TY - GEN A1 - Borndörfer, Ralf A1 - Denißen, Jonas A1 - Heller, Simon A1 - Klug, Torsten A1 - Küpper, Michael A1 - Lindner, Niels A1 - Reuther, Markus A1 - Schlechte, Thomas A1 - Söhlke, Andreas A1 - Steadman, William T1 - Microscopic Timetable Optimization for a Moving Block System N2 - We present an optimization model which is capable of routing and ordering trains on a microscopic level under a moving block regime. Based on a general timetabling definition (GTTP) that allows the plug in of arbitrarily detailed methods to compute running and headway times, we describe a layered graph approach using velocity expansion, and develop a mixed integer linear programming formulation. Finally, we present promising results for a German corridor scenario with mixed traffic, indicating that applying branch-and-cut to our model is able to solve reasonably sized instances with up to hundred trains to optimality. T3 - ZIB-Report - 21-13 KW - Moving Block KW - Railway Track Allocation KW - Railway Timetabling KW - Train Routing Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-82547 SN - 1438-0064 ER - TY - JOUR A1 - Borndörfer, Ralf A1 - Eßer, Thomas A1 - Frankenberger, Patrick A1 - Huck, Andreas A1 - Jobmann, Christoph A1 - Krostitz, Boris A1 - Kuchenbecker, Karsten A1 - Moorhagen, Kai A1 - Nagl, Philipp A1 - Peterson, Michael A1 - Reuther, Markus A1 - Schang, Thilo A1 - Schoch, Michael A1 - Schülldorf, Hanno A1 - Schütz, Peter A1 - Therolf, Tobias A1 - Waas, Kerstin A1 - Weider, Steffen T1 - Deutsche Bahn Schedules Train Rotations Using Hypergraph Optimization JF - Informs Journal on Applied Analytics N2 - Deutsche Bahn (DB) operates a large fleet of rolling stock (locomotives, wagons, and train sets) that must be combined into trains to perform rolling stock rotations. This train composition is a special characteristic of railway operations that distinguishes rolling stock rotation planning from the vehicle scheduling problems prevalent in other industries. DB models train compositions using hyperarcs. The resulting hypergraph models are ad-dressed using a novel coarse-to-fine method that implements a hierarchical column genera-tion over three levels of detail. This algorithm is the mathematical core of DB’s fleet em-ployment optimization (FEO) system for rolling stock rotation planning. FEO’s impact within DB’s planning departments has been revolutionary. DB has used it to support the company’s procurements of its newest high-speed passenger train fleet and its intermodal cargo locomotive fleet for cross-border operations. FEO is the key to successful tendering in regional transport and to construction site management in daily operations. DB’s plan-ning departments appreciate FEO’s high-quality results, ability to reoptimize (quickly), and ease of use. Both employees and customers benefit from the increased regularity of operations. DB attributes annual savings of 74 million euro, an annual reduction of 34,000 tons of CO2 emissions, and the elimination of 600 coupling operations in cross-border operations to the implementation of FEO. Y1 - 2021 U6 - https://doi.org/10.1287/inte.2020.1069 VL - 51 IS - 1 SP - 42 EP - 62 ER - TY - CHAP A1 - Gamrath, Gerwin A1 - Reuther, Markus A1 - Schlechte, Thomas A1 - Swarat, Elmar T1 - An LP-based heuristic for Inspector Scheduling T2 - Proceedings of the 13th International Conference on the Practice and Theory of Automated Timetabling - PATAT 2021: Volume I N2 - We present a heuristic based on linear programming (LP) for the integrated tour and crew roster planning of toll enforcement inspectors. Their task is to enforce the proper paying of a distance-based toll on German motorways. This leads to an integrated tour planning and duty rostering problem; it is called Toll Enforcement Problem (TEP). We tackle the TEP by a standard multi-commodity flow model with some extensions in order to incorporate the control tours. The heuristic consists of two variants. The first, called Price & Branch, is a column generation approach to solve the model’s LP relaxation by pricing tour and roster arc variables. Then, we compute an integer feasible solution by restricting to all variables that were priced. The second is a coarse-to-fine approach. Its basic idea is projecting variables to an aggregated variable space, which is much smaller. The aim is to spend as much algorithmic effort in this coarse model as possible. For both heuristic procedures we will show that feasible solutions of high quality can be computed even for large scale industrial instances. Y1 - 2021 UR - https://patatconference.org/patat2020/proceedings/ VL - 1 SP - 77 EP - 86 ER -