TY - CHAP A1 - Klug, Torsten A1 - Junosza-Szaniawski, Konstanty A1 - Kwasiborski, Slawomir A1 - Fügenschuh, Armin A1 - Schlechte, Thomas T1 - Fastest, Average and Quantile Schedule T2 - SOFSEM 2015: Theory and Practice of Computer Science N2 - We consider problems concerning the scheduling of a set of trains on a single track. For every pair of trains there is a minimum headway, which every train must wait before it enters the track after another train. The speed of each train is also given. Hence for every schedule - a sequence of trains - we may compute the time that is at least needed for all trains to travel along the track in the given order. We give the solution to three problems: the fastest schedule, the average schedule, and the problem of quantile schedules. The last problem is a question about the smallest upper bound on the time of a given fraction of all possible schedules. We show how these problems are related to the travelling salesman problem. We prove NP-completeness of the fastest schedule problem, NP-hardness of quantile of schedules problem, and polynomiality of the average schedule problem. We also describe some algorithms for all three problems. In the solution of the quantile problem we give an algorithm, based on a reverse search method, generating with polynomial delay all Eulerian multigraphs with the given degree sequence and a bound on the number of such multigraphs. A better bound is left as an open question. KW - scheduling KW - eulerian multigraphs Y1 - 2015 U6 - https://doi.org/10.1007/978-3-662-46078-8_17 SP - 201 EP - 216 PB - Springer Berlin Heidelberg ER - TY - GEN A1 - Hiller, Benjamin A1 - Klug, Torsten A1 - Tuchscherer, Andreas T1 - Improving the performance of elevator systems using exact reoptimization algorithms N2 - This extended abstract is about algorithms for controlling elevator systems employing destination hall calls, i.e. the passenger provides his destination floor when calling an elevator. We present the first exact algorithm for controlling a group of elevators and report on simulation results indicating that destination hall call systems outperform conventional systems. T3 - ZIB-Report - 09-05 KW - Aufzugssteuerung KW - Onlineoptimierung KW - Exakte Reoptimierung KW - elevator control KW - online optimization KW - exact reoptimation Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11155 SN - 1438-0064 ER - TY - CHAP A1 - Klug, Torsten A1 - Reuther, Markus A1 - Schlechte, Thomas T1 - Does Laziness Pay Off? - A Lazy-Constraint Approach to Timetabling T2 - 22nd Symposium on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems (ATMOS 2022) N2 - Timetabling is a classical and complex task for public transport operators as well as for railway undertakings. The general question is: Which vehicle is taking which route through the transportation network in which order? In this paper, we consider the special setting to find optimal timetables for railway systems under a moving block regime. We directly set up on our work of [8 ], i.e., we consider the same model formulation and real-world instances of a moving block headway system. In this paper, we present a repair heuristic and a lazy-constraint approach utilizing the callback features of Gurobi, see [3]. We provide an experimental study of the different algorithmic approaches for a railway network with 100 and up to 300 train requests. The computational results show that the lazy-constraint approach together with the repair heuristic significantly improves our previous approaches. Y1 - 2022 U6 - https://doi.org/10.4230/OASIcs.ATMOS.2022.11 VL - 106 SP - 11:1 EP - 11:8 PB - Schloss Dagstuhl -- Leibniz-Zentrum für Informatik ER - TY - JOUR A1 - Schlechte, Thomas A1 - Borndörfer, Ralf A1 - Denißen, Jonas A1 - Heller, Simon A1 - Klug, Torsten A1 - Küpper, Michael A1 - Lindner, Niels A1 - Reuther, Markus A1 - Söhlke, Andreas A1 - Steadman, William T1 - Timetable Optimization for a Moving Block System JF - Journal of Rail Transport Planning & Management N2 - We present an optimization model which is capable of routing and ordering trains on a microscopic level under a moving block regime. Based on a general timetabling definition (GTTP) that allows the plug in of arbitrarily detailed methods to compute running and headway times, we describe a layered graph approach using velocity expansion, and develop a mixed integer linear programming formulation. Finally, we present promising results for a German corridor scenario with mixed traffic, indicating that applying branch-and-cut to our model is able to solve reasonably sized instances with up to hundred trains to optimality. Y1 - 2022 U6 - https://doi.org/10.1016/j.jrtpm.2022.100315 SN - 2210-9706 VL - 22 SP - 100315 ER -