TY - GEN A1 - Borndörfer, Ralf A1 - Karbstein, Marika T1 - Metric Inequalities for Routings on Direct Connections with Application in Line Planning N2 - We consider multi-commodity flow problems in which capacities are installed on paths. In this setting, it is often important to distinguish between flows on direct connection routes, using single paths, and flows that include path switching. We derive a feasibility condition for path capacities supporting such direct connection flows similar to the feasibility condition for arc capacities in ordinary multi-commodity flows. The concept allows to solve large-scale real-world line planning problems in public transport including a novel passenger routing model that favors direct connections over connections with transfers. T3 - ZIB-Report - 15-07 KW - combinatorial optimization KW - integer programming KW - line planning KW - transfers KW - direct connection KW - metric inequalities Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-53507 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Sagnol, Guillaume A1 - Schlechte, Thomas A1 - Swarat, Elmar T1 - Optimal Toll Enforcement - an Integration of Vehicle Routing and Duty Rostering N2 - We present the problem of planning mobile tours of inspectors on German motorways to enforce the payment of the toll for heavy good trucks. This is a special type of vehicle routing problem with the objective to conduct as good inspections as possible on the complete network. In addition, the crews of the tours have to be scheduled. Thus, we developed a personalized crew rostering model. The planning of daily tours and the rostering are combined in a novel integrated approach and formulated as a complex and large scale Integer Program. The paper focuses first on different requirements for the rostering and how they can be modeled in detail. The second focus is on a bicriterion analysis of the planning problem to find the balance between the control quality and the roster acceptance. On the one hand the tour planning is a profit maximization problem and on the other hand the rostering should be made in a employee friendly way. Finally, computational results on real-world instances show the practicability of our method. T3 - ZIB-Report - 13-79 KW - vehicle routing KW - crew rostering KW - integer programming KW - bicriteria optimization Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-45107 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Karbstein, Marika ED - Delling, Daniel ED - Liberti, Leo T1 - A Direct Connection Approach to Integrated Line Planning and Passenger Routing T2 - ATMOS 2012 - 12th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems N2 - The treatment of transfers is a major challenge in line planning. Existing models either route passengers and lines sequentially, and hence disregard essential degrees of freedom, or they are of extremely large scale, and seem to be computationally intractable. We propose a novel direct connection approach that allows an integrated optimization of line and passenger routing, including accurate estimates of the number of direct travelers, for large-scale real-world instances. T3 - ZIB-Report - 12-29 KW - combinatorial optimization KW - integer programming KW - line planning KW - transfers Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-15812 SN - 1438-0064 VL - 25 SP - 47 EP - 57 PB - Schloss Dagstuhl - Leibniz-Zentrum für Informatik ER - TY - GEN A1 - Borndörfer, Ralf A1 - Neumann, Marika T1 - Models for Line Planning with Transfers N2 - We propose a novel integer programming approach to transfer minimization for line planning problems in public transit. The idea is to incorporate penalties for transfers that are induced by “connection capacities” into the construction of the passenger paths. We show that such penalties can be dealt with by a combination of shortest and constrained shortest path algorithms such that the pricing problem for passenger paths can be solved efficiently. Connection capacity penalties (under)estimate the true transfer times. This error is, however, not a problem in practice. We show in a computational comparison with two standard models on a real-world scenario that our approach can be used to minimize passenger travel and transfer times for large-scale line planning problems with accurate results. T3 - ZIB-Report - 10-11 KW - Linienplanung KW - Umsteigen KW - Ganzzahlige Programmierung KW - Kombinatorische Optimierung KW - line planning KW - transfers KW - integer programming KW - combinatorial optimization Y1 - 2010 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11742 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Cardonha, Carlos T1 - A Set Partitioning Approach to Shunting N2 - The Vehicle Positioning Problem (VPP) is a classical combinatorial optimization problem in public transport planning. A number of models and approaches have been suggested in the literature, which work for small problems, but not for large ones. We propose in this article a novel set partitioning model and an associated column generation solution approach for the VPP. The model provides a tight linear description of the problem. The pricing problem, and hence the LP relaxation itself, can be solved in polynomial resp. pseudo-polynomial time for some versions of the problems. T3 - ZIB-Report - 09-18 KW - integer programming KW - set partitioning KW - combinatorial packing KW - vehicle positioning Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11326 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Grötschel, Martin A1 - Jaeger, Ulrich T1 - Planning Problems in Public Transit N2 - Every day, millions of people are transported by buses, trains, and airplanes in Germany. Public transit (PT) is of major importance for the quality of life of individuals as well as the productivity of entire regions. Quality and efficiency of PT systems depend on the political framework (state-run, market oriented) and the suitability of the infrastructure (railway tracks, airport locations), the existing level of service (timetable, flight schedule), the use of adequate technologies (information, control, and booking systems), and the best possible deployment of equipment and resources (energy, vehicles, crews). The decision, planning, and optimization problems arising in this context are often gigantic and “scream” for mathematical support because of their complexity. This article sketches the state and the relevance of mathematics in planning and operating public transit, describes today’s challenges, and suggests a number of innovative actions. The current contribution of mathematics to public transit is — depending on the transportation mode — of varying depth. Air traffic is already well supported by mathematics. Bus traffic made significant advances in recent years, while rail traffic still bears significant opportunities for improvements. In all areas of public transit, the existing potentials are far from being exhausted. For some PT problems, such as vehicle and crew scheduling in bus and air traffic, excellent mathematical tools are not only available, but used in many places. In other areas, such as rolling stock rostering in rail traffic, the performance of the existing mathematical algorithms is not yet sufficient. Some topics are essentially untouched from a mathematical point of view; e.g., there are (except for air traffic) no network design or fare planning models of practical relevance. PT infrastructure construction is essentially devoid of mathematics, even though enormous capital investments are made in this area. These problems lead to questions that can only be tackled by engineers, economists, politicians, and mathematicians in a joint effort. Among other things, the authors propose to investigate two specific topics, which can be addressed at short notice, are of fundamental importance not only for the area of traffic planning, should lead to a significant improvement in the collaboration of all involved parties, and, if successful, will be of real value for companies and customers: • discrete optimal control: real-time re-planning of traffic systems in case of disruptions, • model integration: service design in bus and rail traffic. Work on these topics in interdisciplinary research projects could be funded by the German ministry of research and education (BMBF), the German ministry of economics (BMWi), or the German science foundation (DFG). T3 - ZIB-Report - 09-13 KW - öffentlicher Verkehr KW - diskrete Optimierung KW - ganzzahlige Programmierung KW - public transit KW - discrete optimization KW - integer programming Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11252 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Cardonha, Carlos T1 - A Binary Quadratic Programming Approach to the Vehicle Positioning Problem N2 - The Vehicle Positioning Problem (VPP) consists of the assignment of vehicles (buses, trams or trains) of a public transport or railway company to parking positions in a depot and to timetabled trips. Such companies have many different types of vehicles, and each trip can be performed only by vehicles of some of these types. These assignments are non-trivial due to the topology of depots. The parking positions are organized in tracks, which work as one- or two-sided stacks or queues. If a required type of vehicle is not available in the front of any track, shunting movements must be performed in order to change vehicles' positions, which is undesirable and should be avoided. In this text we present integer linear and non-linear programming formulations for some versions of the problem and compare them from a theoretical and a computational point of view. T3 - ZIB-Report - 09-12 KW - quadratic programming KW - integer programming KW - nonlinear programming KW - vehicle positioning Y1 - 2009 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11242 SN - 1438-0064 ER - TY - GEN A1 - Torres, Luis Miguel A1 - Torres, Ramiro A1 - Borndörfer, Ralf A1 - Pfetsch, Marc T1 - Line Planning on Paths and Tree Networks with Applications to the Quito Trolebus System (Extended Abstract) N2 - Line planning is an important step in the strategic planning process of a public transportation system. In this paper, we discuss an optimization model for this problem in order to minimize operation costs while guaranteeing a certain level of quality of service, in terms of available transport capacity. We analyze the problem for path and tree network topologies as well as several categories of line operation that are important for the Quito Trolebus system. It turns out that, from a computational complexity worst case point of view, the problem is hard in all but the most simple variants. In practice, however, instances based on real data from the Trolebus System in Quito can be solved quite well, and significant optimization potentials can be demonstrated. T3 - ZIB-Report - 08-53 KW - line planning KW - computational complexity KW - public transport KW - integer programming Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11076 SN - 1438-0064 ER - TY - GEN A1 - Torres, Luis Miguel A1 - Torres, Ramiro A1 - Borndörfer, Ralf A1 - Pfetsch, Marc T1 - Line Planning on Paths and Tree Networks with Applications to the Quito Trolebus System N2 - Line planning is an important step in the strategic planning process of a public transportation system. In this paper, we discuss an optimization model for this problem in order to minimize operation costs while guaranteeing a certain level of quality of service, in terms of available transport capacity. We analyze the problem for path and tree network topologies as well as several categories of line operation that are important for the Quito Trolebus system. It turns out that, from a computational complexity worst case point of view, the problem is hard in all but the most simple variants. In practice, however, instances based on real data from the Trolebus System in Quito can be solved quite well, and significant optimization potentials can be demonstrated. T3 - ZIB-Report - 08-35 KW - line planning KW - computational complexity KW - public transport KW - integer programming Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-10869 SN - 1438-0064 ER -