Refine
Document Type
- ZIB-Report (7)
Language
- English (7)
Has Fulltext
- yes (7)
Is part of the Bibliography
- no (7)
Keywords
- integer programming (7) (remove)
Institute
- ZIB Allgemein (7)
We consider the design of transparent optical networks from a practical perspective. Network operators aim at satisfying the communication demands at minimum cost. Such an optimization involves three interdependent planning issues: the dimensioning of the physical topology, the routing of lightpaths, and the wavelength assignment. Further topics include the reliability of the configuration and sparse wavelength conversion for efficient use of the capacities. In this paper, we investigate this extensive optical network design task. Using a flexible device-based model, we present an integer programming formulation that supports greenfield planning as well as expansion planning on top of an existing network. As solution method, we propose a suitable decomposition approach that separates the wavelength assignment from the dimensioning and routing. Our method in particular provides a lower bound on the total cost which allows to rate the solution quality. Computational experiments on realistic networks approve the solution approach to be appropriate.
In this paper, we study wavelength assignment problems in multi-fiber WDM networks. We focus on the special case that all lightpaths have at most two links. This in particular holds in case the network topology is a star. As the links incident to a specific node in a meshed topology form a star subnetwork, results for stars are also of interest for general meshed topologies. We show that wavelength assignment with at most two links per lightpath can be modeled as a generalized edge coloring problem. By this relation, we show that for a network with an even number of fibers at all links and at most two links per lightpath, all lightpaths can be assigned a wavelength without conversion. Moreover, we derive a lower bound on the number of lightpaths to be converted for networks with arbitrary numbers of fibers at the links. A comparison with linear programming lower bounds reveals that the bounds coincide for problems with at most two links per lightpath. For meshed topologies, the cumulative lower bound over all star subnetworks equals the best known solution value for all realistic wavelength assignment instances available, by this proving optimality.
In this paper, we study the minimum converter wavelength assignment problem in optical networks. To benchmark the quality of solutions obtained by heuristics, we derive an integer programming formula tion by generalizing the formulation of Mehrotra and Trick (1996) for the vertex coloring problem. To handle the exponential number of variables, we propose a column generation approach. Computational experiments show that the value of the linear relaxation states a good lower bound and can often prove optimality of the best solution generated heuristically.
Linear Programming Lower Bounds for Minimum Converter Wavelength Assignment in Optical Networks
(2004)
In this paper, we study the conflict-free assignment of wavelengths to lightpaths in an optical network with the opportunity to place wavelength converters. To benchmark heuristics for the problem, we develop integer programming formulations and study their properties. Moreover, we study the computational performance of the column generation algorithm for solving the linear relaxation of the most promising formulation. In many cases, a non-zero lower bound on the number of required converters is generated this way. For several instances, we in fact prove optimality since the lower bound equals the best known solution value.
Signaling is crucial to the operation of modern telecommunication networks. A breakdown in the signaling infrastructure typically causes customer service failures, incurs revenue losses, and hampers the company image. Therefore, the signaling network has to be highest reliability and survivability. This in particular holds for the routers in such a network, called \textit{signaling transfer points\/} (STPs). The robustness of an STP can be improved by equally distributing the load over the internal processing units. Several constraints have to be taken into account. The load of the links connected to a processing unit changes over time introducing an imbalance of the load. In this paper, we show how integer linear programming can be applied to reduce the imbalance within an STP, while keeping the number of changes small. Two alternative models are presented. Computational experiments validate the integer programming approach in practice. The GSM network operator E-Plus saves substantial amounts of time and money by employing the proposed approach.
Chvatal-Gomory cuts are among the most well-known classes of cutting planes for general integer linear programs (ILPs). In case the constraint multipliers are either 0 or $\frac{1}{2}$, such cuts are known as $\{0,\frac{1}{2}\}$-cuts. It has been proven by Caprara and Fischetti (1996) that separation of $\{0,\frac{1}{2}\}$-cuts is NP-hard. In this paper, we study ways to separate $\{0,\frac{1}{2}\}$-cuts effectively in practice. We propose a range of preprocessing rules to reduce the size of the separation problem. The core of the preprocessing builds a Gaussian elimination-like procedure. To separate the most violated $\{0,\frac{1}{2}\}$-cut, we formulate the (reduced) problem as integer linear program. Some simple heuristic separation routines complete the algorithmic framework. Computational experiments on benchmark instances show that the combination of preprocessing with exact and/or heuristic separation is a very vital idea to generate strong generic cutting planes for integer linear programs and to reduce the overall computation times of state-of-the-art ILP-solvers.
This paper deals with MIP-based primal heuristics to be used within a branch-and-cut approach for solving multi-layer telecommunication network design problems. Based on a mixed-integer programming formulation for two network layers, we present three heuristics for solving important subproblems, two of which solve a sub-MIP. On multi-layer planning instances with many parallel logical links, we show the effectiveness of our heuristics in finding good solutions early in the branch-and-cut search tree.