TY - GEN A1 - Gleixner, Ambros A1 - Bastubbe, Michael A1 - Eifler, Leon A1 - Gally, Tristan A1 - Gamrath, Gerald A1 - Gottwald, Robert Lion A1 - Hendel, Gregor A1 - Hojny, Christopher A1 - Koch, Thorsten A1 - Lübbecke, Marco A1 - Maher, Stephen J. A1 - Miltenberger, Matthias A1 - Müller, Benjamin A1 - Pfetsch, Marc A1 - Puchert, Christian A1 - Rehfeldt, Daniel A1 - Schlösser, Franziska A1 - Schubert, Christoph A1 - Serrano, Felipe A1 - Shinano, Yuji A1 - Viernickel, Jan Merlin A1 - Walter, Matthias A1 - Wegscheider, Fabian A1 - Witt, Jonas T. A1 - Witzig, Jakob T1 - The SCIP Optimization Suite 6.0 N2 - The SCIP Optimization Suite provides a collection of software packages for mathematical optimization centered around the constraint integer programming framework SCIP. This paper discusses enhancements and extensions contained in version 6.0 of the SCIP Optimization Suite. Besides performance improvements of the MIP and MINLP core achieved by new primal heuristics and a new selection criterion for cutting planes, one focus of this release are decomposition algorithms. Both SCIP and the automatic decomposition solver GCG now include advanced functionality for performing Benders’ decomposition in a generic framework. GCG’s detection loop for structured matrices and the coordination of pricing routines for Dantzig-Wolfe decomposition has been significantly revised for greater flexibility. Two SCIP extensions have been added to solve the recursive circle packing problem by a problem-specific column generation scheme and to demonstrate the use of the new Benders’ framework for stochastic capacitated facility location. Last, not least, the report presents updates and additions to the other components and extensions of the SCIP Optimization Suite: the LP solver SoPlex, the modeling language Zimpl, the parallelization framework UG, the Steiner tree solver SCIP-Jack, and the mixed-integer semidefinite programming solver SCIP-SDP. T3 - ZIB-Report - 18-26 KW - constraint integer programming KW - linear programming KW - mixed-integer linear programming KW - mixed-integer nonlinear programming KW - optimization solver KW - branch-and-cut KW - branch-and-price KW - column generation framework KW - parallelization KW - mixed-integer semidefinite programming KW - Steiner tree optimization Y1 - 2018 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-69361 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Lindner, Niels A1 - Roth, Sarah T1 - A Concurrent Approach to the Periodic Event Scheduling Problem N2 - We introduce a concurrent solver for the periodic event scheduling problem (PESP). It combines mixed integer programming techniques, the modulo network simplex method, satisfiability approaches, and a new heuristic based on maximum cuts. Running these components in parallel speeds up the overall solution process. This enables us to significantly improve the current upper and lower bounds for all benchmark instances of the library PESPlib. T3 - ZIB-Report - 19-07 KW - Periodic Event Scheduling Problem KW - Periodic Timetabling KW - Mixed Integer Programming Y1 - 2019 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-71907 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Hoppmann, Heide A1 - Karbstein, Marika A1 - Lindner, Niels T1 - Separation of Cycle Inequalities in Periodic Timetabling N2 - Cycle inequalities play an important role in the polyhedral study of the periodic timetabling problem. We give the first pseudo-polynomial time separation algo- rithm for cycle inequalities, and we give a rigorous proof for the pseudo-polynomial time separability of the change-cycle inequalities. Moreover, we provide several NP-completeness results, indicating that pseudo-polynomial time is best possible. The efficiency of these cutting planes is demonstrated on real-world instances of the periodic timetabling problem. T3 - ZIB-Report - 18-16 KW - Periodic timetabling KW - Cycle inequality KW - Change-cycle inequality Y1 - 2018 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-69746 SN - 1438-0064 ER - TY - GEN A1 - Prause, Felix T1 - A Multi-Swap Heuristic for Rolling Stock Rotation Planning with Predictive Maintenance N2 - We present a heuristic solution approach for the rolling stock rotation problem with predictive maintenance (RSRP-PdM). The task of this problem is to assign a sequence of trips to each of the vehicles and to schedule their maintenance such that all trips can be operated. Here, the health states of the vehicles are considered to be random variables distributed by a family of probability distribution functions, and the maintenance services should be scheduled based on the failure probability of the vehicles. The proposed algorithm first generates a solution by solving an integer linear program and then heuristically improves this solution by applying a local search procedure. For this purpose, the trips assigned to the vehicles are split up and recombined, whereby additional deadhead trips can be inserted between the partial assignments. Subse- quently, the maintenance is scheduled by solving a shortest path problem in a state-expanded version of a space-time graph restricted to the trips of the individual vehicles. The solution approach is tested and evaluated on a set of test instances based on real-world timetables. T3 - ZIB-Report - 23-29 KW - Rolling stock rotation planning KW - Predictive maintenance KW - Heuristic KW - State-expanded graph model KW - Integer linear program Y1 - 2023 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-93133 SN - 1438-0064 ER - TY - GEN A1 - Prause, Felix A1 - Borndörfer, Ralf T1 - Construction of a Test Library for the Rolling Stock Rotation Problem with Predictive Maintenance N2 - We describe the development of a test library for the rolling stock rotation problem with predictive maintenance (RSRP-PdM). Our approach involves the utilization of genuine timetables from a private German railroad company. The generated instances incorporate probability distribution functions for modeling the health states of the vehicles and the considered trips possess varying degradation functions. RSRP-PdM involves assigning trips to a fleet of vehicles and scheduling their maintenance based on their individual health states. The goal is to minimize the total costs consisting of operational costs and the expected costs associated with vehicle failures. The failure probability is dependent on the health states of the vehicles, which are assumed to be random variables distributed by a family of probability distributions. Each distribution is represented by the parameters characterizing it and during the operation of the trips, these parameters get altered. Our approach incorporates non-linear degradation functions to describe the inference of the parameters but also linear ones could be applied. The resulting instances consist of the timetables of the individual lines that use the same vehicle type. Overall, we employ these assumptions and utilize open-source data to create a library of instances with varying difficulty. Our approach is vital for evaluating and comparing algorithms designed to solve the RSRP-PdM. T3 - ZIB-Report - 23-20 KW - Rolling Stock Rotation Planning KW - Predictive Maintenance KW - Test Library Y1 - 2023 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-91734 SN - 1438-0064 ER - TY - JOUR A1 - Euler, Ricardo A1 - Lindner, Niels A1 - Borndörfer, Ralf T1 - Price optimal routing in public transportation JF - EURO Journal on Transportation and Logistics KW - Management Science and Operations Research KW - Transportation KW - Modeling and Simulation Y1 - 2024 U6 - https://doi.org/10.1016/j.ejtl.2024.100128 SN - 2192-4376 VL - 13 SP - 1 EP - 15 PB - Elsevier BV ER - TY - GEN A1 - Prause, Felix A1 - Borndörfer, Ralf A1 - Grimm, Boris A1 - Tesch, Alexander T1 - Approximating the RSRP with Predictive Maintenance N2 - We study the solution of the rolling stock rotation problem with predictive maintenance (RSRP-PM) by an iterative refinement approach that is based on a state-expanded event-graph. In this graph, the states are parameters of a failure distribution, and paths correspond to vehicle rotations with associated health state approximations. An optimal set of paths including maintenance can be computed by solving an integer linear program. Afterwards, the graph is refined and the procedure repeated. An associated linear program gives rise to a lower bound that can be used to determine the solution quality. Computational results for two instances derived from real world timetables of a German railway company are presented. The results show the effectiveness of the approach and the quality of the solutions. T3 - ZIB-Report - 23-04 KW - Rolling Stock Rotation Planning KW - Predictive Maintenance KW - Integer Linear Programming KW - Heuristic KW - Lower Bound Y1 - 2023 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-89531 SN - 1438-0064 ER - TY - GEN A1 - Petkovic, Milena A1 - Zakiyeva, Nazgul T1 - Mathematical Optimization for Analyzing and Forecasting Nonlinear Network Time Series N2 - This work presents an innovative short to mid-term forecasting model that analyzes nonlinear complex spatial and temporal dynamics in energy networks under demand and supply balance constraints using Network Nonlinear Time Series (TS) and Mathematical Programming (MP) approach. We address three challenges simultaneously, namely, the adjacency matrix is unknown; the total amount in the network has to be balanced; dependence is unnecessarily linear. We use a nonparametric approach to handle the nonlinearity and estimate the adjacency matrix under the sparsity assumption. The estimation is conducted with the Mathematical Optimisation method. We illustrate the accuracy and effectiveness of the model on the example of the natural gas transmission network of one of the largest transmission system operators (TSOs) in Germany, Open Grid Europe. The obtained results show that, especially for shorter forecasting horizons, the proposed method outperforms all considered benchmark models, improving the average nMAPE for 5.1% and average RMSE for 79.6% compared to the second-best model. The model is capable of capturing the nonlinear dependencies in the complex spatial-temporal network dynamics and benefits from both sparsity assumption and the demand and supply balance constraint. T3 - ZIB-Report - 22-19 KW - nonlinear time series KW - mathematical optimization KW - energy networks Y1 - 2022 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-88037 SN - 1438-0064 ER - TY - THES A1 - Pedersen, Jaap T1 - Multiperiod Optimal Power Flow Problem In Distribution System Planning N2 - Growing demand, distributed generation, such as renewable energy sources (RES), and the increasing role of storage systems to mitigate the volatility of RES on a medium voltage level, push existing distribution grids to their limits. Therefore, necessary network expansion needs to be evaluated to guarantee a safe and reliable electricity supply in the future taking these challenges into account. This problem is formulated as an optimal power flow (OPF) problem which combines network expansion, volatile generation and storage systems, minimizing network expansion and generation costs. As storage systems introduce a temporal coupling into the system, a multiperiod OPF problem is needed and analysed in this thesis. To reduce complexity, the network expansion problem is represented in a continuous nonlinear programming formulation by using fundamental properties of electrical engeneering. This formulation is validated succesfully against a common mixed integer programming approach on a 30 and 57 bus network with respect to solution and computing time. As the OPF problem is, in general, a nonconvex, nonlinear problem and, thus, hard to solve, convex relaxations of the power flow equations have gained increasing interest. Sufficient conditions are represented which guarantee exactness of a second-order cone (SOC) relaxation of an operational OPF in radial networks. In this thesis, these conditions are enhanced for the network expansion planning problem. Additionally, nonconvexities introduced by the choice of network expansion variables are relaxed by using McCormick envelopes. These relaxations are then applied on the multiperiod OPF and compared to the original problem on a 30 and a 57 bus network. In particular, the computational time is decreased by an order up to 10^2 by the SOC relaxation while it provides either an exact solution or a sufficient lower bound on the original problem. Finally, a sensitivity study is performed on weights of network expansion costs showing strong dependency of both the solution of performed expansion and solution time on the chosen weights. KW - multiperiod optimal power flow, distribution network planning, battery storage Y1 - 2020 ER - TY - GEN A1 - Fujii, Koichi A1 - Kim, Sunyoung A1 - Kojima, Masakazu A1 - Mittelmann, Hans D. A1 - Shinano, Yuji T1 - An Exceptionally Difficult Binary Quadratic Optimization Problem with Symmetry: a Challenge for The Largest Unsolved QAP Instance Tai256c N2 - Tai256c is the largest unsolved quadratic assignment problem (QAP) instance in QAPLIB. It is known that QAP tai256c can be converted into a 256 dimensional binary quadratic optimization problem (BQOP) with a single cardinality constraint which requires the sum of the binary variables to be 92. As the BQOP is much simpler than the original QAP, the conversion increases the possibility to solve the QAP. Solving exactly the BQOP, however, is still very difficult. Indeed, a 1.48% gap remains between the best known upper bound (UB) and lower bound (LB) of the unknown optimal value. This paper shows that the BQOP admits a nontrivial symmetry, a property that makes the BQOP very hard to solve. The symmetry induces equivalent subproblems in branch and bound (BB) methods. To effectively improve the LB, we propose an efficient BB method that incorporates a doubly nonnegative relaxation, the standard orbit branching and a technique to prune equivalent subproblems. With this BB method, a new LB with 1.25% gap is successfully obtained, and computing an LB with 1.0% gap is shown to be still quite difficult. T3 - ZIB-Report - 23-27 Y1 - 2023 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-93072 SN - 1438-0064 ER - TY - GEN A1 - Lindner, Niels A1 - Masing, Berenike T1 - SAT-Generated Initial Solutions for Integrated Line Planning and Turn-Sensitive Periodic Timetabling with Track Choice N2 - Periodic timetabling is a challenging planning task in public transport. As safety requirements are crucial, track allocation is indispensable for validating the practical feasibility of a railway timetable. For busy stations with limited capacities, this requires a detailed planning of turnarounds. It is therefore desirable to integrate timetabling not only with track allocation, but also with vehicle scheduling and line planning. This is captured by the Integrated Line Planning and Turn-Sensitive Periodic Timetabling Problem with Track Choice, whose MIP formulation has been demonstrated to be effective for construction site railway rescheduling, as long as a good quality initial solution is available. In this paper, we discuss how to generate such a solution by extending the SAT formulation of the Periodic Event Scheduling Problem with track choice, track occupation, and minimum service frequency components. The SAT approach is superior to pure MIP on real-world instances of the S-Bahn Berlin network. T3 - ZIB-Report - 24-01 KW - Periodic Timetabling KW - Railway Timetabling KW - Railway Track Allocation KW - Boolean Satisfiability Problem KW - Rescheduling KW - Line Planning Y1 - 2024 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-94644 SN - 1438-0064 ER -