Optimale Blockauswahl bei der Kraftwerkseinsatzplanung
Please always quote using this URN: urn:nbn:de:0297-zib-2144
- The paper addresses the unit commitment problem in power plant operation planning. For a real power system comprising coal and gas fired thermal as well as pumped storage hydro plants a large-scale mixed integer optimization model for unit commitment is developed. Then primal and dual approaches to solving the optimization problem are presented and results of test runs are reported.
Author: | Darinka Dentcheva, Andris Möller, Peter Reeh, Werner Römisch, Rüdiger Schultz, Gert Schwarzbach, Jörg Thomas |
---|---|
Document Type: | ZIB-Report |
Date of first Publication: | 1996/02/01 |
Series (Serial Number): | ZIB-Report (SC-96-03) |
ZIB-Reportnumber: | SC-96-03 |
Published in: | Erschienen in: Mathematik -Schlüsseltechnologie für die Zukunft : Verbundprojekte zwischen Universität und Industrie. K.-H. Hoffmann et al. (eds.) Springer 1997, S. 567-577 |