TY - JOUR A1 - Sahin, Guvenc A1 - Digehsara, Amin Ahmadi A1 - Borndörfer, Ralf T1 - Efficient Algorithms for the Multi-Period Line Planning Problem in Public Transportation JF - Open Access Series in Informatics (OASIcs), 21st Symposium on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems (ATMOS 2021) N2 - In order to plan and schedule a demand-responsive public transportation system, both temporal and spatial changes in demand should be taken into account even at the line planning stage. We study the multi-period line planning problem with integrated decisions regarding dynamic allocation of vehicles among the lines. Given the NP-hard nature of the line planning problem, the multi-period version is clearly difficult to solve for large public transit networks even with advanced solvers. It becomes necessary to develop algorithms that are capable of solving even the very-large instances in reasonable time. For instances which belong to real public transit networks, we present results of a heuristic local branching algorithm and an exact approach based on constraint propagation. Y1 - 2021 U6 - https://doi.org/10.4230/OASIcs.ATMOS.2021.17 VL - 96 SP - 17:1 EP - 17:6 ER - TY - JOUR A1 - Sahin, Guvenc A1 - Ahmadi, Amin A1 - Borndörfer, Ralf A1 - Schlechte, Thomas T1 - Multi-period line planning with resource transfers JF - Transportation Research Part C: Emerging Technologies N2 - Urban transportation systems are subject to a high level of variation and fluctuation in demand over the day. When this variation and fluctuation are observed in both time and space, it is crucial to develop line plans that are responsive to demand. A multi-period line planning approach that considers a changing demand during the planning horizon is proposed. If such systems are also subject to limitations of resources, a dynamic transfer of resources from one line to another throughout the planning horizon should also be considered. A mathematical modelling framework is developed to solve the line planning problem with a cost-oriented approach considering transfer of resources during a finite length planning horizon of multiple periods. We use real-life public transportation network data for our computational results. We analyze whether or not multi-period solutions outperform single period solutions in terms of feasibility and relevant costs. The importance of demand variation on multi-period solutions is investigated. We evaluate the impact of resource transfer constraints on the effectiveness of solutions. We also study the effect of period lengths along with the problem parameters that are significant for and sensitive to the optimality of solutions. Y1 - 2020 U6 - https://doi.org/10.1016/j.trc.2020.102726 VL - 119 SP - 102726 ER -