TY - GEN A1 - Borndörfer, Ralf A1 - Reuther, Markus A1 - Schlechte, Thomas A1 - Weider, Steffen T1 - A Hypergraph Model for Railway Vehicle Rotation Planning N2 - We propose a model for the integrated optimization of vehicle rotations and vehicle compositions in long distance railway passenger transport. The main contribution of the paper is a hypergraph model that is able to handle the challenging technical requirements as well as very general stipulations with respect to the ``regularity'' of a schedule. The hypergraph model directly generalizes network flow models, replacing arcs with hyperarcs. Although NP-hard in general, the model is computationally well-behaved in practice. High quality solutions can be produced in reasonable time using high performance Integer Programming techniques, in particular, column generation and rapid branching. We show that, in this way, large-scale real world instances of our cooperation partner DB Fernverkehr can be solved. T3 - ZIB-Report - 11-36 KW - Rolling Stock Planning, Hypergraph Modeling, Integer Programming, Column Generation, Rapid Branching Y1 - 2011 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0030-drops-32746 SN - 1438-0064 ER - TY - GEN A1 - Grimm, Boris A1 - Borndörfer, Ralf A1 - Reuther, Markus A1 - Schlechte, Thomas T1 - A Cut Separation Approach for the Rolling Stock Rotation Problem with Vehicle Maintenance T2 - 19th Symposium on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems (ATMOS 2019) N2 - For providing railway services the company’s railway rolling stock is one if not the most important ingredient. It decides about the number of passenger or cargo trips the company can offer, about the quality a passenger experiences the train ride and it is often related to the image of the company itself. Thus, it is highly desired to have the available rolling stock in the best shape possible. Moreover, in many countries, as Germany where our industrial partner DB Fernverkehr AG (DBF) is located, laws enforce regular vehicle inspections to ensure the safety of the passengers. This leads to rolling stock optimization problems with complex rules for vehicle maintenance. This problem is well studied in the literature for example see Maroti and Kroon 2005, or Cordeau et. al. 2001 for applications including vehicle maintenance. The contribution of this paper is a new algorithmic approach to solve the Rolling Stock Rotation Problem for the ICE high speed train fleet of DBF with included vehicle maintenance. It is based on a relaxation of a mixed integer linear programming model with an iterative cut generation to enforce the feasibility of a solution of the relaxation in the solution space of the original problem. The resulting mixed integer linear programming model is based on a hypergraph approach presented in Borndörfer et. al. 2015. The new approach is tested on real world instances modeling different scenarios for the ICE high speed train network in Germany and compared to the approaches of Reuther 2017 that are in operation at DB Fernverkehr AG. The approach shows a significant reduction of the run time to produce solutions with comparable or even better objective function values. T3 - ZIB-Report - 19-61 Y1 - 2020 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-75501 SN - 1438-0064 ER - TY - CHAP A1 - Grimm, Boris A1 - Borndörfer, Ralf A1 - Reuther, Markus A1 - Schlechte, Thomas ED - Cacchiani, Valentina ED - Marchetti-Spaccamela, Alberto T1 - A Cut Separation Approach for the Rolling Stock Rotation Problem with Vehicle Maintenance T2 - 19th Symposium on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems (ATMOS 2019) N2 - For providing railway services the company's railway rolling stock is one if not the most important ingredient. It decides about the number of passenger or cargo trips the company can offer, about the quality a passenger experiences the train ride and it is often related to the image of the company itself. Thus, it is highly desired to have the available rolling stock in the best shape possible. Moreover, in many countries, as Germany where our industrial partner DB Fernverkehr AG (DBF) is located, laws enforce regular vehicle inspections to ensure the safety of the passengers. This leads to rolling stock optimization problems with complex rules for vehicle maintenance. This problem is well studied in the literature for example see [Maróti and Kroon, 2005; Gábor Maróti and Leo G. Kroon, 2007], or [Cordeau et al., 2001] for applications including vehicle maintenance. The contribution of this paper is a new algorithmic approach to solve the Rolling Stock Rotation Problem for the ICE high speed train fleet of DBF with included vehicle maintenance. It is based on a relaxation of a mixed integer linear programming model with an iterative cut generation to enforce the feasibility of a solution of the relaxation in the solution space of the original problem. The resulting mixed integer linear programming model is based on a hypergraph approach presented in [Ralf Borndörfer et al., 2015]. The new approach is tested on real world instances modeling different scenarios for the ICE high speed train network in Germany and compared to the approaches of [Reuther, 2017] that are in operation at DB Fernverkehr AG. The approach shows a significant reduction of the run time to produce solutions with comparable or even better objective function values. Y1 - 2019 UR - https://drops.dagstuhl.de/opus/volltexte/2019/11413/ U6 - https://doi.org/10.4230/OASIcs.ATMOS.2019.1 VL - 75 SP - 1:1 EP - 1:12 PB - Schloss Dagstuhl--Leibniz-Zentrum fuer Informatik CY - Dagstuhl, Germany ER - TY - CHAP A1 - Borndörfer, Ralf A1 - Karbstein, Marika A1 - Mehrgahrdt, Julika A1 - Reuther, Markus A1 - Schlechte, Thomas T1 - The Cycle Embedding Problem T2 - Operations Research Proceedings 2014 N2 - Given two hypergraphs, representing a fine and a coarse "layer", and a cycle cover of the nodes of the coarse layer, the cycle embedding problem (CEP) asks for an embedding of the coarse cycles into the fine layer. The CEP is NP-hard for general hypergraphs, but it can be solved in polynomial time for graphs. We propose an integer rogramming formulation for the CEP that provides a complete escription of the CEP polytope for the graphical case. The CEP comes up in railway vehicle rotation scheduling. We present computational results for problem instances of DB Fernverkehr AG that justify a sequential coarse-first-fine-second planning approach. Y1 - 2016 U6 - https://doi.org/10.1007/978-3-319-28697-6_65 SP - 465 EP - 472 ER - TY - CHAP A1 - Renken, Malte A1 - Ahmadi, Amin A1 - Borndörfer, Ralf A1 - Sahin, Guvenc A1 - Schlechte, Thomas T1 - Demand-Driven Line Planning with Selfish Routing T2 - Operations Research Proceedings 2017 N2 - Bus rapid transit systems in developing and newly industrialized countries are often operated at the limits of passenger capacity. In particular, demand during morning and afternoon peaks is hardly or even not covered with available line plans. In order to develop demand-driven line plans, we use two mathematical models in the form of integer programming problem formulations. While the actual demand data is specified with origin-destination pairs, the arc-based model considers the demand over the arcs derived from the origin-destination demand. In order to test the accuracy of the models in terms of demand satisfaction, we simulate the optimal solutions and compare number of transfers and travel times. We also question the effect of a selfish route choice behavior which in theory results in a Braess-like paradox by increasing the number of transfers when system capacity is increased with additional lines. Y1 - 2018 U6 - https://doi.org/10.1007/978-3-319-89920-6_91 SP - 687 EP - 692 PB - Springer International Publishing ER - TY - CHAP A1 - Schade, Stanley A1 - Schlechte, Thomas A1 - Witzig, Jakob T1 - Structure-based Decomposition for Pattern-Detection for Railway Timetables T2 - Operations Research Proceedings 2017 N2 - We consider the problem of pattern detection in large scale railway timetables. This problem arises in rolling stock optimization planning in order to identify invariant sections of the timetable for which a cyclic rotation plan is adequate. We propose a dual reduction technique which leads to an decomposition and enumeration method. Computational results for real world instances demonstrate that the method is able to produce optimal solutions as fast as standard MIP solvers. Y1 - 2018 U6 - https://doi.org/10.1007/978-3-319-89920-6_95 SP - 715 EP - 721 PB - Springer International Publishing ER - TY - CHAP A1 - Borndörfer, Ralf A1 - Breuer, Matthias A1 - Grimm, Boris A1 - Reuther, Markus A1 - Schade, Stanley A1 - Schlechte, Thomas T1 - Timetable Sparsification by Rolling Stock Rotation Optimization T2 - Operations Research 2017 N2 - Rolling stock optimization is a task that naturally arises by operating a railway system. It could be seen with different level of details. From a strategic perspective to have a rough plan which types of fleets to be bought to a more operational perspective to decide which coaches have to be maintained first. This paper presents a new approach to deal with rolling stock optimisation in case of a (long term) strike. Instead of constructing a completely new timetable for the strike period, we propose a mixed integer programming model that is able to choose appropriate trips from a given timetable to construct efficient tours of railway vehicles covering an optimized subset of trips, in terms of deadhead kilometers and importance of the trips. The decision which trip is preferred over the other is made by a simple evaluation method that is deduced from the network and trip defining data. Y1 - 2018 U6 - https://doi.org/10.1007/978-3-319-89920-6_96 SP - 723 EP - 728 PB - Springer International Publishing ER - TY - GEN A1 - Borndörfer, Ralf A1 - Schelten, Uwe A1 - Schlechte, Thomas A1 - Weider, Steffen T1 - A Column Generation Approach to Airline Crew Scheduling N2 - The airline crew scheduling problem deals with the construction of crew rotations in order to cover the flights of a given schedule at minimum cost. The problem involves complex rules for the legality and costs of individual pairings and base constraints for the availability of crews at home bases. A typical instance considers a planning horizon of one month and several thousand flights. We propose a column generation approach for solving airline crew scheduling problems that is based on a set partitioning model. We discuss algorithmic aspects such as the use of bundle techniques for the fast, approximate solution of linear programs, a pairing generator that combines Lagrangean shortest path and callback techniques, and a novel rapid branching'' IP heuristic. Computational results for a number of industrial instances are reported. Our approach has been implemented within the commercial crew scheduling system NetLine/Crew of Lufthansa Systems Berlin GmbH. T3 - ZIB-Report - 05-37 KW - Integer Programming KW - Airline Crew Scheduling KW - Branch and Generate Y1 - 2005 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-8713 ER - TY - THES A1 - Schlechte, Thomas T1 - Railway Track Allocation: Models and Algorithms N2 - This thesis is about mathematical optimization for the efficient use of railway infrastructure. We address the optimal allocation of the available railway track capacity - the track allocation problem. This track allocation problem is a major challenge for a railway company, independent of whether a free market, a private monopoly, or a public monopoly is given. Planning and operating railway transportation systems is extremely hard due to the combinatorial complexity of the underlying discrete optimization problems, the technical intricacies, and the immense sizes of the problem instances. Mathematical models and optimization techniques can result in huge gains for both railway customers and operators, e.g., in terms of cost reductions or service quality improvements. We tackle this challenge by developing novel mathematical models and associated innovative algorithmic solution methods for large scale instances. This allows us to produce for the first time reliable solutions for a real world instance, i.e., the Simplon corridor in Switzerland. The opening chapter gives a comprehensive overview on railway planning problems. This provides insights into the regulatory and technical framework, it discusses the interaction of several planning steps, and identifies optimization potentials in railway transportation. The remainder of the thesis is comprised of two major parts. The first part is concerned with modeling railway systems to allow for resource and capacity analysis. Railway capacity has basically two dimensions, a space dimension which are the physical infrastructure elements as well as a time dimension that refers to the train movements, i.e., occupation or blocking times, on the physical infrastructure. Railway safety systems operate on the same principle all over the world. A train has to reserve infrastructure blocks for some time to pass through. Two trains reserving the same block of the infrastructure within the same point in time is called block conflict. Therefore, models for railway capacity involve the definition and calculation of reasonable running and associated reservation and blocking times to allow for a conflict free allocation. In the second and main part of the thesis, the optimal track allocation problem for macroscopic models of the railway system is considered. The literature for related problems is surveyed. A graph-theoretic model for the track allocation problem is developed. In that model optimal track allocations correspond to conflict-free paths in special time-expanded graphs. Furthermore, we made considerable progress on solving track allocation problems by two main features - a novel modeling approach for the macroscopic track allocation problem and algorithmic improvements based on the utilization of the bundle method. Finally, we go back to practice and present in the last chapter several case studies using the tools netcast and tsopt. We provide a computational comparison of our new models and standard packing models used in the literature. Our computational experience indicates that our approach, i.e., ``configuration models'', outperforms other models. Moreover, the rapid branching heuristic and the bundle method enable us to produce high quality solutions for very large scale instances, which has not been possible before. In addition, we present results for a theoretical and rather visionary auction framework for track allocation. We discuss several auction design questions and analyze experiments of various auction simulations. The highlights are results for the Simplon corridor in Switzerland. We optimized the train traffic through this tunnel using our models and software tools. To the best knowledge of the author and confirmed by several railway practitioners this was the first time that fully automatically produced track allocations on a macroscopic scale fulfill the requirements of the originating microscopic model, withstand the evaluation in the microscopic simulation tool OpenTrack, and exploit the infrastructure capacity. This documents the success of our approach in practice and the usefulness and applicability of mathematical optimization to railway track allocation. KW - railway track allocation KW - large-scale integer programming KW - network aggregation KW - rapid branching Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:kobv:83-opus-34272 UR - http://opus.kobv.de/tuberlin/volltexte/2012/3427/pdf/schlechte_thomas.pdf SN - 978-3-8381-3222-8 PB - Südwestdeutscher Verlag für Hochschulschriften CY - Saarbrücken, Germany ER - TY - JOUR A1 - Borndörfer, Ralf A1 - Grötschel, Martin A1 - Lukac, Sascha A1 - Mitusch, Kay A1 - Schlechte, Thomas A1 - Schultz, Sören A1 - Tanner, Andreas T1 - An Auctioning Approach to Railway Slot Allocation JF - Competition and Regulation in Network Industries Y1 - 2006 VL - 1 IS - 2 SP - 163 EP - 196 ER - TY - GEN A1 - Ebert, Patricia A1 - Schlechte, Thomas A1 - Schwartz, Stephan T1 - Scheduling for German Road Inspectors N2 - For the yearly over 500,000 vehicle inspections of the German Federal Logistics and Mobility Office (BALM), crew rosters must be scheduled to efficiently achieve Germany's road inspection control targets. For that, we present a model to solve the respective duty scheduling and crew rostering problem in order to obtain duty rosters that comply with numerous legal regulations while maximizing the 'control success' to achieve the control targets. We formulate the Template Assignment Problem, which can be modelled as a large scale mixed-integer linear program. Here, feasible combinations of control topics are assigned to the duties using a hypergraph approach. The model is used in production by BALM, and we prove its effectiveness on a number of real-world instances. T3 - ZIB-Report - 25-13 KW - scheduling KW - rostering KW - mixed-integer linear program KW - crew scheduling KW - hypergraph Y1 - 2025 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-101999 SN - 1438-0064 ER - TY - GEN A1 - Reuther, Markus A1 - Borndörfer, Ralf A1 - Schlechte, Thomas A1 - Weider, Steffen T1 - Integrated Optimization of Rolling Stock Rotations for Intercity Railways N2 - This paper provides a highly integrated solution approach for rolling stock planning problems in the context of intercity passenger traffic. The main contributions are a generic hypergraph based mixed integer programming model and an integrated algorithm for the considered rolling stock rotation planning problem. The new developed approach is able to handle a very large set of industrial railway requirements, such as vehicle composition, maintenance constraints, infrastructure capacity, and regularity aspects. By the integration of this large bundle of technical railway aspects, we show that our approach has the power to produce implementable rolling stock rotations for our industrial cooperation partner DB Fernverkehr. This is the first time that the rolling stock rotations at DB Fernverkehr could be optimized by an automated system utilizing advanced mathematical programming techniques. T3 - ZIB-Report - 12-39 KW - Mixed Integer Programming KW - Railway Optimization KW - Rolling Stock Rostering Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-16424 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Fügenschuh, Armin A1 - Klug, Torsten A1 - Schang, Thilo A1 - Schlechte, Thomas A1 - Schülldorf, Hanno T1 - The Freight Train Routing Problem N2 - We consider the following freight train routing problem (FTRP). Given is a transportation network with fixed routes for passenger trains and a set of freight trains (requests), each defined by an origin and destination station pair. The objective is to calculate a feasible route for each freight train such that a sum of all expected delays and all running times is minimal. Previous research concentrated on microscopic train routings for junctions or inside major stations. Only recently approaches were developed to tackle larger corridors or even networks. We investigate the routing problem from a strategic perspective, calculating the routes in a macroscopic transportation network of Deutsche Bahn AG. Here macroscopic refers to an aggregation of complex real-world structures are into fewer network elements. Moreover, the departure and arrival times of freight trains are approximated. The problem has a strategic character since it asks only for a coarse routing through the network without the precise timings. We give a mixed-integer nonlinear programming~(MINLP) formulation for FTRP, which is a multi-commodity flow model on a time-expanded graph with additional routing constraints. The model's nonlinearities are due to an algebraic approximation of the delays of the trains on the arcs of the network by capacity restraint functions. The MINLP is reduced to a mixed-integer linear model~(MILP) by piecewise linear approximation. The latter is solved by a state of the art MILP solver for various real-world test instances. T3 - ZIB-Report - 13-36 KW - Mixed-Integer Nonlinear Programming KW - multi-commodity flows KW - freight train routing Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-18991 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Denißen, Jonas A1 - Heller, Simon A1 - Klug, Torsten A1 - Küpper, Michael A1 - Lindner, Niels A1 - Reuther, Markus A1 - Schlechte, Thomas A1 - Söhlke, Andreas A1 - Steadman, William T1 - Microscopic Timetable Optimization for a Moving Block System N2 - We present an optimization model which is capable of routing and ordering trains on a microscopic level under a moving block regime. Based on a general timetabling definition (GTTP) that allows the plug in of arbitrarily detailed methods to compute running and headway times, we describe a layered graph approach using velocity expansion, and develop a mixed integer linear programming formulation. Finally, we present promising results for a German corridor scenario with mixed traffic, indicating that applying branch-and-cut to our model is able to solve reasonably sized instances with up to hundred trains to optimality. T3 - ZIB-Report - 21-13 KW - Moving Block KW - Railway Track Allocation KW - Railway Timetabling KW - Train Routing Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-82547 SN - 1438-0064 ER - TY - GEN A1 - Heinz, Stefan A1 - Schlechte, Thomas A1 - Stephan, Rüdiger A1 - Winkler, Michael T1 - Solving steel mill slab design problems N2 - The steel mill slab design problem from the CSPLIB is a combinatorial optimization problem motivated by an application of the steel industry. It has been widely studied in the constraint programming community. Several methods were proposed to solve this problem. A steel mill slab library was created which contains 380 instances. A closely related binpacking problem called the multiple knapsack problem with color constraints, originated from the same industrial problem, was discussed in the integer programming community. In particular, a simple integer program for this problem has been given by Forrest et al. The aim of this paper is to bring these different studies together. Moreover, we adapt the model of Forrest et al. for the steel mill slab design problem. Using this model and a state-of-the-art integer program solver all instances of the steel mill slab library can be solved efficiently to optimality. We improved, thereby, the solution values of 76 instances compared to previous results. Finally, we consider a recently introduced variant of the steel mill slab design problem, where within all solutions which minimize the leftover one is interested in a solution which requires a minimum number of slabs. For that variant we introduce two approaches and solve all instances of the steel mill slab library with this slightly changed objective function to optimality. T3 - ZIB-Report - 11-38 KW - steel mill slab design problem KW - multiple knapsack problem with color constraints KW - integer programming KW - set partitioning KW - binpacking with side constraints Y1 - 2011 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-14089 SN - 1438-0064 ER - TY - GEN A1 - Harrod, Steven A1 - Schlechte, Thomas T1 - A Direct Comparison of Physical Block Occupancy Versus Timed Block Occupancy in Train Timetabling Formulations N2 - Two fundamental mathematical formulations for railway timetabling are compared on a common set of sample problems, representing both multiple track high density services in Europe and single track bidirectional operations in North America. One formulation, ACP, enforces against conflicts by constraining time intervals between trains, while the other formulation, HGF, monitors physical occupation of controlled track segments. The results demonstrate that both ACP and HGF return comparable solutions in the aggregate, with some significant differences in select instances, and a pattern of significant differences in performance and constraint enforcement overall. T3 - ZIB-Report - 13-18 KW - Railway Scheduling KW - Train Timetabling KW - Track Allocation Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-17946 SN - 1438-0064 ER - TY - GEN A1 - Schlechte, Thomas T1 - Railway Track Allocation - Simulation and Optimization N2 - Today the railway timetabling process and the track allocation is one of the most challenging problems to solve by a railway infrastructure provider. Especially due to the deregulation of the transport market in the recent years several suppliers of railway traffic have entered the market. This leads to an increase of slot requests and then it is natural that conflicts occur among them. Furthermore, railway infrastructure networks consist of very expensive assets, even more they are rigid due to the long-term upgrade process. In order to make best use of these valuable infrastructure and to ensure economic operation, efficient planning of the railway operation is indispensable. Mathematical optimization models and algorithmic methodology can help to automatize and tackle these challenges. Our contribution in this paper is to present a renewed planning process due to the liberalization in Europe and a general framework to support the integration of simulation and optimization for railway capacity allocation. T3 - ZIB-Report - 11-32 KW - railway models KW - railway capacity KW - track allocation framework Y1 - 2011 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-13632 SN - 1438-0064 ER - TY - GEN A1 - Raack, Christian A1 - Raymond, Annie A1 - Werner, Axel A1 - Schlechte, Thomas T1 - Integer Programming and Sports Rankings N2 - Sports rankings are obtained by applying a system of rules to evaluate the performance of the participants in a competition. We consider rankings that result from assigning an ordinal rank to each competitor according to their performance. We develop an integer programming model for rankings that allows us to calculate the number of points needed to guarantee a team the ith position, as well as the minimum number of points that could yield the ith place. The model is very general and can thus be applied to many types of sports. We discuss examples coming from football (soccer), ice hockey, and Formula~1. We answer various questions and debunk a few myths along the way. Are 40 points enough to avoid relegation in the Bundesliga? Do 95 points guarantee the participation of a team in the NHL playoffs? Moreover, in the season restructuration currently under consideration in the NHL, will it be easier or harder to access the playoffs? Is it possible to win the Formula~1 World Championship without winning at least one race or without even climbing once on the podium? Finally, we observe that the optimal solutions of the aforementioned model are associated to extreme situations which are unlikely to happen. Thus, to get closer to realistic scenarios, we enhance the model by adding some constraints inferred from the results of the previous years. T3 - ZIB-Report - 13-19 KW - sport ranking KW - integer programming Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-18068 SN - 1438-0064 ER - TY - GEN A1 - Schlechte, Thomas T1 - Railway Track Allocation N2 - This article gives an overview of the results of the author's PhD thesis. The thesis deals with the mathematical optimization for the efficient use of railway infrastructure. We address the optimal allocation of the available railway track capacity - the track allocation problem. This track allocation problem is a major challenge for a railway company, independent of whether a free market, a private monopoly, or a public monopoly is given. Planning and operating railway transportation systems is extremely hard due to the combinatorial complexity of the underlying discrete optimization problems, the technical intricacies, and the immense sizes of the problem instances. Mathematical models and optimization techniques can result in huge gains for both railway customers and operators, e.g., in terms of cost reductions or service quality improvements. We tackle this challenge by developing novel mathematical models and associated innovative algorithmic solution methods for large scale instances. We made considerable progress on solving track allocation problems by two main features - a novel modeling approach for the macroscopic track allocation problem and algorithmic improvements based on the utilization of the bundle method. This allows us to produce for the first time reliable solutions for a real world instance, i.e., the Simplon corridor in Switzerland. T3 - ZIB-Report - 12-38 KW - large-scale integer programming KW - network aggregation KW - configuration models KW - rapid branching Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-16402 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Erol, Berkan A1 - Graffagnino, Thomas A1 - Schlechte, Thomas A1 - Swarat, Elmar T1 - Aggregation Methods for Railway Networks N2 - In this paper a bottom-up approach of automatic simplification of a railway network is presented. Starting from a very detailed, microscopic level, as it is used in railway simulation, the network is transformed by an algorithm to a less detailed level (macroscopic network), that is sufficient for long-term planning and optimization. In addition running and headway times are rounded to a pre-chosen time discretization by a special cumulative method, which we will present and analyse in this paper. After the transformation we fill the network with given train requests to compute an optimal slot allocation. Then the optimized schedule is re-transformed into the microscopic level and can be simulated without any conflicts occuring between the slots. The algorithm is used to transform the network of the very dense Simplon corridor between Swiss and Italy. With our aggregation it is possible for the first time to generate a profit maximal and conflict free timetable for the corridor across a day by a simultaneously optimization run. T3 - ZIB-Report - 10-23 KW - makroskopische Bahnmodellierung KW - Netzwerkaggregation KW - macroscopic railway modeling KW - network aggregation Y1 - 2010 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11881 UR - http://www.sciencedirect.com/science/article/pii/S2210970611000047 SN - 1438-0064 ER -