TY - GEN A1 - Koster, Arie M.C.A. A1 - Kutschka, Manuel A1 - Raack, Christian T1 - Robust Network Design: Formulations, Valid Inequalities, and Computations N2 - Traffic in communication networks fluctuates heavily over time. Thus, to avoid capacity bottlenecks, operators highly overestimate the traffic volume during network planning. In this paper we consider telecommunication network design under traffic uncertainty, adapting the robust optimization approach of Bertsimas and Sim [2004]. We present three different mathematical formulations for this problem, provide valid inequalities, study the computational implications, and evaluate the realized robustness. To enhance the performance of the mixed-integer programming solver we derive robust cutset inequalities generalizing their deterministic counterparts. Instead of a single cutset inequality for every network cut, we derive multiple valid inequalities by exploiting the extra variables available in the robust formulations. We show that these inequalities define facets under certain conditions and that they completely describe a projection of the robust cutset polyhedron if the cutset consists of a single edge. For realistic networks and live traffic measurements we compare the formulations and report on the speed up by the valid inequalities. We study the "price of robustness" and evaluate the approach by analyzing the real network load. The results show that the robust optimization approach has the potential to support network planners better than present methods. T3 - ZIB-Report - 11-34 KW - robust network design KW - cutset inequalities Y1 - 2011 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-13890 SN - 1438-0064 ER - TY - GEN A1 - Schweiger, Jonas T1 - Gas network extension planning for multiple demand scenarios N2 - Today's gas markets demand more flexibility from the network operators which in turn have to invest into their network infrastructure. As these investments are very cost-intensive and long-living, network extensions should not only focus on one bottleneck scenario, but should increase the flexibility to fulfill different demand scenarios. We formulate a model for the network extension problem for multiple demand scenarios and propose a scenario decomposition. We solve MINLP single-scenario sub-problems and obtain valid bounds even without solving them to optimality. Heuristics prove capable of improving the initial solutions substantially. Results of computational experiments are presented. T3 - ZIB-Report - 14-29 KW - Gas Network Planning KW - Scenario Decomposition Y1 - 2014 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-51030 SN - 1438-0064 ER -