TY - JOUR A1 - Raharinirina, Alexia N. A1 - Peppert, Felix A1 - von Kleist, Max A1 - Schütte, Christof A1 - Sunkara, Vikram T1 - Inferring gene regulatory networks from single-cell RNA-seq temporal snapshot data requires higher-order moments JF - Patterns N2 - Single-cell RNA sequencing (scRNA-seq) has become ubiquitous in biology. Recently, there has been a push for using scRNA-seq snapshot data to infer the underlying gene regulatory networks (GRNs) steering cellular function. To date, this aspiration remains unrealized due to technical and computational challenges. In this work we focus on the latter, which is under-represented in the literature. We took a systemic approach by subdividing the GRN inference into three fundamental components: data pre-processing, feature extraction, and inference. We observed that the regulatory signature is captured in the statistical moments of scRNA-seq data and requires computationally intensive minimization solvers to extract it. Furthermore, current data pre-processing might not conserve these statistical moments. Although our moment-based approach is a didactic tool for understanding the different compartments of GRN inference, this line of thinking—finding computationally feasible multi-dimensional statistics of data—is imperative for designing GRN inference methods. Y1 - 2021 U6 - https://doi.org/10.1016/j.patter.2021.100332 VL - 2 IS - 9 ER - TY - JOUR A1 - Sahin, Guvenc A1 - Ahmadi, Amin A1 - Borndörfer, Ralf A1 - Schlechte, Thomas T1 - Multi-period line planning with resource transfers JF - Transportation Research Part C: Emerging Technologies N2 - Urban transportation systems are subject to a high level of variation and fluctuation in demand over the day. When this variation and fluctuation are observed in both time and space, it is crucial to develop line plans that are responsive to demand. A multi-period line planning approach that considers a changing demand during the planning horizon is proposed. If such systems are also subject to limitations of resources, a dynamic transfer of resources from one line to another throughout the planning horizon should also be considered. A mathematical modelling framework is developed to solve the line planning problem with a cost-oriented approach considering transfer of resources during a finite length planning horizon of multiple periods. We use real-life public transportation network data for our computational results. We analyze whether or not multi-period solutions outperform single period solutions in terms of feasibility and relevant costs. The importance of demand variation on multi-period solutions is investigated. We evaluate the impact of resource transfer constraints on the effectiveness of solutions. We also study the effect of period lengths along with the problem parameters that are significant for and sensitive to the optimality of solutions. Y1 - 2020 U6 - https://doi.org/10.1016/j.trc.2020.102726 VL - 119 SP - 102726 ER - TY - JOUR A1 - Lindner, Niels A1 - Reisch, Julian T1 - An analysis of the parameterized complexity of periodic timetabling JF - Journal of Scheduling N2 - Public transportation networks are typically operated with a periodic timetable. The periodic event scheduling problem (PESP) is the standard mathematical modeling tool for periodic timetabling. PESP is a computationally very challenging problem: For example, solving the instances of the benchmarking library PESPlib to optimality seems out of reach. Since PESP can be solved in linear time on trees, and the treewidth is a rather small graph parameter in the networks of the PESPlib, it is a natural question to ask whether there are polynomial-time algorithms for input networks of bounded treewidth, or even better, fixed-parameter tractable algorithms. We show that deciding the feasibility of a PESP instance is NP-hard even when the treewidth is 2, the branchwidth is 2, or the carvingwidth is 3. Analogous results hold for the optimization of reduced PESP instances, where the feasibility problem is trivial. Moreover, we show W[1]-hardness of the general feasibility problem with respect to treewidth, which means that we can most likely only accomplish pseudo-polynomial-time algorithms on input networks with bounded tree- or branchwidth. We present two such algorithms based on dynamic programming. We further analyze the parameterized complexity of PESP with bounded cyclomatic number, diameter, or vertex cover number. For event-activity networks with a special—but standard—structure, we give explicit and sharp bounds on the branchwidth in terms of the maximum degree and the carvingwidth of an underlying line network. Finally, we investigate several parameters on the smallest instance of the benchmarking library PESPlib. Y1 - 2022 U6 - https://doi.org/10.1007/s10951-021-00719-1 VL - 25 SP - 157 EP - 176 ER -