TY - GEN A1 - Fügenschuh, Armin A1 - Geißler, Björn A1 - Gollmer, Ralf A1 - Hayn, Christine A1 - Henrion, Rene A1 - Hiller, Benjamin A1 - Humpola, Jesco A1 - Koch, Thorsten A1 - Lehmann, Thomas A1 - Martin, Alexander A1 - Mirkov, Radoslava A1 - Morsi, Antonio A1 - Römisch, Werner A1 - Rövekamp, Jessica A1 - Schewe, Lars A1 - Schmidt, Martin A1 - Schultz, Rüdiger A1 - Schwarz, Robert A1 - Schweiger, Jonas A1 - Stangl, Claudia A1 - Steinbach, Marc A1 - Willert, Bernhard T1 - Mathematical Optimization for Challenging Network Planning Problems in Unbundled Liberalized Gas Markets N2 - The recently imposed new gas market liberalization rules in Germany lead to a change of business of gas network operators. While previously network operator and gas vendor where united, they were forced to split up into independent companies. The network has to be open to any other gas trader at the same conditions, and free network capacities have to be identified and publicly offered in a non-discriminatory way. We show that these new paradigms lead to new and challenging mathematical optimization problems. In order to solve them and to provide meaningful results for practice, all aspects of the underlying problems, such as combinatorics, stochasticity, uncertainty, and nonlinearity, have to be addressed. With such special-tailored solvers, free network capacities and topological network extensions can, for instance, be determined. T3 - ZIB-Report - 13-13 KW - Gas Market Liberalization KW - Entry-Exit Model KW - Gas Network Access Regulation KW - Mixed-Integer Nonlinear Nonconvex Stochastic Optimization Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-17821 SN - 1438-0064 ER - TY - THES A1 - Schweiger, Jonas T1 - Application of Multistage Stochastic Programming in Strategic Telecommunication Network Planning N2 - Telecommunication is fundamental for the information society. In both, the private and the professional sector, mobile communication is nowadays taken for granted. Starting primarily as a service for speech communication, data service and mobile Internet access are now driving the evolution of network infrastructure. In the year 2009, 19 million users generated over 33 million GB of traffic using mobile data services. The 3rd generation networks (3G or UMTS) in Germany comprises over 39,000 base stations with some 120,000 cells. From 1998 to 2008, the four network operators in Germany invested over 33 billion Euros in their infrastructure. A careful allocation of the resources is thus crucial for the profitability for a network operator: a network should be dimensioned to match customers demand. As this demand evolves over time, the infrastructure has to evolve accordingly. The demand evolution is hard to predict and thus constitutes a strong source of uncertainty. Strategic network planning has to take this uncertainty into account, and the planned network evolution should adapt to changing market conditions. The application of superior planning methods under the consideration of uncertainty can improve the profitability of the network and creates a competitive advantage. Multistage stochastic programming is a suitable framework to model strategic telecommunication network planning. We present mathematical models and effective optimization procedures for strategic cellular network design. The demand evolution is modeled as a continuous stochastic process which is approximated by a discrete scenario tree. A tree-stage approach is used for the construction of non-uniform scenario trees that serve as input of the stochastic program. The model is calibrated by historical traffic observations. A realistic system model of UMTS radio cells is used that determines coverage areas and cell capacities and takes signal propagation and interferences into account. The network design problem is formulated as a multistage stochastic mixed integer linear program, which is solved using state-of-the-art commercial MIP solvers. Problem specific presolving is proposed to reduce the problem size. Computational results on realistic data is presented. Optimization for the expected profit and the conditional value at risk are performed and compared. Y1 - 2010 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-12206 ER - TY - GEN A1 - Eisenblätter, Andreas A1 - Schweiger, Jonas T1 - Multistage Stochastic Programming in Strategic Telecommunication Network Planning N2 - Mobile communication is nowadays taken for granted. Having started primarily as a service for speech communication, data service and mobile Internet access are now driving the evolution of network infrastructure. Operators are facing the challenge to match the demand by continuously expanding and upgrading the network infrastructure. However, the evolution of the customer's demand is uncertain. We introduce a novel (long-term) network planning approach based on multistage stochastic programming, where demand evolution is considered as a stochastic process and the network is extended as to maximize the expected profit. The approach proves capable of designing large-scale realistic UMTS networks with a time-horizon of several years. Our mathematical optimization model, the solution approach, and computational results are presented in this paper. T3 - ZIB-Report - 11-06 KW - UMTS KW - Network Evolution KW - Multistage KW - Stochastic Programming Y1 - 2011 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-12232 ER - TY - GEN A1 - Fügenschuh, Armin A1 - Hiller, Benjamin A1 - Humpola, Jesco A1 - Koch, Thorsten A1 - Lehmann, Thomas A1 - Schwarz, Robert A1 - Schweiger, Jonas A1 - Szabó, Jácint T1 - Gas Network Topology Optimization for Upcoming Market Requirements N2 - Gas distribution networks are complex structures that consist of passive pipes, and active, controllable elements such as valves and compressors. Controlling such network means to find a suitable setting for all active components such that a nominated amount of gas can be transmitted from entries to exits through the network, without violating physical or operational constraints. The control of a large-scale gas network is a challenging task from a practical point of view. In most companies the actual controlling process is supported by means of computer software that is able to simulate the flow of the gas. However, the active settings have to be set manually within such simulation software. The solution quality thus depends on the experience of a human planner. When the gas network is insufficient for the transport then topology extensions come into play. Here a set of new pipes or active elements is determined such that the extended network admits a feasible control again. The question again is how to select these extensions and where to place them such that the total extension costs are minimal. Industrial practice is again to use the same simulation software, determine extensions by experience, add them to the virtual network, and then try to find a feasible control of the active elements. The validity of this approach now depends even more on the human planner. Another weakness of this manual simulation-based approach is that it cannot establish infeasibility of a certain gas nomination, unless all settings of the active elements are tried. Moreover, it is impossible to find a cost-optimal network extension in this way. In order to overcome these shortcomings of the manual planning approach we present a new approach, rigorously based on mathematical optimization. Hereto we describe a model for finding feasible controls and then extend this model such that topology extensions can additionally and simultaneously be covered. Numerical results for real-world instances are presented and discussed. T3 - ZIB-Report - 11-09 KW - Mathematical Optimization KW - Gas Distribution Networks KW - Topology Planning Y1 - 2011 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-12348 ER - TY - CHAP A1 - Eisenblätter, Andreas A1 - Geerdes, Hans-Florian A1 - Gross, James A1 - Puñal, Oscar A1 - Schweiger, Jonas T1 - A Two-Stage Approach to WLAN Planning T2 - Proc. of the 8th International Symposium on Modeling and Optimization in Mobile, Ad Hoc, and Wireless Networks (WiOpt’10) Y1 - 2010 SP - 232 EP - 241 CY - Avignon, France ER - TY - GEN A1 - Schweiger, Jonas T1 - Gas network extension planning for multiple demand scenarios N2 - Today's gas markets demand more flexibility from the network operators which in turn have to invest into their network infrastructure. As these investments are very cost-intensive and long-living, network extensions should not only focus on one bottleneck scenario, but should increase the flexibility to fulfill different demand scenarios. We formulate a model for the network extension problem for multiple demand scenarios and propose a scenario decomposition. We solve MINLP single-scenario sub-problems and obtain valid bounds even without solving them to optimality. Heuristics prove capable of improving the initial solutions substantially. Results of computational experiments are presented. T3 - ZIB-Report - 14-29 KW - Gas Network Planning KW - Scenario Decomposition Y1 - 2014 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-51030 SN - 1438-0064 ER - TY - JOUR A1 - Pfetsch, Marc A1 - Fügenschuh, Armin A1 - Geißler, Björn A1 - Geißler, Nina A1 - Gollmer, Ralf A1 - Hiller, Benjamin A1 - Humpola, Jesco A1 - Koch, Thorsten A1 - Lehmann, Thomas A1 - Martin, Alexander A1 - Morsi, Antonio A1 - Rövekamp, Jessica A1 - Schewe, Lars A1 - Schmidt, Martin A1 - Schultz, Rüdiger A1 - Schwarz, Robert A1 - Schweiger, Jonas A1 - Stangl, Claudia A1 - Steinbach, Marc A1 - Vigerske, Stefan A1 - Willert, Bernhard T1 - Validation of Nominations in Gas Network Optimization: Models, Methods, and Solutions JF - Optimization Methods and Software N2 - In this article we investigate methods to solve a fundamental task in gas transportation, namely the validation of nomination problem: Given a gas transmission network consisting of passive pipelines and active, controllable elements and given an amount of gas at every entry and exit point of the network, find operational settings for all active elements such that there exists a network state meeting all physical, technical, and legal constraints. We describe a two-stage approach to solve the resulting complex and numerically difficult feasibility problem. The first phase consists of four distinct algorithms applying linear, and methods for complementarity constraints to compute possible settings for the discrete decisions. The second phase employs a precise continuous programming model of the gas network. Using this setup, we are able to compute high quality solutions to real-world industrial instances that are significantly larger than networks that have appeared in the mathematical programming literature before. Y1 - 2014 U6 - https://doi.org/10.1080/10556788.2014.888426 PB - Taylor & Francis ER - TY - JOUR A1 - Fügenschuh, Armin A1 - Geißler, Björn A1 - Gollmer, Ralf A1 - Hayn, Christine A1 - Henrion, René A1 - Hiller, Benjamin A1 - Humpola, Jesco A1 - Koch, Thorsten A1 - Lehmann, Thomas A1 - Martin, Alexander A1 - Mirkov, Radoslava A1 - Morsi, Antonio A1 - Römisch, Werner A1 - Rövekamp, Jessica A1 - Schewe, Lars A1 - Schmidt, Martin A1 - Schultz, Rüdiger A1 - Schwarz, Robert A1 - Schweiger, Jonas A1 - Stangl, Claudia A1 - Steinbach, Marc A1 - Willert, Bernhard T1 - Mathematical optimization for challenging network planning problems in unbundled liberalized gas markets JF - Energy Systems N2 - The recently imposed new gas market liberalization rules in Germany lead to a change of business of gas network operators. While previously network operator and gas vendor were united, they were forced to split up into independent companies. The network has to be open to any other gas trader at the same conditions, and free network capacities have to be identified and publicly offered in a non-discriminatory way. We discuss how these changing paradigms lead to new and challenging mathematical optimization problems. This includes the validation of nominations, that asks for the decision if the network’s capacity is sufficient to transport a specific amount of flow, the verification of booked capacities and the detection of available freely allocable capacities, and the topological extension of the network with new pipelines or compressors in order to increase its capacity. In order to solve each of these problems and to provide meaningful results for the practice, a mixture of different mathematical aspects have to be addressed, such as combinatorics, stochasticity, uncertainty, and nonlinearity. Currently, no numerical solver is available that can deal with such blended problems out-of-the-box. The main goal of our research is to develop such a solver, that moreover is able to solve instances of realistic size. In this article, we describe the main ingredients of our prototypical software implementations. Y1 - 2013 U6 - https://doi.org/10.1007/s12667-013-0099-8 VL - 5 IS - 3 SP - 449 EP - 473 PB - Springer Berlin Heidelberg CY - Berlin ER - TY - CHAP A1 - Fügenschuh, Armin A1 - Hiller, Benjamin A1 - Humpola, Jesco A1 - Koch, Thorsten A1 - Lehmann, Thomas A1 - Schwarz, Robert A1 - Schweiger, Jonas A1 - Szabo, Jacint T1 - Gas Network Topology Optimization for Upcoming Market Requirements T2 - International Conference on the European Energy Market (EEM) N2 - Gas distribution networks are complex structures that consist of passive pipes, and active, controllable elements such as valves and compressors. Controlling such network means to find a suitable setting for all active components such that a nominated amount of gas can be transmitted from entries to exits through the network, without violating physical or operational constraints. The control of a large-scale gas network is a challenging task from a practical point of view. In most companies the actual controlling process is supported by means of computer software that is able to simulate the flow of the gas. However, the active settings have to be set manually within such simulation software. The solution quality thus depends on the experience of a human planner. When the gas network is insufficient for the transport then topology extensions come into play. Here a set of new pipes or active elements is determined such that the extended network admits a feasible control again. The question again is how to select these extensions and where to place them such that the total extension costs are minimal. Industrial practice is again to use the same simulation software, determine extensions by experience, add them to the virtual network, and then try to find a feasible control of the active elements. The validity of this approach now depends even more on the human planner. Another weakness of this manual simulation-based approach is that it cannot establish infeasibility of a certain gas nomination, unless all settings of the active elements are tried. Moreover, it is impossible to find a cost-optimal network extension in this way. In order to overcome these shortcomings of the manual planning approach we present a new approach, rigorously based on mathematical optimization. Hereto we describe a model for finding feasible controls and then extend this model such that topology extensions can additionally and simultaneously be covered. Numerical results for real-world instances are presented and discussed. Y1 - 2011 U6 - https://doi.org/10.1109/EEM.2011.5953035 SP - 346 EP - 351 ER - TY - JOUR A1 - Eisenblätter, Andreas A1 - Schweiger, Jonas T1 - Multistage Stochastic Programming in Strategic Telecommunication Network Planning JF - Computational Management Science N2 - Mobile communication is nowadays taken for granted. Having started primarily as a service for speech communication, data service and mobile Internet access are now driving the evolution of network infrastructure. Operators are facing the challenge to match the demand by continuously expanding and upgrading the network infrastructure. However, the evolution of the customer's demand is uncertain. We introduce a novel (long-term) network planning approach based on multistage stochastic programming, where demand evolution is considered as a stochastic process and the network is extended as to maximize the expected profit. The approach proves capable of designing large-scale realistic UMTS networks with a time-horizon of several years. Our mathematical optimization model, the solution approach, and computational results are presented in this paper. Y1 - 2012 U6 - https://doi.org/10.1007/s10287-012-0143-5 VL - 9 IS - 3 SP - 303 EP - 321 PB - Springer ER -