TY - GEN A1 - Werner, Axel A1 - Aurzada, Frank A1 - Bley, Andreas A1 - Eisenblätter, Andreas A1 - Geerdes, Hans-Florian A1 - Guillemard, Mijail A1 - Kutyniok, Gitta A1 - Philipp, Friedrich A1 - Raack, Christian A1 - Scheutzow, Michael ED - Deuflhard, Peter ED - Grötschel, Martin ED - Hömberg, Dietmar ED - Horst, Ulrich ED - Kramer, Jürg ED - Mehrmann, Volker ED - Polthier, Konrad ED - Schmidt, Frank ED - Schütte, Christof ED - Skutella, Martin ED - Sprekels, Jürgen T1 - Mathematics for telecommunications T2 - MATHEON - Mathematics for Key Technologies Y1 - 2014 U6 - https://doi.org/10.4171/137 VL - 1 SP - 75 EP - 89 PB - European Mathematical Society ET - EMS Series in Industrial and Applied Mathematics ER - TY - GEN A1 - Bley, Andreas A1 - D'Andreagiovanni, Fabio A1 - Karch, Daniel T1 - Scheduling technology migration in WDM Networks N2 - The rapid technological evolution of telecommunication networks demands service providers to regularly update their technology, with the aim of remaining competitive in the marketplace. However, upgrading the technology in a network is not a trivial task. New hardware components need to be installed in the network and during the installation network connectivity may be temporarily compromised. The Wavelength Division Multiplexing (WDM) technology, whose upgrade is considered in here, shares fiber links among several optical connections and tearing down a single link may disrupt several optical connections at once. When the upgrades involve large parts of a network, typically not all links can be upgraded in parallel, which may lead to an unavoidable longer disruption of some connections. A bad scheduling of the overall endeavor, however, can dramatically increase the disconnection time of parts of the networks, causing extended service disruption. In this contribution, we study the problem of finding a schedule of the fiber link upgrades that minimizes the total service disruption time. To the best of our knowledge, this problem has not yet been formalized and investigated. The aim of our work is to close this gap by presenting a mathematical optimization model for the problem and an innovative solution algorithm that tackles the intrinsic difficulties of the problem. Computational experience on realistic instances completes our study. Our original investigations have been driven by real needs of DFN, operator of the German National Research and Education Network and our partner in the BMBF research project ROBUKOM (http://www.robukom.de/). T3 - ZIB-Report - 13-62 KW - Scheduling, Extended Formulations, Network Migration, WDM Networks Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-42654 UR - http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=6507677&isnumber=6507670 SN - 1438-0064 ER - TY - CHAP A1 - Bley, Andreas A1 - D'Andreagiovanni, Fabio A1 - Karch, Daniel T1 - Scheduling technology migration in WDM Networks T2 - Photonic Networks, 14. 2013 ITG Symposium. Proceedings Y1 - 2013 SP - 1 EP - 5 ER - TY - CHAP A1 - Bley, Andreas A1 - D'Andreagiovanni, Fabio A1 - Karch, Daniel T1 - WDM Fiber Replacement Scheduling T2 - Proceedings of INOC 2013 Y1 - 2013 U6 - https://doi.org/10.1016/j.endm.2013.05.092 VL - 41 SP - 189 EP - 196 ER - TY - CHAP A1 - Matuschke, Jannik A1 - Bley, Andreas A1 - Müller, Benjamin ED - Bodlaender, Hans L. ED - Italiano, Giuseppe F. T1 - Approximation Algorithms for Facility Location with Capacitated and Length-Bounded Tree Connections N2 - We consider a generalization of the uncapacitated facility location problem that occurs in planning of optical access networks in telecommunications. Clients are connected to open facilities via depth-bounded trees. The total demand of clients served by a tree must not exceed a given tree capacity. We investigate a framework for combining facility location algorithms with a tree-based clustering approach and derive approximation algorithms for several variants of the problem, using techniques for approximating shallow-light Steiner trees via layer graphs, simultaneous approximation of shortest paths and minimum spanning trees, and greedy coverings. Y1 - 2013 U6 - https://doi.org/10.1007/978-3-642-40450-4_60 VL - Algorithms -- ESA 2013 SP - 707 EP - 718 PB - Springer ER - TY - CHAP A1 - Bley, Andreas A1 - Gleixner, Ambros A1 - Koch, Thorsten A1 - Vigerske, Stefan T1 - Comparing MIQCP Solvers to a Specialised Algorithm for Mine Production Scheduling T2 - Modeling, Simulation and Optimization of Complex Processes. Proceedings of the Fourth International Conference on High Performance Scientific Computing, March 2-6, 2009, Hanoi, Vietnam N2 - In this paper we investigate the performance of several out-of-the box solvers for mixed-integer quadratically constrained programmes (MIQCPs) on an open pit mine production scheduling problem with mixing constraints. We compare the solvers BARON, Couenne, SBB, and SCIP to a problem-specific algorithm on two different MIQCP formulations. The computational results presented show that general-purpose solvers with no particular knowledge of problem structure are able to nearly match the performance of a hand-crafted algorithm. Y1 - 2012 U6 - https://doi.org/10.1007/978-3-642-25707-0_3 SP - 25 EP - 39 ER - TY - GEN A1 - Bley, Andreas T1 - On the Hardness of Finding Small Shortest Path Routing Conflicts N2 - Nowadays most data networks use shortest path protocols such as OSPF or IS-IS to route traffic. Given administrative routing lengths for the links of a network, all data packets are sent along shortest paths with respect to these lengths from their source to their destination. One of the most fundamental problems in planning shortest path networks is to decide whether a given set of routing paths forms a valid routing and, if this is not the case, to find a small subset of the given paths that cannot be shortest paths simultaneously for any routing lengths. In this paper we show that it is NP-hard to approximate the size of the smallest shortest path conflict by a factor less than 7/6. T3 - ZIB-Report - 09-15 KW - shortest path routing KW - computational complexity Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11276 SN - 1438-0064 ER - TY - GEN A1 - Bley, Andreas A1 - Gleixner, Ambros A1 - Koch, Thorsten A1 - Vigerske, Stefan T1 - Comparing MIQCP solvers to a specialised algorithm for mine production scheduling N2 - In this paper we investigate the performance of several out-of-the box solvers for mixed-integer quadratically constrained programmes (MIQCPs) on an open pit mine production scheduling problem with mixing constraints. We compare the solvers BARON, Couenne, SBB, and SCIP to a problem-specific algorithm on two different MIQCP formulations. The computational results presented show that general-purpose solvers with no particular knowledge of problem structure are able to nearly match the performance of a hand-crafted algorithm. T3 - ZIB-Report - 09-32 Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11507 SN - 1438-0064 ER - TY - CHAP A1 - Bley, Andreas T1 - On the Hardness of Finding Small Shortest Path Routing Conflicts T2 - Proceedings of 4th International Network Optimization Conference (INOC2009) N2 - Nowadays most data networks use shortest path protocols such as OSPF or IS-IS to route traffic. Given administrative routing lengths for the links of a network, all data packets are sent along shortest paths with respect to these lengths from their source to their destination. One of the most fundamental problems in planning shortest path networks is to decide whether a given set of routing paths forms a valid routing and, if this is not the case, to find a small subset of the given paths that cannot be shortest paths simultaneously for any routing lengths. In this paper we show that it is NP-hard to approximate the size of the smallest shortest path conflict by a factor less than 7/6. Y1 - 2009 ER - TY - GEN A1 - Bley, Andreas A1 - Koch, Thorsten A1 - Niu, Lingfeng T1 - Experiments with nonlinear extensions to SCIP N2 - This paper describes several experiments to explore the options for solving a class of mixed integer nonlinear programming problems that stem from a real-world mine production planning project. The only type of nonlinear constraints in these problems are bilinear equalities involving continuous variables, which enforce the ratios between elements in mixed material streams. A branch-and-bound algorithm to handle the integer variables has been tried in another project. However, this branch-and-bound algorithm is not effective for handling the nonlinear constraints. Therefore state-of-the-art nonlinear solvers are utilized to solve the resulting nonlinear subproblems in this work. The experiments were carried out using the NEOS server for optimization. After finding that current nonlinear programming solvers seem to lack suitable preprocessing capabilities, we preprocess the instances beforehand and use an heuristic approach to solve the nonlinear subproblems. In the appendix, we explain how to add a polynomial constraint handler that uses IPOPT as embedded nonlinear programming solver for the constraint programming framework SCIP. This is one of the crucial steps for implementing our algorithm in SCIP. We briefly described our approach and give an idea of the work involved. T3 - ZIB-Report - 08-28 Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-8300 SN - 1438-0064 ER -