Refine
Document Type
- In Proceedings (5)
- ZIB-Report (5)
- Article (1)
- Book chapter (1)
Language
- English (12)
Is part of the Bibliography
- no (12)
Keywords
Institute
The Dynamic Multi-Period Routing Problem DMPRP introduced by Angelelli et al. gives a model for a two-stage online-offline routing problem. At the beginning of each time period a set of customers becomes known. The customers need to be served either in the current time period or in the following. Postponed customers have to be served in the next time period. The decision whether to postpone a customer has to be done online. At the end of each time period, an optimal tour for the customers assigned to this period has to be computed and this computation can be done offline. The objective of the problem is to minimize the distance traveled over all planning periods assuming optimal routes for the customers selected in each period. We provide the first randomized online algorithms for the DMPRP which beat the known lower bounds for deterministic algorithms. For the special case of two planning periods we provide lower bounds on the competitive ratio of any randomized online algorithm against the oblivious adversary. We identify a randomized algorithm that achieves the optimal competitive ratio of $\frac{1+\sqrt{2}}{2}$ for two time periods on the real line. For three time periods, we give a randomized algorithm that is strictly better than any deterministic algorithm.
In \emph{classical optimization} it is assumed that full information about the problem to be solved is given. This, in particular, includes that all data are at hand. The real world may not be so nice'' to optimizers. Some problem constraints may not be known, the data may be corrupted, or some data may not be available at the moments when decisions have to be made. The last issue is the subject of \emph{online optimization} which will be addressed here. We explain some theory that has been developed to cope with such situations and provide examples from practice where unavailable information is not the result of bad data handling but an inevitable phenomenon.
The task of an elevator control is to schedule the elevators of a group such
that small waiting and travel times for the passengers are obtained. We present an exact
reoptimization algorithm for this problem. A reoptimization algorithm computes a
new schedule for the elevator group each time a new passenger arrives. Our algorithm
uses column generation techniques and is, to the best of our knowledge, the first exact
reoptimization algorithms for a group of passenger elevators. To solve the column
generation problem, we propose a Branch & Bound method.