Overview Statistic: PDF-Downloads (blue) and Frontdoor-Views (gray)
  • search hit 1 of 1
Back to Result List

Workload and busy period for M/GI/1 with a general impatience mechanism

  • The paper deals with the workload and busy period for the M/GI/1 system under FCFS discipline, where the customers may become impatient during their waiting for service with generally distributed maximal waiting times and also during their service with generally distributed maximal service times depending on the time waited for service. This general impatience mechanism, originally introduced by Kovalenko (1961) and considered by Daley (1965), too, covers the special cases of impatience on waiting times as well as impatience on sojourn times, for which Boxma et al. (2010), (2011) gave new results and outlined special cases recently. Our unified approach bases on the vector process of workload and busy time. Explicit representations for the LSTs of workload and busy period are given in case of phase-type distributed impatience.

Export metadata

Additional Services

Share in Twitter Search Google Scholar Statistics - number of accesses to the document
Metadaten
Author:Andreas Brandt, Manfred Brandt
Document Type:Article
Parent Title (English):Queueing Systems
Volume:75
Issue:2-4
First Page:189
Last Page:209
Year of first publication:2013
Preprint:urn:nbn:de:0297-zib-14304
DOI:https://doi.org/10.1007/s11134-013-9373-7
Accept ✔
Diese Webseite verwendet technisch erforderliche Session-Cookies. Durch die weitere Nutzung der Webseite stimmen Sie diesem zu. Unsere Datenschutzerklärung finden Sie hier.