TY - GEN A1 - Gamrath, Gerald A1 - Koch, Thorsten A1 - Maher, Stephen J. A1 - Rehfeldt, Daniel A1 - Shinano, Yuji T1 - SCIP-Jack - A solver for STP and variants with parallelization extensions N2 - The Steiner tree problem in graphs is a classical problem that commonly arises in practical applications as one of many variants. While often a strong relationship between different Steiner tree problem variants can be observed, solution approaches employed so far have been prevalently problem specific. In contrast, this paper introduces a general purpose solver that can be used to solve both the classical Steiner tree problem and many of its variants without modification. This is achieved by transforming various problem variants into a general form and solving them using a state-of-the-art MIP-framework. The result is a high-performance solver that can be employed in massively parallel environments and is capable of solving previously unsolved instances. T3 - ZIB-Report - 15-27 Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-54648 SN - 1438-0064 N1 - A revised version is provided here: http://nbn-resolving.de/urn:nbn:de:0297-zib-60170. ER - TY - GEN A1 - Maher, Stephen J. A1 - Desaulniers, Guy A1 - Soumis, Francois T1 - The tail assignment problem with look-ahead maintenance constraints N2 - The tail assignment problem is a critical part of the airline planning process that assigns specific aircraft to sequences of flights, called lines-of-flight, to be operated the next day. The aim of this paper is to develop an operationally flexible tail assignment that satisfies short-range---within the next three days---aircraft maintenance requirements and performs the aircraft/flight gate assignment for each input line-of-flight. While maintenance plans commonly span multiple days, the related tail assignment problems can be overly complex and provide little recourse in the event of schedule perturbations. The presented approach addresses operational uncertainty by extending the one-day routes aircraft maintenance routing approach to satisfy maintenance requirements explicitly for the current day and implicitly for the subsequent two days. A mathematical model is presented that integrates the gate assignment and maintenance planning problems. To increase the satisfaction of maintenance requirements, an iterative algorithm is developed that modifies the fixed lines-of-flight provided as input to the tail assignment problem. The tail assignment problem and iterative algorithm are demonstrated to effectively satisfy maintenance requirements within appropriate run times using input data collected from three different airlines. T3 - ZIB-Report - 15-56 KW - Tail assignment KW - Column generation KW - Iterative algorithm Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-56717 SN - 1438-0064 ER - TY - JOUR A1 - Maher, Stephen J. T1 - A novel passenger recovery approach for the integrated airline recovery problem JF - Computers & Operations Research N2 - Schedule disruptions require airlines to intervene through the process of recovery; this involves modifications to the planned schedule, aircraft routings, crew pairings and passenger itineraries. Passenger recovery is generally considered as the final stage in this process, and hence passengers experience unnecessarily large impacts resulting from flight delays and cancellations. Most recovery approaches considering passengers involve a separately defined module within the problem formulation. However, this approach may be overly complex for recovery in many aviation and general transportation applications. This paper presents a unique description of the cancellation variables that models passenger recovery by prescribing the alternative travel arrangements for passengers in the event of flight cancellations. The results will demonstrate that this simple, but effective, passenger recovery approach significantly reduces the operational costs of the airline and increases passenger flow through the network. The integrated airline recovery problem with passenger reallocation is solved using column-and-row generation to achieve high quality solutions in short runtimes. An analysis of the column-and-row generation solution approach is performed, identifying a number of enhancement techniques to further improve the solution runtimes. Y1 - 2015 U6 - https://doi.org/10.1016/j.cor.2014.11.005 VL - 57 SP - 123 EP - 137 ER - TY - JOUR A1 - Maher, Stephen J. T1 - Solving the integrated airline recovery problem using column-and-row generation JF - Transportation Science N2 - Airline recovery presents very large and difficult problems requiring high quality solutions within very short time limits. To improve computational performance, the complete airline recovery problem is generally formulated as a series of sequential stages. While the sequential approach greatly simplifies the complete recovery problem, there is no guarantee of global optimality or solution quality. To address this, there has been increasing interest in the development of efficient solution techniques to solve an integrated recovery problem. In this paper, an integrated airline recovery problem is proposed by integrating the schedule, crew and aircraft recovery stages. To achieve short runtimes and high quality solutions, this problem is solved using column-and-row generation. Column-and-row generation achieves an improvement in solution runtimes by reducing the problem size and thereby achieving a faster execution of each LP solve. Further, the results demonstrate that a good upper bound achieved early in the solution process, indicating an improved solution quality with the early termination of the algorithm. This paper also details the integration of the row generation procedure with branch-and-price, which is used to achieve integral optimal solutions. The benefits of applying column-and-row generation to solve the integrated recovery problem are demonstrated with a comparison to a standard column generation technique. Y1 - 2015 U6 - https://doi.org/10.1287/trsc.2014.0552 VL - 50 IS - 1 SP - 216 EP - 239 ER - TY - JOUR A1 - Maher, Stephen J. A1 - Murray, John M. T1 - The unrooted set covering connected subgraph problem differentiating between HIV envelope sequences JF - European Journal of Operational Research N2 - This paper presents a novel application of operations research techniques to the analysis of HIV Env gene sequences, aiming to identify key features that are possible vaccine targets. These targets are identified as being critical to the transmission of HIV by being present in early transmitted (founder) sequences and absent in later chronic sequences. Identifying the key features of Env involves two steps: first, calculating the covariance of amino acid combinations and positions to form a network of related and compensatory mutations; and second, developing an integer program to identify the smallest connected subgraph of the constructed covariance network that exhibits a set covering property. The integer program developed for this analysis, labelled the unrooted set covering connected subgraph problem (USCCSP), integrates a set covering problem and connectivity evaluation, the latter formulated as a network flow problem. The resulting integer program is very large and complex, requiring the use of Benders' decomposition to develop an efficient solution approach. The results will demonstrate the necessity of applying acceleration techniques to the Benders' decomposition solution approach and the effectiveness of these techniques and heuristic approaches for solving the USCCSP. Y1 - 2016 U6 - https://doi.org/doi:10.1016/j.ejor.2015.07.011 VL - 248 IS - 2 SP - 668 EP - 680 ER - TY - JOUR A1 - Maher, Stephen J. A1 - Desaulniers, Guy A1 - Soumis, Francois T1 - The daily tail assignment problem under operational uncertainty using look-ahead maintenance constraints JF - European Journal of Operational Research N2 - The tail assignment problem is a critical part of the airline planning process that assigns specific aircraft to sequences of flights, called lines-of-flight, to satisfy operational constraints. The aim of this paper is to develop an operationally flexible method, based upon the one-day routes business model, to compute tail assignments that satisfy short-range—within the next three days—aircraft maintenance requirements. While maintenance plans commonly span multiple days, the methods used to compute tail assignments for the given plans can be overly complex and provide little recourse in the event of schedule perturbations. The presented approach addresses operational uncertainty by using solutions from the one-day routes aircraft maintenance routing approach as input. The daily tail assignment problem is solved with an objective to satisfy maintenance requirements explicitly for the current day and implicitly for the subsequent two days. A computational study will be performed to assess the performance of exact and heuristic solution algorithms that modify the input lines-of-flight to reduce maintenance misalignments. The daily tail assignment problem and the developed algorithms are demonstrated to compute solutions that effectively satisfy maintenance requirements when evaluated using input data collected from three different airlines. Y1 - 2018 U6 - https://doi.org/10.1016/j.ejor.2017.06.041 VL - 264 IS - 2 SP - 534 EP - 547 ER - TY - GEN A1 - Gamrath, Gerald A1 - Koch, Thorsten A1 - Maher, Stephen J. A1 - Rehfeldt, Daniel A1 - Shinano, Yuji T1 - SCIP-Jack – A solver for STP and variants with parallelization extensions N2 - The Steiner tree problem in graphs is a classical problem that commonly arises in practical applications as one of many variants. While often a strong relationship between different Steiner tree problem variants can be observed, solution approaches employed so far have been prevalently problem-specific. In contrast, this paper introduces a general-purpose solver that can be used to solve both the classical Steiner tree problem and many of its variants without modification. This versatility is achieved by transforming various problem variants into a general form and solving them by using a state-of-the-art MIP-framework. The result is a high-performance solver that can be employed in massively parallel environments and is capable of solving previously unsolved instances. T3 - ZIB-Report - 16-41 KW - Steiner tree problem KW - SCIP-Jack KW - Steiner tree variants KW - maximum-weight connected subgraph KW - prize-collecting Steiner tree Y1 - 2016 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-60170 SN - 1438-0064 ER - TY - GEN A1 - Gleixner, Ambros A1 - Maher, Stephen J. A1 - Müller, Benjamin A1 - Pedroso, João Pedro T1 - Exact Methods for Recursive Circle Packing N2 - Packing rings into a minimum number of rectangles is an optimization problem which appears naturally in the logistics operations of the tube industry. It encompasses two major difficulties, namely the positioning of rings in rectangles and the recursive packing of rings into other rings. This problem is known as the Recursive Circle Packing Problem (RCPP). We present the first dedicated method for solving RCPP that provides strong dual bounds based on an exact Dantzig–Wolfe reformulation of a nonconvex mixed-integer nonlinear programming formulation. The key idea of this reformulation is to break symmetry on each recursion level by enumerating one-level packings, i.e., packings of circles into other circles, and by dynamically generating packings of circles into rectangles. We use column generation techniques to design a “price-and-verify” algorithm that solves this reformulation to global optimality. Extensive computational experiments on a large test set show that our method not only computes tight dual bounds, but often produces primal solutions better than those computed by heuristics from the literature. T3 - ZIB-Report - 17-07 Y1 - 2017 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-62039 ER - TY - GEN A1 - Rehfeldt, Daniel A1 - Koch, Thorsten A1 - Maher, Stephen J. T1 - Reduction Techniques for the Prize-Collecting Steiner Tree Problem and the Maximum-Weight Connected Subgraph Problem N2 - The concept of reduction has frequently distinguished itself as a pivotal ingredient of exact solving approaches for the Steiner tree problem in graphs. In this paper we broaden the focus and consider reduction techniques for three Steiner problem variants that have been extensively discussed in the literature and entail various practical applications: The prize-collecting Steiner tree problem, the rooted prize-collecting Steiner tree problem and the maximum-weight connected subgraph problem. By introducing and subsequently deploying numerous new reduction methods, we are able to drastically decrease the size of a large number of benchmark instances, already solving more than 90 percent of them to optimality. Furthermore, we demonstrate the impact of these techniques on exact solving, using the example of the state-of-the-art Steiner problem solver SCIP-Jack. T3 - ZIB-Report - 16-47 KW - Steiner tree problems KW - reduction techniques KW - prize-collecting Steiner tree problem KW - maximum-weight connected subgraph problem Y1 - 2016 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-60420 SN - 1438-0064 ER - TY - GEN A1 - Gottwald, Robert Lion A1 - Maher, Stephen J. A1 - Shinano, Yuji T1 - Distributed domain propagation N2 - Portfolio parallelization is an approach that runs several solver instances in parallel and terminates when one of them succeeds in solving the problem. Despite it's simplicity portfolio parallelization has been shown to perform well for modern mixed-integer programming (MIP) and boolean satisfiability problem (SAT) solvers. Domain propagation has also been shown to be a simple technique in modern MIP and SAT solvers that effectively finds additional domain reductions after a variables domain has been reduced. This paper investigates the impact of distributed domain propagation in modern MIP solvers that employ portfolio parallelization. Computational experiments were conducted for two implementations of this parallelization approach. While both share global variable bounds and solutions they communicate differently. In one implementation the communication is performed only at designated points in the solving process and in the other it is performed completely asynchronously. Computational experiments show a positive performance impact of communicating global variable bounds and provide valuable insights in communication strategies for parallel solvers. T3 - ZIB-Report - 16-71 KW - mixed integer programming KW - parallelization KW - domain propagation KW - portfolio solvers Y1 - 2016 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-61380 SN - 1438-0064 ER -