TY - GEN A1 - Borndörfer, Ralf A1 - Karbstein, Marika ED - Delling, Daniel ED - Liberti, Leo T1 - A Direct Connection Approach to Integrated Line Planning and Passenger Routing T2 - ATMOS 2012 - 12th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems N2 - The treatment of transfers is a major challenge in line planning. Existing models either route passengers and lines sequentially, and hence disregard essential degrees of freedom, or they are of extremely large scale, and seem to be computationally intractable. We propose a novel direct connection approach that allows an integrated optimization of line and passenger routing, including accurate estimates of the number of direct travelers, for large-scale real-world instances. T3 - ZIB-Report - 12-29 KW - combinatorial optimization KW - integer programming KW - line planning KW - transfers Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-15812 SN - 1438-0064 VL - 25 SP - 47 EP - 57 PB - Schloss Dagstuhl - Leibniz-Zentrum für Informatik ER - TY - GEN A1 - Borndörfer, Ralf A1 - Neumann, Marika T1 - Models for Line Planning with Transfers N2 - We propose a novel integer programming approach to transfer minimization for line planning problems in public transit. The idea is to incorporate penalties for transfers that are induced by “connection capacities” into the construction of the passenger paths. We show that such penalties can be dealt with by a combination of shortest and constrained shortest path algorithms such that the pricing problem for passenger paths can be solved efficiently. Connection capacity penalties (under)estimate the true transfer times. This error is, however, not a problem in practice. We show in a computational comparison with two standard models on a real-world scenario that our approach can be used to minimize passenger travel and transfer times for large-scale line planning problems with accurate results. T3 - ZIB-Report - 10-11 KW - Linienplanung KW - Umsteigen KW - Ganzzahlige Programmierung KW - Kombinatorische Optimierung KW - line planning KW - transfers KW - integer programming KW - combinatorial optimization Y1 - 2010 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11742 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Grötschel, Martin A1 - Jaeger, Ulrich T1 - Planning Problems in Public Transit N2 - Every day, millions of people are transported by buses, trains, and airplanes in Germany. Public transit (PT) is of major importance for the quality of life of individuals as well as the productivity of entire regions. Quality and efficiency of PT systems depend on the political framework (state-run, market oriented) and the suitability of the infrastructure (railway tracks, airport locations), the existing level of service (timetable, flight schedule), the use of adequate technologies (information, control, and booking systems), and the best possible deployment of equipment and resources (energy, vehicles, crews). The decision, planning, and optimization problems arising in this context are often gigantic and “scream” for mathematical support because of their complexity. This article sketches the state and the relevance of mathematics in planning and operating public transit, describes today’s challenges, and suggests a number of innovative actions. The current contribution of mathematics to public transit is — depending on the transportation mode — of varying depth. Air traffic is already well supported by mathematics. Bus traffic made significant advances in recent years, while rail traffic still bears significant opportunities for improvements. In all areas of public transit, the existing potentials are far from being exhausted. For some PT problems, such as vehicle and crew scheduling in bus and air traffic, excellent mathematical tools are not only available, but used in many places. In other areas, such as rolling stock rostering in rail traffic, the performance of the existing mathematical algorithms is not yet sufficient. Some topics are essentially untouched from a mathematical point of view; e.g., there are (except for air traffic) no network design or fare planning models of practical relevance. PT infrastructure construction is essentially devoid of mathematics, even though enormous capital investments are made in this area. These problems lead to questions that can only be tackled by engineers, economists, politicians, and mathematicians in a joint effort. Among other things, the authors propose to investigate two specific topics, which can be addressed at short notice, are of fundamental importance not only for the area of traffic planning, should lead to a significant improvement in the collaboration of all involved parties, and, if successful, will be of real value for companies and customers: • discrete optimal control: real-time re-planning of traffic systems in case of disruptions, • model integration: service design in bus and rail traffic. Work on these topics in interdisciplinary research projects could be funded by the German ministry of research and education (BMBF), the German ministry of economics (BMWi), or the German science foundation (DFG). T3 - ZIB-Report - 09-13 KW - öffentlicher Verkehr KW - diskrete Optimierung KW - ganzzahlige Programmierung KW - public transit KW - discrete optimization KW - integer programming Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11252 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Cardonha, Carlos T1 - A Set Partitioning Approach to Shunting N2 - The Vehicle Positioning Problem (VPP) is a classical combinatorial optimization problem in public transport planning. A number of models and approaches have been suggested in the literature, which work for small problems, but not for large ones. We propose in this article a novel set partitioning model and an associated column generation solution approach for the VPP. The model provides a tight linear description of the problem. The pricing problem, and hence the LP relaxation itself, can be solved in polynomial resp. pseudo-polynomial time for some versions of the problems. T3 - ZIB-Report - 09-18 KW - integer programming KW - set partitioning KW - combinatorial packing KW - vehicle positioning Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11326 SN - 1438-0064 ER - TY - GEN A1 - Berthold, Timo A1 - Feydy, Thibaut A1 - Stuckey, Peter T1 - Rapid Learning for Binary Programs N2 - Learning during search allows solvers for discrete optimization problems to remember parts of the search that they have already performed and avoid revisiting redundant parts. Learning approaches pioneered by the SAT and CP communities have been successfully incorporated into the SCIP constraint integer programming platform. In this paper we show that performing a heuristic constraint programming search during root node processing of a binary program can rapidly learn useful nogoods, bound changes, primal solutions, and branching statistics that improve the remaining IP search. T3 - ZIB-Report - 10-04 KW - Ganzzahlige Programmierung KW - Constraintprogrammierung KW - Primalheuristik KW - Konfliktanalyse KW - constraint programming KW - integer programming KW - primal heuristic KW - conflict learning Y1 - 2010 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11663 SN - 1438-0064 ER - TY - GEN A1 - Heinz, Stefan A1 - Stephan, Rüdiger A1 - Schlechte, Thomas T1 - Solving Steel Mill Slab Problems with Branch and Price N2 - The steel mill slab design problem from the CSPLib is a binpacking problem that is motivated by an application of the steel industry and that has been widely studied in the constraint programming community. Recently, several people proposed new models and methods to solve this problem. A steel mill slab library was created which contains 380 instances. A closely related binpacking problem called multiple knapsack problem with color constraints, originated from the same industrial problem, were discussed in the integer programming community. In particular, a simple integer programming for this problem has been given by Forrest et al. [3]. The aim of this paper is to bring these different studies together. Moreover, we adopt the model of [3] for the steel mill slab problem. Using a state of the art integer program solver, this model is capable to solve all instances of the steel mill slab library, mostly in less than one second, to optimality. We improved, thereby, the solution value of 76 instances. T3 - ZIB-Report - 09-14 KW - steel mill slab problem KW - branch-and-price KW - integer programming Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11260 SN - 1438-0064 ER - TY - GEN A1 - Torres, Luis Miguel A1 - Torres, Ramiro A1 - Borndörfer, Ralf A1 - Pfetsch, Marc T1 - Line Planning on Paths and Tree Networks with Applications to the Quito Trolebus System (Extended Abstract) N2 - Line planning is an important step in the strategic planning process of a public transportation system. In this paper, we discuss an optimization model for this problem in order to minimize operation costs while guaranteeing a certain level of quality of service, in terms of available transport capacity. We analyze the problem for path and tree network topologies as well as several categories of line operation that are important for the Quito Trolebus system. It turns out that, from a computational complexity worst case point of view, the problem is hard in all but the most simple variants. In practice, however, instances based on real data from the Trolebus System in Quito can be solved quite well, and significant optimization potentials can be demonstrated. T3 - ZIB-Report - 08-53 KW - line planning KW - computational complexity KW - public transport KW - integer programming Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11076 SN - 1438-0064 ER - TY - GEN A1 - Torres, Luis Miguel A1 - Torres, Ramiro A1 - Borndörfer, Ralf A1 - Pfetsch, Marc T1 - Line Planning on Paths and Tree Networks with Applications to the Quito Trolebus System N2 - Line planning is an important step in the strategic planning process of a public transportation system. In this paper, we discuss an optimization model for this problem in order to minimize operation costs while guaranteeing a certain level of quality of service, in terms of available transport capacity. We analyze the problem for path and tree network topologies as well as several categories of line operation that are important for the Quito Trolebus system. It turns out that, from a computational complexity worst case point of view, the problem is hard in all but the most simple variants. In practice, however, instances based on real data from the Trolebus System in Quito can be solved quite well, and significant optimization potentials can be demonstrated. T3 - ZIB-Report - 08-35 KW - line planning KW - computational complexity KW - public transport KW - integer programming Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-10869 SN - 1438-0064 ER - TY - GEN A1 - Ralphs, Ted A1 - Shinano, Yuji A1 - Berthold, Timo A1 - Koch, Thorsten T1 - Parallel Solvers for Mixed Integer Linear Programming N2 - In this article, we introduce parallel mixed integer linear programming (MILP) solvers. MILP solving algorithms have been improved tremendously in the last two decades. Currently, commercial MILP solvers are known as a strong optimization tool. Parallel MILP solver development has started in 1990s. However, since the improvements of solving algorithms have much impact to solve MILP problems than application of parallel computing, there were not many visible successes. With the spread of multi-core CPUs, current state-of-the-art MILP solvers have parallel implementations and researches to apply parallelism in the solving algorithm also getting popular. We summarize current existing parallel MILP solver architectures. T3 - ZIB-Report - 16-74 KW - parallel computing KW - integer programming KW - branch-and-bound KW - supercomputing Y1 - 2016 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-62239 SN - 1438-0064 ER - TY - GEN A1 - Leitner, Markus A1 - Ljubic, Ivana A1 - Sinnl, Markus A1 - Werner, Axel T1 - Two algorithms for solving 3-objective k-ArchConFL and IPs in general N2 - We present two algorithms to solve a 3-objective optimization problem arising in telecommunications access network planning, the k-Architecture Connected Facility Location Problem. The methods can also be used to solve any 3-objective integer linear programming model and can be extended to the multiobjective case. We give some exemplary computations using small and medium-sized instances for our problem. T3 - ZIB-Report - 15-48 KW - multiobjective optimization KW - integer programming KW - telecommunications Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-56259 SN - 1438-0064 ER -