TY - GEN A1 - Renken, Malte A1 - Ahmadi, Amin A1 - Borndörfer, Ralf A1 - Sahin, Guvenc A1 - Schlechte, Thomas T1 - Demand-Driven Line Planning with Selfish Routing N2 - Bus rapid transit systems in developing and newly industrialized countries are often operated at the limits of passenger capacity. In particular, demand during morning and afternoon peaks is hardly or even not covered with available line plans. In order to develop demand-driven line plans, we use two mathematical models in the form of integer programming problem formulations. While the actual demand data is specified with origin-destination pairs, the arc-based model considers the demand over the arcs derived from the origin-destination demand. In order to test the accuracy of the models in terms of demand satisfaction, we simulate the optimal solutions and compare number of transfers and travel times. We also question the effect of a selfish route choice behavior which in theory results in a Braess-like paradox by increasing the number of transfers when system capacity is increased with additional lines. T3 - ZIB-Report - 17-38 Y1 - 2017 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-64547 SN - 1438-0064 ER - TY - GEN A1 - Blanco, Marco A1 - Borndörfer, Ralf A1 - Hoang, Nam-Dung A1 - Kaier, Anton A1 - Maristany de las Casas, Pedro A1 - Schlechte, Thomas A1 - Schlobach, Swen T1 - Cost Projection Methods for the Shortest Path Problem with Crossing Costs N2 - Real world routing problems, e.g., in the airline industry or in public and rail transit, can feature complex non-linear cost functions. An important case are costs for crossing regions, such as countries or fare zones. We introduce the shortest path problem with crossing costs (SPPCC) to address such situations; it generalizes the classical shortest path problem and variants such as the resource constrained shortest path problem and the minimum label path problem. Motivated by an application in flight trajectory optimization with overflight costs, we focus on the case in which the crossing costs of a region depend only on the nodes used to enter or exit it. We propose an exact Two-Layer-Dijkstra Algorithm as well as a novel cost-projection linearization technique that approximates crossing costs by shadow costs on individual arcs, thus reducing the SPPCC to a standard shortest path problem. We evaluate all algorithms’ performance on real-world flight trajectory optimization instances, obtaining very good à posteriori error bounds. T3 - ZIB-Report - 17-48 Y1 - 2017 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-64817 SN - 1438-0064 ER - TY - CHAP A1 - Grimm, Boris A1 - Borndörfer, Ralf A1 - Reuther, Markus A1 - Schade, Stanley A1 - Schlechte, Thomas T1 - A Propagation Approach to Acyclic Rolling Stock Rotation Optimization T2 - Proceedings of the IAROR conference RailLille N2 - The rolling stock, i.e., railway vehicles, are one of the key ingredients of a running railway system. As it is well known, the offer of a railway company to their customers, i.e., the railway timetable, changes from time to time. Typical reasons for that are different timetables associated with different seasons, maintenance periods or holidays. Therefore, the regular lifetime of a timetable is split into (more or less) irregular periods where parts of the timetable are changed. In order to operate a railway timetable most railway companies set up sequences that define the operation of timetabled trips by a single physical railway vehicle called (rolling stock) rotations. Not surprisingly, the individual parts of a timetable also affect the rotations. More precisely, each of the parts brings up an acyclic rolling stock rotation problem with start and end conditions associated with the beginning and ending of the corresponding period. In this paper, we propose a propagation approach to deal with large planning horizons that are composed of many timetables with shorter individual lifetimes. The approach is based on an integer linear programming formulation that propagates rolling stock rotations through the irregular parts of the timetable while taking a large variety of operational requirements into account. This approach is implemented within the rolling stock rotation optimization framework ROTOR used by DB Fernverkehr AG, one of the leading railway operators in Europe. Computational results for real world scenarios are presented to evaluate the approach. Y1 - 2017 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Breuer, Matthias A1 - Grimm, Boris A1 - Reuther, Markus A1 - Schade, Stanley A1 - Schlechte, Thomas T1 - Timetable Sparsification by Rolling Stock Rotation Optimization N2 - Rolling stock optimization is a task that naturally arises by operating a railway system. It could be seen with different level of details. From a strategic perspective to have a rough plan which types of fleets to be bought to a more operational perspective to decide which coaches have to be maintained first. This paper presents a new approach to deal with rolling stock optimisation in case of a (long term) strike. Instead of constructing a completely new timetable for the strike period, we propose a mixed integer programming model that is able to choose appropriate trips from a given timetable to construct efficient tours of railway vehicles covering an optimized subset of trips, in terms of deadhead kilometers and importance of the trips. The decision which trip is preferred over the other is made by a simple evaluation method that is deduced from the network and trip defining data. T3 - ZIB-Report - 17-63 Y1 - 2017 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-65948 SN - 1438-0064 ER - TY - GEN A1 - Schade, Stanley A1 - Borndörfer, Ralf A1 - Breuer, Matthias A1 - Grimm, Boris A1 - Reuther, Markus A1 - Schlechte, Thomas A1 - Siebeneicher, Patrick T1 - Pattern Detection For Large-Scale Railway Timetables N2 - We consider railway timetables of our industrial partner DB Fernverkehr AG that operates the ICE high speed trains in the long-distance passenger railway network of Germany. Such a timetable covers a whole year with 364 days and, typically, includes more than 45,000 trips. A rolling stock rotation plan is not created for the whole timetable at once. Instead the timetable is divided into regular invariant sections and irregular deviations (e.g. for public holidays). A separate rotation plan with a weekly period can then be provided for each of the different sections of the timetable. We present an algorithmic approach to automatically recognize these sections. Together with the supplementing visualisation of the timetable this method has shown to be very relevant for our industrial partner. T3 - ZIB-Report - 17-17 KW - railway timetables KW - visualization KW - pattern detection Y1 - 2017 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-63390 SN - 1438-0064 ER - TY - GEN A1 - Gilg, Brady A1 - Klug, Torsten A1 - Martienssen, Rosemarie A1 - Paat, Joseph A1 - Schlechte, Thomas A1 - Schulz, Christof A1 - Seymen, Sinan A1 - Tesch, Alexander T1 - Conflict-Free Railway Track Assignment at Depots N2 - Managing rolling stock with no passengers aboard is a critical component of railway operations. In particular, one problem is to park the rolling stock on a given set of tracks at the end of a day or service. Depending on the parking assignment, shunting may be required in order for a parked train to depart or for an incoming train to park. Given a collection of tracks M and a collection of trains T with fixed arrival-departure timetable, the train assignment problem (TAP) is to determine the maximum number of trains from T that can be parked on M according to the timetable and without the use of shunting. Hence, efficiently solving the TAP allows to quickly compute feasible parking schedules that do not require further shunting adjustments. In this paper, we present two integer programming models for solving the TAP. To our knowledge, this is the first integrated approach that considers track lengths along with the three most common types of parking tracks. We compare these models on a theoretical level. We also prove that a decision version of the TAP is NP-complete, justifying the use of integer programming techniques. Using stochastic and robust modelling techniques, both models produce parking assignments that are optimized and robust according to random train delays. We conclude with computational results for both models, observing that they perform well on real timetables. T3 - ZIB-Report - 17-23 KW - Depot Planning KW - Railway Track Assignment Y1 - 2017 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-63843 SN - 1438-0064 ER - TY - CHAP A1 - Schade, Stanley A1 - Borndörfer, Ralf A1 - Breuer, Matthias A1 - Grimm, Boris A1 - Reuther, Markus A1 - Schlechte, Thomas A1 - Siebeneicher, Patrick T1 - Pattern Detection For Large-Scale Railway Timetables T2 - Proceedings of the IAROR conference RailLille N2 - We consider railway timetables of our industrial partner DB Fernverkehr AG that operates the ICE high speed trains in the long-distance passenger railway network of Germany. Such a timetable covers a whole year with 364 days and, typically, includes more than 45,000 trips. A rolling stock rotation plan is not created for the whole timetable at once. Instead the timetable is divided into regular invariant sections and irregular deviations (e.g. for public holidays). A separate rotation plan with a weekly period can then be provided for each of the different sections of the timetable. We present an algorithmic approach to automatically recognize these sections. Together with the supplementing visualisation of the timetable this method has shown to be very relevant for our industrial partner. Y1 - 2017 ER - TY - JOUR A1 - Borndörfer, Ralf A1 - Grimm, Boris A1 - Reuther, Markus A1 - Schlechte, Thomas T1 - Template-based Re-optimization of Rolling Stock Rotations JF - Public Transport N2 - Rolling stock, i.e., the set of railway vehicles, is among the most expensive and limited assets of a railway company and must be used efficiently. We consider in this paper the re-optimization problem to recover from unforeseen disruptions. We propose a template concept that allows to recover cost minimal rolling stock rotations from reference rotations under a large variety of operational requirements. To this end, connection templates as well as rotation templates are introduced and their application within a rolling stock rotation planning model is discussed. We present an implementation within the rolling stock rotation optimization framework rotor and computational results for scenarios provided by DB Fernverkehr AG, one of the leading railway operators in Europe. Y1 - 2017 U6 - https://doi.org/10.1007/s12469-017-0152-4 SP - 1 EP - 19 PB - Springer ER -