@misc{BorndoerferGrimmReutheretal.2016, author = {Bornd{\"o}rfer, Ralf and Grimm, Boris and Reuther, Markus and Schlechte, Thomas}, title = {Optimization of Handouts for Rolling Stock Rotations Visualization}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-61430}, year = {2016}, abstract = {A railway operator creates (rolling stock) rotations in order to have a precise master plan for the operation of a timetable by railway vehicles. A rotation is considered as a cycle that multiply traverses a set of operational days while covering trips of the timetable. As it is well known, the proper creation of rolling stock rotations by, e.g., optimization algorithms is challenging and still a topical research subject. Nevertheless, we study a completely different but strongly related question in this paper, i.e.: How to visualize a rotation? For this purpose, we introduce a basic handout concept, which directly leads to the visualization, i.e., handout of a rotation. In our industrial application at DB Fernverkehr AG, the handout is exactly as important as the rotation itself. Moreover, it turns out that also other European railway operators use exactly the same methodology (but not terminology). Since a rotation can have many handouts of different quality, we show how to compute optimal ones through an integer program (IP) by standard software. In addition, a construction as well as an improvement heuristic are presented. Our computational results show that the heuristics are a very reliable standalone approach to quickly find near-optimal and even optimal handouts. The efficiency of the heuristics is shown via a computational comparison to the IP approach.}, language = {en} } @misc{BreugemBorndoerferSchlechteetal.2019, author = {Breugem, Thomas and Bornd{\"o}rfer, Ralf and Schlechte, Thomas and Schulz, Christof}, title = {A Three-Phase Heuristic for Cyclic Crew Rostering with Fairness Requirements}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-74297}, year = {2019}, abstract = {In this paper, we consider the Cyclic Crew Rostering Problem with Fairness Requirements (CCRP-FR). In this problem, attractive cyclic rosters have to be constructed for groups of employees, considering multiple, a priori determined, fairness levels. The attractiveness follows from the structure of the rosters (e.g., sufficient rest times and variation in work), whereas fairness is based on the work allocation among the different roster groups. We propose a three-phase heuristic for the CCRP-FR, which combines the strength of column generation techniques with a large-scale neighborhood search algorithm. The design of the heuristic assures that good solutions for all fairness levels are obtained quickly, and can still be further improved if additional running time is available. We evaluate the performance of the algorithm using real-world data from Netherlands Railways, and show that the heuristic finds close to optimal solutions for many of the considered instances. In particular, we show that the heuristic is able to quickly find major improvements upon the current sequential practice: For most instances, the heuristic is able to increase the attractiveness by at least 20\% in just a few minutes.}, language = {en} } @misc{SahinAhmadiBorndoerferetal.2019, author = {Sahin, Guvenc and Ahmadi, Amin and Bornd{\"o}rfer, Ralf and Schlechte, Thomas}, title = {Multi-Period Line Planning with Resource Transfers}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-74662}, year = {2019}, abstract = {Urban transportation systems are subject to a high level of variation and fluctuation in demand over the day. When this variation and fluctuation are observed in both time and space, it is crucial to develop line plans that are responsive to demand. A multi-period line planning approach that considers a changing demand during the planning horizon is proposed. If such systems are also subject to limitations of resources, a dynamic transfer of resources from one line to another throughout the planning horizon should also be considered. A mathematical modelling framework is developed to solve the line planning problem with transfer of resources during a finite length planning horizon of multiple periods. We analyze whether or not multi-period solutions outperform single period solutions in terms of feasibility and relevant costs. The importance of demand variation on multi-period solutions is investigated. We evaluate the impact of resource transfer constraints on the effectiveness of solutions. We also study the effect of line type designs and question the choice of period lengths along with the problem parameters that are significant for and sensitive to the optimality of solutions.}, language = {en} } @misc{GrimmBorndoerferSchlechte2019, author = {Grimm, Boris and Bornd{\"o}rfer, Ralf and Schlechte, Thomas}, title = {Re-optimizing ICE Rotations after a Tunnel Breakdown near Rastatt}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-73976}, year = {2019}, abstract = {Planning rolling stock movements in industrial passenger railway applications isa long-term process based on timetables which are also often valid for long periods of time. For these timetables and rotation plans, i.e., plans of railway vehicle movements are constructed as templates for these periods. During operation the rotation plans are affected by all kinds of unplanned events. An unusal example for that is the collapse of a tunnel ceiling near Rastatt in southern Germany due to construction works related to the renewal of the central station in Stuttgart. As a result the main railway connection between Stuttgart and Frankfurt am Main, located on top of the tunnel, had to be closed from August 12th to October 2nd 2017. This had a major impact on the railway network in southern Germany. Hence, all rotation plans and train schedules for both passenger and cargo traffic had to be revised. In this paper we focus on a case study for this situation and compute new rotation plans via mixed integer programming for the ICE high speed fleet of DB Fernverkehr AG one of the largest passenger railway companies in Europe. In our approach we take care of some side constraints to ensure a smooth continuation of the rotation plans after the disruption has ended.}, language = {en} } @misc{BorndoerferReutherSchlechteetal.2011, author = {Bornd{\"o}rfer, Ralf and Reuther, Markus and Schlechte, Thomas and Weider, Steffen}, title = {A Hypergraph Model for Railway Vehicle Rotation Planning}, issn = {1438-0064}, doi = {/10.4230/OASIcs.ATMOS.2011.146}, url = {http://nbn-resolving.de/urn:nbn:de:0030-drops-32746}, number = {11-36}, year = {2011}, abstract = {We propose a model for the integrated optimization of vehicle rotations and vehicle compositions in long distance railway passenger transport. The main contribution of the paper is a hypergraph model that is able to handle the challenging technical requirements as well as very general stipulations with respect to the ``regularity'' of a schedule. The hypergraph model directly generalizes network flow models, replacing arcs with hyperarcs. Although NP-hard in general, the model is computationally well-behaved in practice. High quality solutions can be produced in reasonable time using high performance Integer Programming techniques, in particular, column generation and rapid branching. We show that, in this way, large-scale real world instances of our cooperation partner DB Fernverkehr can be solved.}, language = {en} } @misc{GrimmBorndoerferSchulzetal.2019, author = {Grimm, Boris and Bornd{\"o}rfer, Ralf and Schulz, Christof and Weider, Steffen}, title = {The Rolling Stock Rotation Planning Problem under Revenue Considerations}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-71339}, year = {2019}, abstract = {In many railway undertakings a railway timetable is offered that is valid for a longer period of time. At DB Fernverkehr AG, one of our industrial partners, this results in a summer and a winter timetable. For both of these timetables rotation plans, i.e., a detailed plan of railway vehicle movements is constructed as a template for this period. Sometimes there are be periods where you know for sure that vehicle capacities are not sufficient to cover all trips of the timetable or to transport all passenger of the trips. Reasons for that could be a heavy increase of passenger flow, a heavy decrease of vehicle availability, impacts from nature, or even strikes of some employees. In such events the rolling stock rotations have to be adapted. Optimization methods are particularly valuable in such situations in order to maintain a best possible level of service or to maximize the expected revenue using the resources that are still available. In most cases found in the literature, a rescheduling based on a timetable update is done, followed by the construction of new rotations that reward the recovery of parts of the obsolete rotations. We consider a different, novel, and more integrated approach. The idea is to guide the cancellation of the trips or reconfiguration of the vehicle composition used to operate a trip of the timetable by the rotation planning process, which is based on the mixed integer programming approach presented in Reuther (2017). The goal is to minimize the operating costs while cancelling or operating a trip with an insufficient vehicle configuration in sense of passenger capacities inflicts opportunity costs and loss of revenue, which are based on an estimation of the expected number of passengers. The performance of the algorithms presented in two case studies, including real world scenarios from DB Fernverkehr AG and a railway operator in North America.}, language = {en} } @misc{BeckenbachHatzelWiederrecht2018, author = {Beckenbach, Isabel and Hatzel, Meike and Wiederrecht, Sebastian}, title = {The Tight Cut Decomposition of Matching Covered Uniformable Hypergraphs}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-71149}, year = {2018}, abstract = {The perfect matching polytope, i.e. the convex hull of (incidence vectors of) perfect matchings of a graph is used in many combinatorial algorithms. Kotzig, Lov{\´a}sz and Plummer developed a decomposition theory for graphs with perfect matchings and their corresponding polytopes known as the tight cut decomposition which breaks down every graph into a number of indecomposable graphs, so called bricks. For many properties that are of interest on graphs with perfect matchings, including the description of the perfect matching polytope, it suffices to consider these bricks. A key result by Lov{\´a}sz on the tight cut decomposition is that the list of bricks obtained is the same independent of the choice of tight cuts made during the tight cut decomposition procedure. This implies that finding a tight cut decomposition is polynomial time equivalent to finding a single tight cut. We generalise the notions of a tight cut, a tight cut contraction and a tight cut decomposition to hypergraphs. By providing an example, we show that the outcome of the tight cut decomposition on general hypergraphs is no longer unique. However, we are able to prove that the uniqueness of the tight cut decomposition is preserved on a slight generalisation of uniform hypergraphs. Moreover, we show how the tight cut decomposition leads to a decomposition of the perfect matching polytope of uniformable hypergraphs and that the recognition problem for tight cuts in uniformable hypergraphs is polynomial time solvable.}, language = {en} } @misc{BorndoerferEgererKarbsteinetal.2018, author = {Bornd{\"o}rfer, Ralf and Egerer, Ascan and Karbstein, Marika and Messerschmidt, Ralf and Perez, Marc and Pfisterer, Steven and Strauß, Petra}, title = {Kombil{\"o}sung: Optimierung des Liniennetzes in Karlsruhe}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-69677}, year = {2018}, abstract = {Wir beschreiben die Optimierung des Nahverkehrsnetzes der Stadt Karlsruhe im Zusammmenhang mit den Baumaßnahmen der sogenannten Kombil{\"o}sung.}, language = {de} } @misc{GrimmBorndoerferOlthoff2020, author = {Grimm, Boris and Bornd{\"o}rfer, Ralf and Olthoff, Mats}, title = {A Solution Approach to the Vehicle Routing Problem with Perishable Goods}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-77020}, year = {2020}, abstract = {This paper focuses on a special case of vehicle routing problem where perishable goods are considered. Deliveries have to be performed until a due date date, which may vary for different products. Storing products is prohibited. Since late deliveries have a direct impact on the revenues for these products, a precise demand prediction is important. In our practical case the product demands and vehicle driving times for the product delivery are dependent on weather conditions, i.e., temperatures, wind, and precipitation. In this paper the definition and a solution approach to the Vehicle Routing Problem with Perishable Goods is presented. The approach includes a procedure how historical weather data is used to predict demands and driving times. Its run time and solution quality is evaluated on different data sets given by the MOPTA Competition 2018.}, language = {en} } @misc{GrimmBorndoerferReutheretal.2020, author = {Grimm, Boris and Bornd{\"o}rfer, Ralf and Reuther, Markus and Schlechte, Thomas}, title = {A Cut Separation Approach for the Rolling Stock Rotation Problem with Vehicle Maintenance}, journal = {19th Symposium on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems (ATMOS 2019)}, issn = {1438-0064}, doi = {https://doi.org/10.4230/OASIcs.ATMOS.2019.1}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-75501}, year = {2020}, abstract = {For providing railway services the company's railway rolling stock is one if not the most important ingredient. It decides about the number of passenger or cargo trips the company can offer, about the quality a passenger experiences the train ride and it is often related to the image of the company itself. Thus, it is highly desired to have the available rolling stock in the best shape possible. Moreover, in many countries, as Germany where our industrial partner DB Fernverkehr AG (DBF) is located, laws enforce regular vehicle inspections to ensure the safety of the passengers. This leads to rolling stock optimization problems with complex rules for vehicle maintenance. This problem is well studied in the literature for example see Maroti and Kroon 2005, or Cordeau et. al. 2001 for applications including vehicle maintenance. The contribution of this paper is a new algorithmic approach to solve the Rolling Stock Rotation Problem for the ICE high speed train fleet of DBF with included vehicle maintenance. It is based on a relaxation of a mixed integer linear programming model with an iterative cut generation to enforce the feasibility of a solution of the relaxation in the solution space of the original problem. The resulting mixed integer linear programming model is based on a hypergraph approach presented in Bornd{\"o}rfer et. al. 2015. The new approach is tested on real world instances modeling different scenarios for the ICE high speed train network in Germany and compared to the approaches of Reuther 2017 that are in operation at DB Fernverkehr AG. The approach shows a significant reduction of the run time to produce solutions with comparable or even better objective function values.}, language = {en} } @misc{BorndoerferEulerKarbsteinetal.2018, author = {Bornd{\"o}rfer, Ralf and Euler, Ricardo and Karbstein, Marika and Mett, Fabian}, title = {Ein mathematisches Modell zur Beschreibung von Preissystemen im {\"o}V}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-70564}, year = {2018}, abstract = {Dieses Dokument fasst den Stand der mathematischen Modellierung von Preissystemen des {\"o}V mittels eines am ZIB entwickelten Tarifgraphenmodells zusammen. Damit sind sehr einfache und konzise Beschreibungen von Tarifstrukturen m{\"o}glich, die sich algorithmisch behandeln lassen: Durch das zeitgleiche Tracken eines Pfades im Routinggraphen im Tarifgraphen kann schon w{\"a}hrend einer Routenberechnung der Preis bestimmt werden. Wir beschreiben zun{\"a}chst das Konzept. Die konkrete Realisierung wird im Folgenden beispielhaft an den Tarifsystemen der Verkehrsverb{\"u}nde Warnow, MDV, Vogtland, Bremen/Niedersachsen, Berlin/Brandenburg und Mittelsachsen erl{\"a}utert. Anschließend folgen {\"U}berlegungen zur konkreten Implementierung von Kurzstrecken-Tarifen und zur Behandlung des Verbund{\"u}bergriffs.}, language = {de} } @misc{BorndoerferHoppmannKarbsteinetal.2018, author = {Bornd{\"o}rfer, Ralf and Hoppmann, Heide and Karbstein, Marika and Lindner, Niels}, title = {Separation of Cycle Inequalities in Periodic Timetabling}, issn = {1438-0064}, doi = {https://doi.org/10.1016/j.disopt.2019.100552}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-69746}, year = {2018}, abstract = {Cycle inequalities play an important role in the polyhedral study of the periodic timetabling problem. We give the first pseudo-polynomial time separation algo- rithm for cycle inequalities, and we give a rigorous proof for the pseudo-polynomial time separability of the change-cycle inequalities. Moreover, we provide several NP-completeness results, indicating that pseudo-polynomial time is best possible. The efficiency of these cutting planes is demonstrated on real-world instances of the periodic timetabling problem.}, language = {en} } @misc{ReutherBorndoerferSchlechteetal.2012, author = {Reuther, Markus and Bornd{\"o}rfer, Ralf and Schlechte, Thomas and Weider, Steffen}, title = {Integrated Optimization of Rolling Stock Rotations for Intercity Railways}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-16424}, year = {2012}, abstract = {This paper provides a highly integrated solution approach for rolling stock planning problems in the context of intercity passenger traffic. The main contributions are a generic hypergraph based mixed integer programming model and an integrated algorithm for the considered rolling stock rotation planning problem. The new developed approach is able to handle a very large set of industrial railway requirements, such as vehicle composition, maintenance constraints, infrastructure capacity, and regularity aspects. By the integration of this large bundle of technical railway aspects, we show that our approach has the power to produce implementable rolling stock rotations for our industrial cooperation partner DB Fernverkehr. This is the first time that the rolling stock rotations at DB Fernverkehr could be optimized by an automated system utilizing advanced mathematical programming techniques.}, language = {en} } @misc{BorndoerferMehrgardtReutheretal.2013, author = {Bornd{\"o}rfer, Ralf and Mehrgardt, Julika and Reuther, Markus and Schlechte, Thomas and Waas, Kerstin}, title = {Re-optimization of Rolling Stock Rotations}, issn = {1438-0064}, doi = {10.1007/978-3-319-07001-8_8}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-42569}, year = {2013}, abstract = {The Rolling Stock Rotation Problem is to schedule rail vehicles in order to cover timetabled trips by a cost optimal set of vehicle rotations. The problem integrates several facets of railway optimization, i.e., vehicle composition, maintenance constraints, and regularity aspects. In industrial applications existing schedules often have to be re-optimized to integrate timetable changes or construction sites. We present an integrated modeling and algorithmic approach for this task as well as computational results for industrial problem instances of DB Fernverkehr AG.}, language = {en} } @misc{BeckenbachScheidweiler2016, author = {Beckenbach, Isabel and Scheidweiler, Robert}, title = {Perfect f-Matchings and f-Factors in Hypergraphs - A Combinatorial Approach}, issn = {1438-0064}, doi = {10.1016/j.disc.2017.05.005}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-59071}, year = {2016}, abstract = {We prove characterizations of the existence of perfect f-matchings in uniform mengerian and perfect hypergraphs. Moreover, we investigate the f-factor problem in balanced hypergraphs. For uniform balanced hypergraphs we prove two existence theorems with purely combinatorial arguments, whereas for non-uniform balanced hypergraphs we show that the f-factor problem is NP-hard.}, language = {en} } @misc{BlancoBorndoerferHoangetal.2016, author = {Blanco, Marco and Bornd{\"o}rfer, Ralf and Hoang, Nam-Dung and Kaier, Anton and Schlechte, Thomas and Schlobach, Swen}, title = {The Shortest Path Problem with Crossing Costs}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-61240}, year = {2016}, abstract = {We introduce the shortest path problem with crossing costs (SPPCC), a shortest path problem in a directed graph, in which the objective function is the sum of arc weights and crossing costs. The former are independently paid for each arc used by the path, the latter need to be paid every time the path intersects certain sets of arcs, which we call regions. The SPPCC generalizes not only the classical shortest path problem but also variants such as the resource constrained shortest path problem and the minimum label path problem. We use the SPPCC to model the flight trajectory optimization problem with overflight costs. In this paper, we provide a comprehensive analysis of the problem. In particular, we identify efficient exact and approximation algorithms for the cases that are most relevant in practice.}, language = {en} } @misc{BeckenbachPeisSchaudtetal.2017, author = {Beckenbach, Isabel and Peis, Britta and Schaudt, Oliver and Scheidweiler, Robert}, title = {A Combinatorial Proof of a K{\"o}nig-type Theorem for Unimodular Hypergraphs}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-64017}, year = {2017}, abstract = {We state purely combinatorial proofs for K{\"o}nig- and Hall-type theorems for a wide class of combinatorial optimization problems. Our methods rely on relaxations of the matching and vertex cover problem and, moreover, on the strong coloring properties admitted by bipartite graphs and their generalizations.}, language = {en} } @misc{GrimmBorndoerferReutheretal.2017, author = {Grimm, Boris and Bornd{\"o}rfer, Ralf and Reuther, Markus and Schade, Stanley and Schlechte, Thomas}, title = {A Propagation Approach to Acyclic Rolling Stock Rotation Optimization}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-63930}, year = {2017}, abstract = {The rolling stock, i.e., railway vehicles, are one of the key ingredients of a running railway system. As it is well known, the offer of a railway company to their customers, i.e., the railway timetable, changes from time to time. Typical reasons for that are different timetables associated with different seasons, maintenance periods or holidays. Therefore, the regular lifetime of a timetable is split into (more or less) irregular periods where parts of the timetable are changed. In order to operate a railway timetable most railway companies set up sequences that define the operation of timetabled trips by a single physical railway vehicle called (rolling stock) rotations. Not surprisingly, the individual parts of a timetable also affect the rotations. More precisely, each of the parts brings up an acyclic rolling stock rotation problem with start and end conditions associated with the beginning and ending of the corresponding period. In this paper, we propose a propagation approach to deal with large planning horizons that are composed of many timetables with shorter individual lifetimes. The approach is based on an integer linear programming formulation that propagates rolling stock rotations through the irregular parts of the timetable while taking a large variety of operational requirements into account. This approach is implemented within the rolling stock rotation optimization framework ROTOR used by DB Fernverkehr AG, one of the leading railway operators in Europe. Computational results for real world scenarios are presented to evaluate the approach.}, language = {en} } @misc{FischerSchlechte2017, author = {Fischer, Frank and Schlechte, Thomas}, title = {Strong Relaxations for the Train Timetabling Problem using Connected Configurations}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-64743}, year = {2017}, abstract = {The task of the train timetabling problem or track allocation problem is to find conflict free schedules for a set of trains with predefined routes in a railway network. Especially for non-periodic instances models based on time expanded networks are often used. Unfortunately, the linear programming relaxation of these models is often extremely weak because these models do not describe combinatorial relations like overtaking possibilities very well. In this paper we extend the model by so called connected configuration subproblems. These subproblems perfectly describe feasible schedules of a small subset of trains (2-3) on consecutive track segments. In a Lagrangian relaxation approach we solve several of these subproblems together in order to produce solutions which consist of combinatorially compatible schedules along the track segments. The computational results on a mostly single track corridor taken from the INFORMS RAS Problem Solving Competition 2012 data indicate that our new solution approach is rather strong. Indeed, for this instance the solution of the Lagrangian relaxation is already integral.}, language = {en} } @misc{SchadeSchlechteWitzig2017, author = {Schade, Stanley and Schlechte, Thomas and Witzig, Jakob}, title = {Structure-based Decomposition for Pattern-Detection for Railway Timetables}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-64525}, year = {2017}, abstract = {We consider the problem of pattern detection in large scale railway timetables. This problem arises in rolling stock optimization planning in order to identify invariant sections of the timetable for which a cyclic rotation plan is adequate. We propose a dual reduction technique which leads to an decomposition and enumeration method. Computational results for real world instances demonstrate that the method is able to produce optimal solutions as fast as standard MIP solvers.}, language = {en} } @misc{RenkenAhmadiBorndoerferetal.2017, author = {Renken, Malte and Ahmadi, Amin and Bornd{\"o}rfer, Ralf and Sahin, Guvenc and Schlechte, Thomas}, title = {Demand-Driven Line Planning with Selfish Routing}, issn = {1438-0064}, doi = {10.1007/978-3-319-89920-6_91}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-64547}, year = {2017}, abstract = {Bus rapid transit systems in developing and newly industrialized countries are often operated at the limits of passenger capacity. In particular, demand during morning and afternoon peaks is hardly or even not covered with available line plans. In order to develop demand-driven line plans, we use two mathematical models in the form of integer programming problem formulations. While the actual demand data is specified with origin-destination pairs, the arc-based model considers the demand over the arcs derived from the origin-destination demand. In order to test the accuracy of the models in terms of demand satisfaction, we simulate the optimal solutions and compare number of transfers and travel times. We also question the effect of a selfish route choice behavior which in theory results in a Braess-like paradox by increasing the number of transfers when system capacity is increased with additional lines.}, language = {en} } @misc{BrettHobergPachecoetal.2015, author = {Brett, Charles and Hoberg, Rebecca and Pacheco, Meritxell and Smith, Kyle and Bornd{\"o}rfer, Ralf and Euler, Ricardo and Gamrath, Gerwin and Grimm, Boris and Heismann, Olga and Reuther, Markus and Schlechte, Thomas and Tesch, Alexander}, title = {G-RIPS 2014 RailLab - Towards robust rolling stock rotations}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-53475}, year = {2015}, abstract = {The Graduate-Level Research in Industrial Projects (G-RIPS) Program provides an opportunity for high-achieving graduate-level students to work in teams on a real-world research project proposed by a sponsor from industry or the public sector. Each G-RIPS team consists of four international students (two from the US and two from European universities), an academic mentor, and an industrial sponsor. This is the report of the Rail-Lab project on the definition and integration of robustness aspects into optimizing rolling stock schedules. In general, there is a trade-off for complex systems between robustness and efficiency. The ambitious goal was to explore this trade-off by implementing numerical simulations and developing analytic models. In rolling stock planning a very large set of industrial railway requirements, such as vehicle composition, maintenance constraints, infrastructure capacity, and regularity aspects, have to be considered in an integrated model. General hypergraphs provide the modeling power to tackle those requirements. Furthermore, integer programming approaches are able to produce high quality solutions for the deterministic problem. When stochastic time delays are considered, the mathematical programming problem is much more complex and presents additional challenges. Thus, we started with a basic variant of the deterministic case, i.e., we are only considering hypergraphs representing vehicle composition and regularity. We transfered solution approaches for robust optimization from the airline industry to the setting of railways and attained a reasonable measure of robustness. Finally, we present and discuss different methods to optimize this robustness measure.}, language = {en} } @misc{FischerGrimmKlugetal.2016, author = {Fischer, Frank and Grimm, Boris and Klug, Torsten and Schlechte, Thomas}, title = {A Re-optimization Approach for Train Dispatching}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-60493}, year = {2016}, abstract = {The Train Dispatching Problem (TDP) is to schedule trains through a network in a cost optimal way. Due to disturbances during operation existing track allocations often have to be re-scheduled and integrated into the timetable. This has to be done in seconds and with minimal timetable changes to guarantee smooth and conflict free operation. We present an integrated modeling approach for the re-optimization task using Mixed Integer Programming. Finally, we provide computational results for scenarios provided by the INFORMS RAS Problem Soling Competition 2012.}, language = {en} } @misc{BorndoerferKlugLamorgeseetal.2015, author = {Bornd{\"o}rfer, Ralf and Klug, Torsten and Lamorgese, Leonardo and Mannino, Carlo and Reuther, Markus and Schlechte, Thomas}, title = {Recent Success Stories on Optimization of Railway Systems}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-53726}, year = {2015}, abstract = {Planning and operating railway transportation systems is an extremely hard task due to the combinatorial complexity of the underlying discrete optimization problems, the technical intricacies, and the immense size of the problem instances. Because of that, however, mathematical models and optimization techniques can result in large gains for both railway cus- tomers and operators, e.g., in terms of cost reductions or service quality improvements. In the last years a large and growing group of researchers in the OR community have devoted their attention to this domain devel- oping mathematical models and optimization approaches to tackle many of the relevant problems in the railway planning process. However, there is still a gap to bridge between theory and practice, with a few notable exceptions. In this paper we address three success stories, namely, long-term freight train routing (part I), mid-term rolling stock rotation planning (part II), and real-time train dispatching (part III). In each case, we describe real-life, successful implementations. We will dis- cuss the individual problem setting, survey the optimization literature, and focus on particular aspects addressed by the mathematical models. We demonstrate on concrete applications how mathematical optimization can support railway planning and operations. This gives proof that math- ematical optimization can support the planning of rolling stock resources. Thus, mathematical models and optimization can lead to a greater effi- ciency of railway operations and will serve as a powerful and innovative tool to meet recent challenges of the railway industry.}, language = {en} } @misc{FuegenschuhJunoszaSzaniawskiKlugetal.2015, author = {F{\"u}genschuh, Armin and Junosza-Szaniawski, Konstanty and Klug, Torsten and Kwasiborski, Slawomir and Schlechte, Thomas}, title = {Fastest, average and quantile schedule}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-53592}, year = {2015}, abstract = {We consider problems concerning the scheduling of a set of trains on a single track. For every pair of trains there is a minimum headway, which every train must wait before it enters the track after another train. The speed of each train is also given. Hence for every schedule - a sequence of trains - we may compute the time that is at least needed for all trains to travel along the track in the given order. We give the solution to three problems: the fastest schedule, the average schedule, and the problem of quantile schedules. The last problem is a question about the smallest upper bound on the time of a given fraction of all possible schedules. We show how these problems are related to the travelling salesman problem. We prove NP-completeness of the fastest schedule problem, NP-hardness of quantile of schedules problem, and polynomiality of the average schedule problem. We also describe some algorithms for all three problems. In the solution of the quantile problem we give an algorithm, based on a reverse search method, generating with polynomial delay all Eulerian multigraphs with the given degree sequence and a bound on the number of such multigraphs. A better bound is left as an open question.}, language = {en} } @misc{BorndoerferReutherSchlechteetal.2015, author = {Bornd{\"o}rfer, Ralf and Reuther, Markus and Schlechte, Thomas and Schulz, Christof and Swarat, Elmar and Weider, Steffen}, title = {Duty Rostering in Public Transport - Facing Preferences, Fairness, and Fatigue}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-56070}, year = {2015}, abstract = {Duty rostering problems occur in different application contexts and come in different flavors. They give rise to very large scale integer programs which ypically have lots of solutions and extremely fractional LP relaxations. In such a situation, heuristics can be a viable algorithmic choice. We propose an mprovement method of the Lin-Kernighan type for the solution of duty rostering problems. We illustrate its versatility and solution quality on three different applications in public transit, vehicle routing, and airline rostering with a focus on the management of preferences, fairness, and fatigue, respectively.}, language = {en} } @misc{Beckenbach2017, author = {Beckenbach, Isabel}, title = {A Hypergraph Network Simplex Algorithm}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-64539}, year = {2017}, abstract = {We describe a network simplex algorithm for the minimum cost flow problem on graph-based hypergraphs which are directed hypergraphs of a particular form occurring in railway rotation planning. The algorithm is based on work of Cambini, Gallo, and Scutell{\`a} who developed a hypergraphic generalization of the network simplex algorithm. Their main theoretical result is the characterization of basis matrices. We give a similar characterization for graph-based hypergraphs and show that some operations of the simplex algorithm can be done combinatorially by exploiting the underlying digraph structure.}, language = {en} } @misc{FischerSchlechte2015, author = {Fischer, Frank and Schlechte, Thomas}, title = {Comparing two dual relaxations of large scale train timetabling problems}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-56068}, year = {2015}, abstract = {Railway transportation and in particular train timetabling is one of the basic and source application areas of combinatorial optimization and integer programming. We will discuss two well established modeling techniques for the train timetabling problem. In this paper we focus on one major ingredient - the bounding by dual relaxations. We compare two classical dual relaxations of large scale time expanded train timetabling problems - the Lagrangean Dual and Lagrangean Decomposition. We discuss the convergence behavior and show limitations of the Lagrangean Decomposition approach for a configuration based model. We introduce a third dualization approach to overcome those limitations. Finally, we present promising preliminary computational experiments that show that our new approach indeed has superior convergence properties.}, language = {en} } @misc{BorndoerferBreuerGrimmetal.2017, author = {Bornd{\"o}rfer, Ralf and Breuer, Matthias and Grimm, Boris and Reuther, Markus and Schade, Stanley and Schlechte, Thomas}, title = {Timetable Sparsification by Rolling Stock Rotation Optimization}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-65948}, year = {2017}, abstract = {Rolling stock optimization is a task that naturally arises by operating a railway system. It could be seen with different level of details. From a strategic perspective to have a rough plan which types of fleets to be bought to a more operational perspective to decide which coaches have to be maintained first. This paper presents a new approach to deal with rolling stock optimisation in case of a (long term) strike. Instead of constructing a completely new timetable for the strike period, we propose a mixed integer programming model that is able to choose appropriate trips from a given timetable to construct efficient tours of railway vehicles covering an optimized subset of trips, in terms of deadhead kilometers and importance of the trips. The decision which trip is preferred over the other is made by a simple evaluation method that is deduced from the network and trip defining data.}, language = {en} } @misc{SchadeBorndoerferBreueretal.2017, author = {Schade, Stanley and Bornd{\"o}rfer, Ralf and Breuer, Matthias and Grimm, Boris and Reuther, Markus and Schlechte, Thomas and Siebeneicher, Patrick}, title = {Pattern Detection For Large-Scale Railway Timetables}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-63390}, year = {2017}, abstract = {We consider railway timetables of our industrial partner DB Fernverkehr AG that operates the ICE high speed trains in the long-distance passenger railway network of Germany. Such a timetable covers a whole year with 364 days and, typically, includes more than 45,000 trips. A rolling stock rotation plan is not created for the whole timetable at once. Instead the timetable is divided into regular invariant sections and irregular deviations (e.g. for public holidays). A separate rotation plan with a weekly period can then be provided for each of the different sections of the timetable. We present an algorithmic approach to automatically recognize these sections. Together with the supplementing visualisation of the timetable this method has shown to be very relevant for our industrial partner.}, language = {en} } @misc{GilgKlugMartienssenetal.2017, author = {Gilg, Brady and Klug, Torsten and Martienssen, Rosemarie and Paat, Joseph and Schlechte, Thomas and Schulz, Christof and Seymen, Sinan and Tesch, Alexander}, title = {Conflict-Free Railway Track Assignment at Depots}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-63843}, year = {2017}, abstract = {Managing rolling stock with no passengers aboard is a critical component of railway operations. In particular, one problem is to park the rolling stock on a given set of tracks at the end of a day or service. Depending on the parking assignment, shunting may be required in order for a parked train to depart or for an incoming train to park. Given a collection of tracks M and a collection of trains T with fixed arrival-departure timetable, the train assignment problem (TAP) is to determine the maximum number of trains from T that can be parked on M according to the timetable and without the use of shunting. Hence, efficiently solving the TAP allows to quickly compute feasible parking schedules that do not require further shunting adjustments. In this paper, we present two integer programming models for solving the TAP. To our knowledge, this is the first integrated approach that considers track lengths along with the three most common types of parking tracks. We compare these models on a theoretical level. We also prove that a decision version of the TAP is NP-complete, justifying the use of integer programming techniques. Using stochastic and robust modelling techniques, both models produce parking assignments that are optimized and robust according to random train delays. We conclude with computational results for both models, observing that they perform well on real timetables.}, language = {en} } @misc{BorndoerferReutherSchlechte2014, author = {Bornd{\"o}rfer, Ralf and Reuther, Markus and Schlechte, Thomas}, title = {A Coarse-To-Fine Approach to the Railway Rolling Stock Rotation Problem}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-51009}, year = {2014}, abstract = {We propose a new coarse-to-fine approach to solve certain linear programs by column generation. The problems that we address contain layers corresponding to different levels of detail, i.e., coarse layers as well as fine layers. These layers are utilized to design efficient pricing rules. In a nutshell, the method shifts the pricing of a fine linear program to a coarse counterpart. In this way, major decisions are taken in the coarse layer, while minor details are tackled within the fine layer. We elucidate our methodology by an application to a complex railway rolling stock rotation problem. We provide comprehensive computational results that demonstrate the benefit of this new technique for the solution of large scale problems.}, language = {en} } @misc{BorndoerferKarbsteinMehrgardtetal.2014, author = {Bornd{\"o}rfer, Ralf and Karbstein, Marika and Mehrgardt, Julika and Reuther, Markus and Schlechte, Thomas}, title = {The Cycle Embedding Problem}, issn = {1438-0064}, doi = {10.1007/978-3-319-28697-6_65}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-52788}, year = {2014}, abstract = {Given two hypergraphs, representing a fine and a coarse "layer", and a cycle cover of the nodes of the coarse layer, the cycle embedding problem (CEP) asks for an embedding of the coarse cycles into the fine layer. The CEP is NP-hard for general hypergraphs, but it can be solved in polynomial time for graphs. We propose an integer rogramming formulation for the CEP that provides a complete escription of the CEP polytope for the graphical case. The CEP comes up in railway vehicle rotation scheduling. We present computational results for problem instances of DB Fernverkehr AG that justify a sequential coarse-first-fine-second planning approach.}, language = {en} } @misc{BeckenbachBorndoerfer2014, author = {Beckenbach, Isabel and Bornd{\"o}rfer, Ralf}, title = {An Approximation Result for Matchings in Partitioned Hypergraphs}, doi = {10.1007/978-3-319-28697-6_5}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-51083}, year = {2014}, abstract = {We investigate the matching and perfect matching polytopes of hypergraphs having a special structure, which we call partitioned hypergraphs. We show that the integrality gap of the standard LP-relaxation is at most \$2\sqrt{d}\$ for partitioned hypergraphs with parts of size \$\leq d\$. Furthermore, we show that this bound cannot be improved to \$\mathcal{O}(d^{0.5-\epsilon})\$.}, language = {en} } @misc{AhmadiGritzbachLundNguyenetal.2015, author = {Ahmadi, Sepideh and Gritzbach, Sascha F. and Lund-Nguyen, Kathryn and McCullough-Amal, Devita}, title = {Rolling Stock Rotation Optimization in Days of Strike: An Automated Approach for Creating an Alternative Timetable}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-56425}, year = {2015}, abstract = {The operation of a railway network as large as Deutsche Bahn's Intercity Express (ICE) hinges on a number of factors, such as the availability of personnel and the assignment of physical vehicles to a timetable schedule, a problem known as the rolling stock rotation problem (RSRP). In this paper, we consider the problem of creating an alternative timetable in the case that there is a long-term disruption, such as a strike, and the effects that this alternative timetable has on the resulting vehicle rotation plan. We define a priority measure via the Analytic Hierarchy Process (AHP) to determine the importance of each trip in the timetable and therefore which trips to cancel or retain. We then compare our results with those of a limited timetable manually designed by Deutsche Bahn (DB). We find that while our timetable results in a more expensive rotation plan, its flexibility lends itself to a number of simple improvements. Furthermore, our priority measure has the potential to be integrated into the rolling stock rotation optimization process, in particular, the Rotation Optimizer for Railways (ROTOR) software, via the cost function. Ultimately, our method provides the foundation for an automated way of creating a new timetable quickly, and potentially in conjunction with a new rotation plan, in the case of a limited scenario.}, language = {en} } @misc{BorndoerferSchulzSeidletal.2015, author = {Bornd{\"o}rfer, Ralf and Schulz, Christof and Seidl, Stephan and Weider, Steffen}, title = {Integration of Duty Scheduling and Rostering to Increase Driver Satisfaction}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-56299}, year = {2015}, abstract = {Integrated treatment of hitherto individual steps in the planning process of public transit companies discloses opportunities to reduce costs and to improve the quality of service. The arising integrated planning problems are complex and their solution requires the development of novel mathematical methods. This article proposes a mathematical optimization approach to integrate duty scheduling and rostering in public transit, which allows to significantly increase driver satisfaction at almost zero cost. This is important in order to to increase the attractiveness of the driver profession. The integration is based on coupling the subproblems by duty templates, which, compared to a coupling by duties, drastically reduces the problem complexity.}, language = {en} } @misc{BeckenbachBorndoerfer2015, author = {Beckenbach, Isabel and Bornd{\"o}rfer, Ralf}, title = {A Hall Condition for Normal Hypergraphs}, issn = {1438-0064}, doi = {10.1016/j.disc.2018.06.013}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-56175}, year = {2015}, abstract = {Conforti, Cornu{\´e}jols, Kapoor, and Vusković gave a Hall-type condition for the non-existence of a perfect matching in a balanced hypergraph. We generalize this result to the class of normal hypergraphs.}, language = {en} } @misc{BorndoerferReutherSchlechteetal.2012, author = {Bornd{\"o}rfer, Ralf and Reuther, Markus and Schlechte, Thomas and Weider, Steffen}, title = {Vehicle Rotation Planning for Intercity Railways}, issn = {1438-0064}, url = {http://nbn-resolving.de/urn:nbn:de:0297-zib-14731}, number = {12-11}, year = {2012}, abstract = {This paper provides a generic formulation for rolling stock planning problems in the context of intercity passenger traffic. The main contributions are a graph theoretical model and a Mixed-Integer-Programming formulation that integrate all main requirements of the considered Vehicle-Rotation-Planning problem (VRPP). We show that it is possible to solve this model for real-world instances provided by our industrial partner DB Fernverkehr AG using modern algorithms and computers.}, language = {en} }