developing and newly
industrialized countries often consist of a trunk with a path
topology. On this trunk, several overlapping lines are operated
which provide direct connections. The demand varies heavily over the
day, with morning and afternoon peaks typically in reverse
directions. We propose an integer programming
model for this problem, derive a structural property of line plans
in the static (or single period) ``unimodal demand'' case, and
consider approaches to the solution of the multi-period version that
rely on clustering the demand into peak and off-peak service
periods. An application to the Metrobüs system of Istanbul is
discussed.