TY - GEN A1 - Eng, W.K. A1 - Ott, Holly C. A1 - Mei, C.S. T1 - Optimising Process Flows in Dragon Fruit Jam Production KW - Case Study Y1 - 2020 ER - TY - GEN A1 - Ott, Holly C. T1 - Six-Sigma Production Process Improvement at Kopschitz Kerzen GmbH KW - Case Study Y1 - 2020 ER - TY - GEN A1 - Ott, Holly C. ED - The Case Centre, T1 - Process Quality Monitoring at Altis Semiconductor KW - Case Study Y1 - 2020 ER - TY - GEN A1 - Ott, Holly C. T1 - Using the DMAIC Process Improvement Flow at Hanwag GmbH KW - Case Study Y1 - 2020 ER - TY - GEN A1 - Ott, Holly C. T1 - SPC at Melon Helmets, Production Problem at Melon Helmets KW - Case Study Y1 - 2020 ER - TY - GEN A1 - Ott, Holly C. T1 - Aligning Operational Incentives in Project Management KW - Case Study Y1 - 2020 ER - TY - GEN A1 - Ott, Holly C. T1 - Developing Local Leadership in Asian Operations KW - Case Study Y1 - 2020 ER -