Overview Statistic: PDF-Downloads (blue) and Frontdoor-Views (gray)
  • Treffer 198 von 210
Zurück zur Trefferliste

Estimating trenching costs in FTTx network planning

Zitieren Sie bitte immer diese URN: urn:nbn:de:0297-zib-14884
  • In this paper we assess to which extent trenching costs of an FTTx network are unavoidable, even if technical side constraints are neglected. For that purpose we present an extended Steiner tree model. Using a variety of realistic problem instances we demonstrate that the total trenching cost can only be reduced by about 5 percent in realistic scenarios. This work has been funded by BMBF (German Federal Ministry of Education and Research) within the program "KMU-innovativ".

Volltext Dateien herunterladen

Metadaten exportieren

Metadaten
Verfasserangaben:Sebastian Orlowski, Axel Werner, Roland Wessäly
Dokumentart:ZIB-Report
Freies Schlagwort / Tag:Optical access networks; Optimization; Steiner trees
MSC-Klassifikation:68-XX COMPUTER SCIENCE (For papers involving machine computations and programs in a specific mathematical area, see Section -04 in that area)
90-XX OPERATIONS RESEARCH, MATHEMATICAL PROGRAMMING
Datum der Erstveröffentlichung:19.03.2012
Schriftenreihe (Bandnummer):ZIB-Report (11-49)
ISSN:1438-0064
Verlagspublikation:Appeared in: Operations Research Proceedings 2011. D. Klatte, H.-J. Lüthi, K. Schmedders (eds.) 2012, pp. 89-94
DOI:https://doi.org/10.1007/978-3-642-29210-1_15
Accept ✔
Diese Webseite verwendet technisch erforderliche Session-Cookies. Durch die weitere Nutzung der Webseite stimmen Sie diesem zu. Unsere Datenschutzerklärung finden Sie hier.