TY - GEN A1 - Humpola, Jesco A1 - Fügenschuh, Armin A1 - Lehmann, Thomas T1 - A Primal Heuristic for MINLP based on Dual Information N2 - We present a novel heuristic algorithm to identify feasible solutions of a mixed-integer nonlinear programming problem arising in natural gas transportation: the selection of new pipelines to enhance the network's capacity to a desired level in a cost-efficient way. We solve this problem in a linear programming based branch-and-cut approach, where we deal with the nonlinearities by linear outer approximation and spatial branching. At certain nodes of the branching tree, we compute a KKT point for a nonlinear relaxation. Based on the information from the KKT point we alter some of the integer variables in a locally promising way. We describe this heuristic for general MINLPs and then show how to tailor the heuristic to exploit our problem-specific structure. On a test set of real-world instances, we are able to increase the chance of identifying feasible solutions by some order of magnitude compared to standard MINLP heuristics that are already built in the general-purpose MINLP solver SCIP. T3 - ZIB-Report - 13-49 KW - Mixed-Integer Nonlinear Programming KW - Relaxations KW - Heuristics KW - Duality KW - Nonlinear Network Design Applications Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-43110 SN - 1438-0064 ER - TY - JOUR A1 - Humpola, Jesco A1 - Fügenschuh, Armin T1 - Convex reformulations for solving a nonlinear network design problem JF - Computational Optimization and Applications N2 - We consider a nonlinear nonconvex network design problem that arises, for example, in natural gas or water transmission networks. Given is such a network with active and passive components, that is, valves, compressors, control valves (active) and pipelines (passive), and a desired amount of flow at certain specified entry and exit nodes in the network. The active elements are associated with costs when used. Besides flow conservation constraints in the nodes, the flow must fulfill nonlinear nonconvex pressure loss constraints on the arcs subject to potential values (i.e., pressure levels) in both end nodes of each arc. The problem is to compute a cost minimal setting of the active components and numerical values for the flow and node potentials. We examine different (convex) relaxations for a subproblem of the design problem and benefit from them within a branch-and-bound approach. We compare different approaches based on nonlinear optimization numerically on a set of test instances. Y1 - 2015 U6 - https://doi.org/10.1007/s10589-015-9756-2 VL - 62 IS - 3 SP - 717 EP - 759 PB - Springer US ER - TY - JOUR A1 - Humpola, Jesco A1 - Fügenschuh, Armin A1 - Koch, Thorsten T1 - Valid inequalities for the topology optimization problem in gas network design JF - OR Spectrum N2 - One quarter of Europe's energy demand is provided by natural gas distributed through a vast pipeline network covering the whole of Europe. At a cost of 1 million Euro per km extending the European pipeline network is already a multi-billion Euro business. Therefore, automatic planning tools that support the decision process are desired. Unfortunately, current mathematical methods are not capable of solving the arising network design problems due to their size and complexity. In this article, we will show how to apply optimization methods that can converge to a proven global optimal solution. By introducing a new class of valid inequalities that improve the relaxation of our mixed-integer nonlinear programming model, we are able to speed up the necessary computations substantially. Y1 - 2016 U6 - https://doi.org/https://doi.org/10.1007/s00291-015-0390-2 VL - 38 IS - 3 SP - 597 EP - 631 PB - Springer CY - Berlin Heidelberg ER - TY - GEN A1 - Fügenschuh, Armin A1 - Junosza-Szaniawski, Konstanty A1 - Klug, Torsten A1 - Kwasiborski, Slawomir A1 - Schlechte, Thomas T1 - Fastest, average and quantile schedule N2 - We consider problems concerning the scheduling of a set of trains on a single track. For every pair of trains there is a minimum headway, which every train must wait before it enters the track after another train. The speed of each train is also given. Hence for every schedule - a sequence of trains - we may compute the time that is at least needed for all trains to travel along the track in the given order. We give the solution to three problems: the fastest schedule, the average schedule, and the problem of quantile schedules. The last problem is a question about the smallest upper bound on the time of a given fraction of all possible schedules. We show how these problems are related to the travelling salesman problem. We prove NP-completeness of the fastest schedule problem, NP-hardness of quantile of schedules problem, and polynomiality of the average schedule problem. We also describe some algorithms for all three problems. In the solution of the quantile problem we give an algorithm, based on a reverse search method, generating with polynomial delay all Eulerian multigraphs with the given degree sequence and a bound on the number of such multigraphs. A better bound is left as an open question. T3 - ZIB-Report - 14-49 KW - eulerian multigraphs KW - scheduling Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-53592 SN - 1438-0064 ER - TY - GEN A1 - Pfetsch, Marc A1 - Fügenschuh, Armin A1 - Geißler, Björn A1 - Geißler, Nina A1 - Gollmer, Ralf A1 - Hiller, Benjamin A1 - Humpola, Jesco A1 - Koch, Thorsten A1 - Lehmann, Thomas A1 - Martin, Alexander A1 - Morsi, Antonio A1 - Rövekamp, Jessica A1 - Schewe, Lars A1 - Schmidt, Martin A1 - Schultz, Rüdiger A1 - Schwarz, Robert A1 - Schweiger, Jonas A1 - Stangl, Claudia A1 - Steinbach, Marc A1 - Vigerske, Stefan A1 - Willert, Bernhard T1 - Validation of Nominations in Gas Network Optimization: Models, Methods, and Solutions N2 - In this article we investigate methods to solve a fundamental task in gas transportation, namely the validation of nomination problem: Given a gas transmission network consisting of passive pipelines and active, controllable elements and given an amount of gas at every entry and exit point of the network, find operational settings for all active elements such that there exists a network state meeting all physical, technical, and legal constraints. We describe a two-stage approach to solve the resulting complex and numerically difficult mixed-integer non-convex nonlinear feasibility problem. The first phase consists of four distinct algorithms facilitating mixed-integer linear, mixed-integer nonlinear, reduced nonlinear, and complementarity constrained methods to compute possible settings for the discrete decisions. The second phase employs a precise continuous nonlinear programming model of the gas network. Using this setup, we are able to compute high quality solutions to real-world industrial instances whose size is significantly larger than networks that have appeared in the literature previously. T3 - ZIB-Report - 12-41 Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-16531 SN - 1438-0064 ER - TY - CHAP A1 - Klug, Torsten A1 - Junosza-Szaniawski, Konstanty A1 - Kwasiborski, Slawomir A1 - Fügenschuh, Armin A1 - Schlechte, Thomas T1 - Fastest, Average and Quantile Schedule T2 - SOFSEM 2015: Theory and Practice of Computer Science N2 - We consider problems concerning the scheduling of a set of trains on a single track. For every pair of trains there is a minimum headway, which every train must wait before it enters the track after another train. The speed of each train is also given. Hence for every schedule - a sequence of trains - we may compute the time that is at least needed for all trains to travel along the track in the given order. We give the solution to three problems: the fastest schedule, the average schedule, and the problem of quantile schedules. The last problem is a question about the smallest upper bound on the time of a given fraction of all possible schedules. We show how these problems are related to the travelling salesman problem. We prove NP-completeness of the fastest schedule problem, NP-hardness of quantile of schedules problem, and polynomiality of the average schedule problem. We also describe some algorithms for all three problems. In the solution of the quantile problem we give an algorithm, based on a reverse search method, generating with polynomial delay all Eulerian multigraphs with the given degree sequence and a bound on the number of such multigraphs. A better bound is left as an open question. KW - scheduling KW - eulerian multigraphs Y1 - 2015 U6 - https://doi.org/10.1007/978-3-662-46078-8_17 SP - 201 EP - 216 PB - Springer Berlin Heidelberg ER - TY - GEN A1 - Fügenschuh, Armin A1 - Hayn, Christine A1 - Michaels, Dennis T1 - Mixed-Integer Linear Methods for Layout-Optimization of Screening Systems in Recovered Paper Production N2 - The industrial treatment of waste paper in order to regain valuable fibers from which recovered paper can be produced, involves several steps of preparation. One important step is the separation of stickies that are normally attached to the paper. If not properly separated, remaining stickies reduce the quality of the recovered paper or even disrupt the production process. For the mechanical separation process of fibers from stickies a separator screen is used. This machine has one input feed and two output streams, called the accept and the reject. In the accept the fibers are concentrated, whereas the reject has a higher concentration of stickies. The machine can be controlled by setting its reject rate. But even when the reject rate is set properly, after just a single screening step, the accept still has too many stickies, or the reject too many fibers. To get a proper separation, several separators have to be assembled into a network. From a mathematical point of view this problem can be seen as a multi-commodity network flow design problem with a nonlinear, controllable distribution function at each node. We present a nonlinear mixed-integer programming model for the simultaneous selection of a subset of separators, the network's topology, and the optimal setting of each separator. Numerical results are obtained via different types of linearization of the nonlinearities and the use of mixed-integer linear solvers, and compared with state-of-the-art global optimization software. T3 - ZIB-Report - 12-44 KW - Mixed-Integer Linear Programming KW - Nonlinear Programming KW - Piecewise Linear Approximation KW - Topology Optimization KW - Network Design Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-16862 SN - 1438-0064 ER - TY - GEN A1 - Scheumann, Rene A1 - Fügenschuh, Armin A1 - Schenker, Sebastian A1 - Vierhaus, Ingmar A1 - Borndörfer, Ralf A1 - Finkbeiner, Matthias T1 - Global Manufacturing: How to Use Mathematical Optimisation Methods to Transform to Sustainable Value Creation N2 - It is clear that a transformation to sustainable value creation is needed, because business as usual is not an option for preserving competitive advantages of leading industries. What does that mean? This contribution proposes possible approaches for a shift in existing manufacturing paradigms. In a first step, sustainability aspects from the German Sustainability Strategy and from the tools of life cycle sustainability assessment are chosen to match areas of a value creation process. Within these aspects are indicators, which can be measured within a manufacturing process. Once these data are obtained they can be used to set up a mathematical linear pulse model of manufacturing in order to analyse the evolution of the system over time, that is the transition process, by using a system dynamics approach. An increase of technology development by a factor of 2 leads to an increase of manufacturing but also to an increase of climate change. Compensation measures need to be taken. This can be done by e.g. taking money from the GDP (as an indicator of the aspect ``macroeconomic performance''). The value of the arc from that building block towards climate change must then be increased by a factor of 10. The choice of independent and representative indicators or aspects shall be validated and double-checked for their significance with the help of multi-criteria mixed-integer programming optimisation methods. T3 - ZIB-Report - 12-28 KW - Multi-Criteria Optimisation KW - Sustainability Indicator KW - System Dynamics KW - Value Creation Process Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-15703 SN - 1438-0064 ER - TY - GEN A1 - Fügenschuh, Armin A1 - Grösser, Stefan N. A1 - Vierhaus, Ingmar T1 - A Global Approach to the Control of an Industry Structure System Dynamics Model N2 - We consider a system dynamics model that describes the effect of human activity on natural resources. The central stocks are the accumulated profit, the industry structures, and the water resources. The model can be controlled through two time-dependent parameters. The goal in this paper is to find a parameter setting that leads to a maximization of a performance index, which reflects both environmental and economic aspects. Thus, the goal is to identify the most sustainable stock of industry structures within the model's constraints and assumptions. In order to find a proven global optimal parameter set, we formulate the System Dynamics Optimization model as a mixed-integer nonlinear problem that is accessible for numerical solvers. Due to the dynamic structure of the model, certain steps of the solution process must be handled with greater care, compared to standard non-dynamic problems. We describe our approach of solving the industry structure model and present computational results. In addition, we discuss the limitations of the approach and next steps. T3 - ZIB-Report - 13-67 KW - System Dynamics; Mixed-Integer Nonlinear Optimization Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-42932 SN - 1438-0064 ER -