TY - GEN A1 - Borndörfer, Ralf A1 - Reuther, Markus A1 - Schlechte, Thomas A1 - Weider, Steffen T1 - A Hypergraph Model for Railway Vehicle Rotation Planning N2 - We propose a model for the integrated optimization of vehicle rotations and vehicle compositions in long distance railway passenger transport. The main contribution of the paper is a hypergraph model that is able to handle the challenging technical requirements as well as very general stipulations with respect to the ``regularity'' of a schedule. The hypergraph model directly generalizes network flow models, replacing arcs with hyperarcs. Although NP-hard in general, the model is computationally well-behaved in practice. High quality solutions can be produced in reasonable time using high performance Integer Programming techniques, in particular, column generation and rapid branching. We show that, in this way, large-scale real world instances of our cooperation partner DB Fernverkehr can be solved. T3 - ZIB-Report - 11-36 KW - Rolling Stock Planning, Hypergraph Modeling, Integer Programming, Column Generation, Rapid Branching Y1 - 2011 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0030-drops-32746 SN - 1438-0064 ER - TY - GEN A1 - Grimm, Boris A1 - Borndörfer, Ralf A1 - Schulz, Christof A1 - Weider, Steffen T1 - The Rolling Stock Rotation Planning Problem under Revenue Considerations N2 - In many railway undertakings a railway timetable is offered that is valid for a longer period of time. At DB Fernverkehr AG, one of our industrial partners, this results in a summer and a winter timetable. For both of these timetables rotation plans, i.e., a detailed plan of railway vehicle movements is constructed as a template for this period. Sometimes there are be periods where you know for sure that vehicle capacities are not sufficient to cover all trips of the timetable or to transport all passenger of the trips. Reasons for that could be a heavy increase of passenger flow, a heavy decrease of vehicle availability, impacts from nature, or even strikes of some employees. In such events the rolling stock rotations have to be adapted. Optimization methods are particularly valuable in such situations in order to maintain a best possible level of service or to maximize the expected revenue using the resources that are still available. In most cases found in the literature, a rescheduling based on a timetable update is done, followed by the construction of new rotations that reward the recovery of parts of the obsolete rotations. We consider a different, novel, and more integrated approach. The idea is to guide the cancellation of the trips or reconfiguration of the vehicle composition used to operate a trip of the timetable by the rotation planning process, which is based on the mixed integer programming approach presented in Reuther (2017). The goal is to minimize the operating costs while cancelling or operating a trip with an insufficient vehicle configuration in sense of passenger capacities inflicts opportunity costs and loss of revenue, which are based on an estimation of the expected number of passengers. The performance of the algorithms presented in two case studies, including real world scenarios from DB Fernverkehr AG and a railway operator in North America. T3 - ZIB-Report - 19-01 Y1 - 2019 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-71339 SN - 1438-0064 ER - TY - CHAP A1 - Grimm, Boris A1 - Borndörfer, Ralf A1 - Schulz, Christof A1 - Weider, Steffen T1 - The Rolling Stock Rotation Planning Problem under Revenue Considerations T2 - Proceedings of the Rail Transport Demand Management Conference N2 - In many railway undertakings a railway timetable is offered that is valid for a longer period of time. At DB Fernverkehr AG, one of our industrial partners, this results in a summer and a winter timetable. For both of these timetables rotation plans, i.e., a detailed plan of railway vehicle movements is constructed as a template for this period. Sometimes there are be periods where you know for sure that vehicle capacities are not sufficient to cover all trips of the timetable or to transport all passenger of the trips. Reasons for that could be a heavy increase of passenger flow, a heavy decrease of vehicle availability, impacts from nature, or even strikes of some employees. In such events the rolling stock rotations have to be adapted. Optimization methods are particularly valuable in such situations in order to maintain a best possible level of service or to maximize the expected revenue using the resources that are still available. In most cases found in the literature, a rescheduling based on a timetable update is done, followed by the construction of new rotations that reward the recovery of parts of the obsolete rotations. We consider a different, novel, and more integrated approach. The idea is to guide the cancellation of the trips or reconfiguration of the vehicle composition used to operate a trip of the timetable by the rotation planning process, which is based on the mixed integer programming approach presented in Reuther (2017). The goal is to minimize the operating costs while cancelling or operating a trip with an insufficient vehicle configuration in sense of passenger capacities inflicts opportunity costs and loss of revenue, which are based on an estimation of the expected number of passengers. The performance of the algorithms presented in two case studies, including real world scenarios from DB Fernverkehr AG and a railway operator in North America. Y1 - 2018 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Löbel, Andreas A1 - Weider, Steffen T1 - A Bundle Method for Integrated Multi-Depot Vehicle and Duty Scheduling in Public Transit N2 - This article proposes a Lagrangean relaxation approach to solve integrated duty and vehicle scheduling problems arising in public transport. The approach is based on the proximal bundle method for the solution of concave decomposable functions, which is adapted for the approximate evaluation of the vehicle and duty scheduling components. The primal and dual information generated by the bundle method is used to guide a branch-and-bound type algorithm. Computational results for large-scale real-world integrated vehicle and duty scheduling problems with up to 1,500 timetabled trips are reported. Compared with the results of a classical sequential approach and with reference solutions, integrated scheduling offers remarkable potentials in savings and drivers' satisfaction. T3 - ZIB-Report - 04-14 KW - vehicle scheduling KW - crew scheduling KW - integrated scheduling KW - public transit KW - bundle method Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-7898 ER - TY - GEN A1 - Krumke, Sven A1 - Rambau, Jörg A1 - Weider, Steffen T1 - An Approximation Algorithm for the Non-Preemptive Capacitated Dial-a-Ride Problem N2 - In the Capacitated Dial-a-Ride Problem (CDARP) we are given a transportation network and a finite set of transportation jobs. Each job specifies the source and target location which are both part of the network. A server which can carry at most $C$~objects at a time can move on the transportation network in order to process the transportation requests. The problem CDARP consists of finding a shortest transportation for the jobs starting and ending at a designated start location. In this paper we are concerned with the restriction of CDARP to graphs which are simple paths. This setting arises for instance when modelling applications in elevator transportation systems. It is known that even for this restricted class of graphs CDARP is NP-hard to solve. We provide a polynomial time approximation algorithm that finds a transportion of length at most thrice the length of the optimal transportation. T3 - ZIB-Report - 00-53 KW - NP-completeness KW - polynomial-time approximation algorithms KW - stacker-crane problem KW - vehicle Y1 - 2000 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-6217 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Löbel, Andreas A1 - Weider, Steffen T1 - Integrierte Umlauf- und Dienstplanung im Öffentlichen Nahverkehr N2 - Wir beschreiben einen Ansatz zur integrierten Umlauf- und Dienstplanung im öffentlichen Nahverkehr. Der Ansatz zielt auf die Verbesserung des Gesamtwirkungsgrades dieser beiden Planungsschritte und auf die besondere Planungsproblematik im Regionalverkehr. Wir entwickeln dazu mathematische Optimierungstechniken für den Einsatz in den Planungssystemen MICROBUS II und DIVA. T3 - ZIB-Report - 02-10 KW - Integrierte Umlauf- und Dienstplanung KW - Umlaufplanung KW - Dienstplanung KW - Optimierung KW - Regionalverkehr Y1 - 2002 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-6773 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Schelten, Uwe A1 - Schlechte, Thomas A1 - Weider, Steffen T1 - A Column Generation Approach to Airline Crew Scheduling N2 - The airline crew scheduling problem deals with the construction of crew rotations in order to cover the flights of a given schedule at minimum cost. The problem involves complex rules for the legality and costs of individual pairings and base constraints for the availability of crews at home bases. A typical instance considers a planning horizon of one month and several thousand flights. We propose a column generation approach for solving airline crew scheduling problems that is based on a set partitioning model. We discuss algorithmic aspects such as the use of bundle techniques for the fast, approximate solution of linear programs, a pairing generator that combines Lagrangean shortest path and callback techniques, and a novel rapid branching'' IP heuristic. Computational results for a number of industrial instances are reported. Our approach has been implemented within the commercial crew scheduling system NetLine/Crew of Lufthansa Systems Berlin GmbH. T3 - ZIB-Report - 05-37 KW - Integer Programming KW - Airline Crew Scheduling KW - Branch and Generate Y1 - 2005 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-8713 ER - TY - GEN A1 - Reuther, Markus A1 - Borndörfer, Ralf A1 - Schlechte, Thomas A1 - Weider, Steffen T1 - Integrated Optimization of Rolling Stock Rotations for Intercity Railways N2 - This paper provides a highly integrated solution approach for rolling stock planning problems in the context of intercity passenger traffic. The main contributions are a generic hypergraph based mixed integer programming model and an integrated algorithm for the considered rolling stock rotation planning problem. The new developed approach is able to handle a very large set of industrial railway requirements, such as vehicle composition, maintenance constraints, infrastructure capacity, and regularity aspects. By the integration of this large bundle of technical railway aspects, we show that our approach has the power to produce implementable rolling stock rotations for our industrial cooperation partner DB Fernverkehr. This is the first time that the rolling stock rotations at DB Fernverkehr could be optimized by an automated system utilizing advanced mathematical programming techniques. T3 - ZIB-Report - 12-39 KW - Mixed Integer Programming KW - Railway Optimization KW - Rolling Stock Rostering Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-16424 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Schlechte, Thomas A1 - Weider, Steffen T1 - Railway Track Allocation by Rapid Branching N2 - The track allocation problem, also known as train routing problem or train timetabling problem, is to find a conflict-free set of train routes of maximum value in a railway network. Although it can be modeled as a standard path packing problem, instances of sizes relevant for real-world railway applications could not be solved up to now. We propose a rapid branching column generation approach that integrates the solution of the LP relaxation of a path coupling formulation of the problem with a special rounding heuristic. The approach is based on and exploits special properties of the bundle method for the approximate solution of convex piecewise linear functions. Computational results for difficult instances of the benchmark library TTPLIB are reported. T3 - ZIB-Report - 10-22 KW - Trassenallokationsproblem KW - Ganzzahlige Programmierung KW - Rapid-Branching-Heuristik KW - Proximale Bündelmethode KW - Optimization KW - Railway Track Allocation KW - Bundle Method KW - Rapid Branching Y1 - 2010 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11864 SN - 1438-0064 ER - TY - JOUR A1 - Langenhan, Andreas A1 - Borndörfer, Ralf A1 - Löbel, Andreas A1 - Schulz, Christof A1 - Weider, Steffen ED - Muñoz, J. C. ED - Voß, S. T1 - Duty Scheduling Templates JF - Proceedings of Conference on Advanced Systems for Public Transport 2012 (CASPT12) N2 - We propose duty templates as a novel concept to produce similar duty schedules for similar days of operation in public transit. Duty templates can conveniently handle various types of similarity requirements, and they can be implemented with ease using standard algorithmic techniques. They have produced good results in practice. Y1 - 2012 ER -