TY - GEN A1 - Euler, Ricardo A1 - Borndörfer, Ralf A1 - Strunk, Timo A1 - Takkula, Tuomo T1 - ULD Build-Up Scheduling with Dynamic Batching in an Air Freight Hub N2 - Air freight is usually shipped in standardized unit load devices (ULDs). The planning process for the consolidation of transit cargo from inbound flights or locally emerging shipments into ULDs for outbound flights is called build-up scheduling. More specifically, outbound ULDs must be assigned a time and a workstation subject to both workstation capacity constraints and the availability of shipments which in turn depends on break-down decisions for incoming ULDs. ULDs scheduled for the same outbound flight should be built up in temporal and spatial proximity. This serves both to minimize overhead in transportation times and to allow workers to move freight between ULDs. We propose to address this requirement by processing ULDs for the same outbound flight in batches. For the above build-up scheduling problem, we introduce a multi-commodity network design model. Outbound flights are modeled as commodities; transit cargo is represented by cargo flow volume and unpack and batch decisions are represented as design variables. The model is solved with standard MIP solvers on a set of benchmark data. For instances with a limited number of resource conflicts, near-optimal solutions are found in under two hours for a whole week of operations. T3 - ZIB-Report - 21-31 KW - Logistics KW - Airline Applications Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-83482 SN - 1438-0064 ER - TY - CHAP A1 - Euler, Ricardo A1 - Borndörfer, Ralf A1 - Puchert, Christian A1 - Takkula, Tuomo T1 - ULD Build-Up Scheduling with Logic-Based Benders Decomposition T2 - Integration of Constraint Programming, Artificial Intelligence, and Operations Research N2 - We study a complex planning and scheduling problem arising from the build-up process of air cargo pallets and containers, collectively referred to as unit load devices (ULD), in which ULDs must be assigned to workstations for loading. Since air freight usually becomes available gradually along the planning horizon, ULD build-ups must be scheduled neither too early to avoid underutilizing ULD capacity, nor too late to avoid resource conflicts with other flights. Whenever possible, ULDs should be built up in batches, thereby giving ground handlers more freedom to rearrange cargo and utilize the ULD's capacity efficiently. The resulting scheduling problem has an intricate cost function and produces large time-expanded models, especially for longer planning horizons. We propose a logic-based Benders decomposition approach that assigns batches to time intervals and workstations in the master problem, while the actual schedule is decided in a subproblem. By choosing appropriate intervals, the subproblem becomes a feasibility problem that decomposes over the workstations. Additionally, the similarity of many batches is exploited by a strengthening procedure for no-good cuts. We benchmark our approach against a time-expanded MIP formulation from the literature on a publicly available data set. It solves 15% more instances to optimality and decreases run times by more than 50% in the geometric mean. This improvement is especially pronounced for longer planning horizons of up to one week, where the Benders approach solves over 50% instances more than the baseline Y1 - 2024 U6 - https://doi.org/10.1007/978-3-031-60597-0_17 VL - 14742 SP - 259 EP - 276 ER - TY - JOUR A1 - Euler, Ricardo A1 - Maristany de las Casas, Pedro T1 - Labeling methods for partially ordered paths JF - European Journal of Operational Research N2 - The landscape of applications and subroutines relying on shortest path computations continues to grow steadily. This growth is driven by the undeniable success of shortest path algorithms in theory and practice. It also introduces new challenges as the models and assessing the optimality of paths become more complicated. Hence, multiple recent publications in the field adapt existing labeling methods in an ad hoc fashion to their specific problem variant without considering the underlying general structure: they always deal with multi-criteria scenarios, and those criteria define different partial orders on the paths. In this paper, we introduce the partial order shortest path problem (POSP), a generalization of the multi-objective shortest path problem (MOSP) and in turn also of the classical shortest path problem. POSP captures the particular structure of many shortest path applications as special cases. In this generality, we study optimality conditions or the lack of them, depending on the objective functions’ properties. Our final contribution is a big lookup table summarizing our findings and providing the reader with an easy way to choose among the most recent multi-criteria shortest path algorithms depending on their problems’ weight structure. Examples range from time-dependent shortest path and bottleneck path problems to the electric vehicle shortest path problem with recharging and complex financial weight functions studied in the public transportation community. Our results hold for general digraphs and, therefore, surpass previous generalizations that were limited to acyclic graphs. Y1 - 2024 U6 - https://doi.org/10.1016/j.ejor.2024.05.002 VL - 318 IS - 1 SP - 19 EP - 30 PB - Elsevier BV ET - 1 ER - TY - CHAP A1 - Euler, Ricardo A1 - Borndörfer, Ralf A1 - Strunk, Timo A1 - Takkula, Tuomo T1 - ULD Build-Up Scheduling with Dynamic Batching in an Air Freight Hub T2 - Operations Research Proceedings 2021 N2 - Air freight is usually shipped in standardized unit load devices (ULDs). The planning process for the consolidation of transit cargo from inbound flights or locally emerging shipments into ULDs for outbound flights is called build-up scheduling. More specifically, outbound ULDs must be assigned a time and a workstation subject to both workstation capacity constraints and the availability of shipments which in turn depends on break-down decisions for incoming ULDs. ULDs scheduled for the same outbound flight should be built up in temporal and spatial proximity. This serves both to minimize overhead in transportation times and to allow workers to move freight between ULDs. We propose to address this requirement by processing ULDs for the same outbound flight in batches. For the above build-up scheduling problem, we introduce a multi-commodity network design model. Outbound flights are modeled as commodities; transit cargo is represented by cargo flow volume and unpack and batch decisions are represented as design variables. The model is solved with a standard MIP solver on a set of benchmark data. For instances with a limited number of resource conflicts, near-optimal solutions are found in under two hours for a whole week of operations. Y1 - 2022 U6 - https://doi.org/10.1007/978-3-031-08623-6_38 SP - 254 EP - 260 ER -