TY - GEN A1 - Masing, Berenike A1 - Lindner, Niels A1 - Borndörfer, Ralf T1 - The Price of Symmetric Line Plans in the Parametric City N2 - We consider the line planning problem in public transport in the Parametric City, an idealized model that captures typical scenarios by a (small) number of parameters. The Parametric City is rotation symmetric, but optimal line plans are not always symmetric. This raises the question to quantify the symmetry gap between the best symmetric and the overall best solution. For our analysis, we formulate the line planning problem as a mixed integer linear program, that can be solved in polynomial time if the solutions are forced to be symmetric. The symmetry gap is provably small when a specific Parametric City parameter is fixed, and we give an approximation algorithm for line planning in the Parametric City in this case. While the symmetry gap can be arbitrarily large in general, we show that symmetric line plans are a good choice in most practical situations. T3 - ZIB-Report - 22-01 KW - line planning KW - mixed integer programming KW - parametric city modeling Y1 - 2022 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-85648 SN - 1438-0064 ER - TY - GEN A1 - Masing, Berenike A1 - Lindner, Niels A1 - Borndörfer, Ralf T1 - Optimal Line Plans in the Parametric City and the Impact of In-Motion Costs N2 - Line planning in public transport involves determining vehicle routes and assigning frequencies of service such that travel demands are satisfied. We evaluate how line plans, which are optimal with respect to in-motion costs (IMC), the objective function depending purely on arc-lengths for both user and operator costs, performs with respect to the value of resources consumed (VRC). The latter is an elaborate, socio-economic cost function which includes discomfort caused by delay, boarding and alighting times, and transfers. Even though discomfort is a large contributing factor to VRC and is entirely disregarded in IMC, we observe that the two cost functions are qualitatively comparable. T3 - ZIB-Report - 21-27 KW - line planning KW - public transport KW - mixed-integer prgramming Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-84195 SN - 1438-0064 ER - TY - GEN A1 - Masing, Berenike T1 - Optimal Line Planning in the Parametric City N2 - We formulate the line planning problem in public transport as a mixed integer linear program (MILP), which selects both passenger and vehicle routes, such that travel demands are met with respect to minimized travel times for both operators and users. We apply MILP to the Parametric City, a generic city model developed by Fielbaum et al. While the infrastructure graph and demand are entirely rotation symmetric, asymmetric optimal line plans can occur. Using group theory, we analyze the properties of symmetric solutions and introduce a symmetry gap to measure their deviation of the optimum. We also develop a 1+(1+\sqrt{2})/g-approximation algorithm, depending only on the cost related parameter g. Supported by computational experiments, we conclude that in practice symmetric line plans provide good solutions for the line planning problem in the Parametric City. T3 - ZIB-Report - 21-26 KW - line planning KW - city modelling KW - symmetry KW - mixed integer programming KW - approximation algorithm Y1 - 2021 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-83238 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Arslan, Oytun A1 - Elijazyfer, Ziena A1 - Güler, Hakan A1 - Renken, Malte A1 - Sahin, Güvenc A1 - Schlechte, Thomas T1 - Line Planning on Path Networks with Application to the Istanbul Metrobüs N2 - Bus rapid transit systems in developing and newly industrialized countries often consist of a trunk with a path topology. On this trunk, several overlapping lines are operated which provide direct connections. The demand varies heavily over the day, with morning and afternoon peaks typically in reverse directions. We propose an integer programming model for this problem, derive a structural property of line plans in the static (or single period) ``unimodal demand'' case, and consider approaches to the solution of the multi-period version that rely on clustering the demand into peak and off-peak service periods. An application to the Metrobüs system of Istanbul is discussed. T3 - ZIB-Report - 16-38 KW - line planning KW - unimodal demand Y1 - 2016 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-60119 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Karbstein, Marika T1 - Metric Inequalities for Routings on Direct Connections with Application in Line Planning N2 - We consider multi-commodity flow problems in which capacities are installed on paths. In this setting, it is often important to distinguish between flows on direct connection routes, using single paths, and flows that include path switching. We derive a feasibility condition for path capacities supporting such direct connection flows similar to the feasibility condition for arc capacities in ordinary multi-commodity flows. The concept allows to solve large-scale real-world line planning problems in public transport including a novel passenger routing model that favors direct connections over connections with transfers. T3 - ZIB-Report - 15-07 KW - combinatorial optimization KW - integer programming KW - line planning KW - transfers KW - direct connection KW - metric inequalities Y1 - 2015 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-53507 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Hoppmann, Heide A1 - Karbstein, Marika T1 - A Configuration Model for the Line Planning Problem N2 - We propose a novel extended formulation for the line planning problem in public transport. It is based on a new concept of frequency configurations that account for all possible options to provide a required transportation capacity on an infrastructure edge. We show that this model yields a strong LP relaxation. It implies, in particular, general classes of facet defining inequalities for the standard model. T3 - ZIB-Report - 13-40 KW - combinatorial optimization KW - polyhedral combinatorics KW - line planning Y1 - 2013 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-41903 SN - 1438-0064 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Karbstein, Marika ED - Delling, Daniel ED - Liberti, Leo T1 - A Direct Connection Approach to Integrated Line Planning and Passenger Routing T2 - ATMOS 2012 - 12th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems N2 - The treatment of transfers is a major challenge in line planning. Existing models either route passengers and lines sequentially, and hence disregard essential degrees of freedom, or they are of extremely large scale, and seem to be computationally intractable. We propose a novel direct connection approach that allows an integrated optimization of line and passenger routing, including accurate estimates of the number of direct travelers, for large-scale real-world instances. T3 - ZIB-Report - 12-29 KW - combinatorial optimization KW - integer programming KW - line planning KW - transfers Y1 - 2012 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-15812 SN - 1438-0064 VL - 25 SP - 47 EP - 57 PB - Schloss Dagstuhl - Leibniz-Zentrum für Informatik ER - TY - GEN A1 - Borndörfer, Ralf A1 - Neumann, Marika T1 - Models for Line Planning with Transfers N2 - We propose a novel integer programming approach to transfer minimization for line planning problems in public transit. The idea is to incorporate penalties for transfers that are induced by “connection capacities” into the construction of the passenger paths. We show that such penalties can be dealt with by a combination of shortest and constrained shortest path algorithms such that the pricing problem for passenger paths can be solved efficiently. Connection capacity penalties (under)estimate the true transfer times. This error is, however, not a problem in practice. We show in a computational comparison with two standard models on a real-world scenario that our approach can be used to minimize passenger travel and transfer times for large-scale line planning problems with accurate results. T3 - ZIB-Report - 10-11 KW - Linienplanung KW - Umsteigen KW - Ganzzahlige Programmierung KW - Kombinatorische Optimierung KW - line planning KW - transfers KW - integer programming KW - combinatorial optimization Y1 - 2010 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11742 SN - 1438-0064 ER - TY - GEN A1 - Torres, Luis Miguel A1 - Torres, Ramiro A1 - Borndörfer, Ralf A1 - Pfetsch, Marc T1 - Line Planning on Paths and Tree Networks with Applications to the Quito Trolebus System (Extended Abstract) N2 - Line planning is an important step in the strategic planning process of a public transportation system. In this paper, we discuss an optimization model for this problem in order to minimize operation costs while guaranteeing a certain level of quality of service, in terms of available transport capacity. We analyze the problem for path and tree network topologies as well as several categories of line operation that are important for the Quito Trolebus system. It turns out that, from a computational complexity worst case point of view, the problem is hard in all but the most simple variants. In practice, however, instances based on real data from the Trolebus System in Quito can be solved quite well, and significant optimization potentials can be demonstrated. T3 - ZIB-Report - 08-53 KW - line planning KW - computational complexity KW - public transport KW - integer programming Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11076 SN - 1438-0064 ER - TY - GEN A1 - Torres, Luis Miguel A1 - Torres, Ramiro A1 - Borndörfer, Ralf A1 - Pfetsch, Marc T1 - On the Line Planning Problem in Tree Networks N2 - We introduce an optimization model for the line planning problem in a public transportation system that aims at minimizing operational costs while ensuring a given level of quality of service in terms of available transport capacity. We discuss the computational complexity of the model for tree network topologies and line structures that arise in a real-world application at the Trolebus Integrated System in Quito. Computational results for this system are reported. T3 - ZIB-Report - 08-52 KW - line planning KW - computational complexity KW - public transport optimization Y1 - 2008 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-11069 SN - 1438-0064 ER -